引文
[1]吴树仁.突发地质灾害研究某些新进展[J].地质力学学报,2006,12(2):265-273.
[2]Fell R,Ho K K S,Lacasse S,et al.A framework for landslide risk as sessment and management[C]//The International Conference on Land-slide Risk Management.Vancouver,Canada:A.A.Balkema Publish-ers,2005:3-26.
[3]AGS.Guideline for landslide susceptibility,hazard and risk zoning for land use management.Australian geomechanics society landslide task-force landslide zoning working group[J].Australian Geomechanics,2007,42(1):13-36.
[4]AGS.Commentary on guideline for landslide susceptibility,hazard and risk zoning for land use management.Australian geomechanics society landslide taskforce landslide zoning working group[J].Australian Geomechanics,2007,42(1):37-62.
[5]AGS.Commentary on guideline for landslide susceptibility,hazard and risk zoning for land use management.Australian geomechanics society landslide taskforce landslide zoning working group[J].Australian Geomechanics,2007,42(1):63-114.
[6]AGS.Commentary on guideline for landslide susceptibility,hazard and risk zoning for land use management.Australian geomechanics society landslide taskforce landslide zoning working group[J].Australian Geomechanics,2007,42(1):115-158.
[7]吴树仁,石菊松,王涛.突发地质灾害预测评价[J].地质通报,2008,27(11):1753-1763.
[8]Robin Fell,Jordi Corominas,Christophe Bonnard,et al.Guidelines for landslide susceptibility,hazard and risk zoning for land-use plan-ning[J].Engineering Geology,2008,102:85-98.
[9]Robin Fell,Jordi Corominas,Christophe Bonnard,et al.Guidelines for landslide susceptibility,hazard and risk zoning for land-use plan-ning[J].Engineering Geology,2008,102:99-111.
[10]Dai F C,Lee C F,Ngai Y Y.Landslide risk assessment and man-agement:an overview[J].Engineering Geology,2002,64(1):65-87.
[11]Van Westen C J,Van Asch T W J,Socters R.Landslide hazard and risk zonation—Why is it still so difficult?[J].Bull.Eng.Geol.Env.,2005,64:5-23.
[12]Jordi Corominas,JoséMoya.A review of assessing landslide frequen-cy for hazard zoning purposes[J].Engineering Geology,2008,102:193-213.
[13]Wong H N.Landslide risk assessment for individual facilities[C]//The International Conference on Landslide Risk Management.Vancouver,Canada:A.A.Balkema Publishers,2005:237-296.
[14]Kaynia A M,Papathoma-K觟hle M,Neuh覿user B,et al.Proba-bilistic assessment of vulnerability to landslide:Application to the village of Lichtenstein,Baden-Württemberg,Germany[J].Engineer-ing Geology,2008,101:33-48.
[15]张梁,张业成,罗元华,等.地质灾害灾情评价理论与实践[M].北京:地质出版社,1998.
[16]张春山,吴满路,张业成.地质灾害风险评价方法及展望[J].中国地质灾害与防治学报,2003,12(1):96-102.
[17]成永刚.近二十年来国内滑坡研究的现状及动态[J].地质灾害与环境保护,2003,14(4):1.
[18]石菊松,石玲,吴树仁.滑坡风险评估的难点和进展[J].地质论评,2007,53(6):797-806.
[19]Fell R,Ho K K S,Lacasse S,et al.Estimating landslides motion mechanism,travel distance and velocity[C]//Hungr O,Fell R,Coun-ture R,et al.Landslide Risk Management.Vancouver,Canada:A.A.Balkema Publishers,2005:99-128.
[20]Leroi E,Bonnard Ch,Fell R,et al.Risk assessment and management[C]//Hungr O,Fell R,Counture R,et al.Landslide Risk Manage-ment.Vancouver,Canada:A.A.Balkema Publishers,2005:159-198.
[21]Leroi E,Bonnard Ch,Corominas J,et al.Landslide hazard and risk zoning for urban planning and development[C]//Hungr O,Fell R,Counture R,et al.Landslide Risk Management.Vancouver,Cana-da:A.A.Balkema Publishers,2005:199-236.
[22]Wilson R A,Moon A T,Hendrickx M,et al.Application of quanti-tative risk assessment to the Lawrence Hargrave Drive Project,New South Wales,Australia[C]//Hungr O,Fell R,Counture R,et al.Landslide Risk Management.Vancouver,Canada:A.A.Balkema Publishers,2005:589-588.
[23]Thomas Nix,Oswald Marinoni.Quantitative landslide risk analysis and risk evaluation for publicly accessible geosites[M].IAEG,2006.
[24]沈娜.唐川金沙江水电站工程区典型单体滑坡风险评价探讨[J].云南地理环境研究,2008,20(1):45-51.
[25]唐亚明,张茂省,薛强.陕西延安虎头峁滑坡社会风险评价[J].地质通报,2008,27(11):1780-1786.
[26]Francesca Ardizzone,Mauro Cardinali,Fausto Guzzetti,et al.Landslide hazard assessment,vulnerability,estimation,and risk evaluation at the basin scale[C]//The First World Landslide Forum,Parallel Session Volume.2008:71-74.
[27]Marco Uzielli,Farrokh Nadim,Suzanne Lacasse,et al.A concep-tual framework for quantitative estimation of physical vulnerability to landslides[J].Engineering Geology,2008,102:251-256.
[28]中国地震局震害防治司.汶川8级地震未校正加速度记录[J].中国强震记录汇报,2008,12(1):1-90.
[29]中国地震局《中国岩石圈动力学图集》编委会.中国岩石圈动力学图集[M].北京:中国地图出版社,1989.
[30]陈永明,石玉成,王旭东.天水麦积山石窟地震构造环境评价[J].敦煌研究,2005,5:78-82.
[31]潘建雄,吴业彪,张玉油,等.关于1556年华县大地震及岳阳地震的讨论[J].地震地质,1993,15(3):261-263.
[32]冉洪流.海原断裂带M≥6.7地震概率及其震级分布[J].地震学报,2004,26(6):609-615.
[33]袁丽侠.海原大地震极震区内烈度衰减异常探讨[J].防灾减灾工程学报,2004,24(2):441-445.
[34]中华人民共和国国家标准(GB18306-2001):中国地震动参数区划图及说明书[S].北京:中国计划出版社,2001.
[35]石玉成,王兰民,张颖.黄土场地覆盖层厚度和地形条件对地震动放大效应的影响[J].西北地震学报,1999,12(2):203-208.
[36]吴玮江,王念秦.黄土滑坡的基本类型与活动特征[J].中国地质灾害与防治学报,2006,13(2):36-40.
[37]徐张建,林在贯,张茂省.中国黄土与黄土滑坡[J].岩石力学与工程学报,2007,26(7):1297-1312.
[38]姚清林.中国西北黄土地区地震崩滑的分布与宏观影响因素[J].气象与减灾研究,2007,30(1):41-47.
[39]王兰民.黄土动力学[M].北京:地震出版社,2003:1-331.
[40]李保雄,王得楷.黄土滑坡空间预报的一种新理论[J].甘肃科学学报,1998,10(4):57-58.
[41]董书宁,李保雄.黄土滑坡的空间预报[J].煤田地质与勘探,2000,28(6):46-47.
[42]王念秦,张倬元,王家鼎.一种典型黄土滑坡的滑距预测方法[J].西北大学学报(自然科学版),2003,33(1):111-114.
[43]李典庆,吴帅兵.考虑时间效应的滑坡风险评估和管理[J].岩土力学,2006,27(12):2239-2249.