水工隧道衬砌地震作用力计算方法探讨
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
在进行水工隧道衬砌地震作用力计算时,目前采用的解析方法存在加力困难,数值计算方法对初始应力场的使用方法不严密,两种方法对围岩类别和埋深的影响考虑不充分并且计算结果相差较大。针对存在的这些问题,改进了荷载施加方式,修正了初始应力场,得到了比较满意的结果。
There are four problems in calculating the seismic force of hydraulic tunnel lining by using analytical and numerical methods:(a) the force is difficult to apply on structure by using analytical method;(b) the adoption of initial stress field in numerical method is imprecise;(c) the results calculated by two methods have greater difference;and(d) the influences caused by surrounding rock classification and the depth of tunnel are not being considered enough in two methods.For solving these problems,the improvements on load application and initial tress field correction are conducted herein.The results calculated by improved methods are satisfactory.
引文
[1]Deng Feihuang,Mo Haihong,Zeng Qingjun.Analysis of the DynamicResponse of a Shield Tunnel in Soft Soil Under a Metro-TrainVi brating Load[J].China Unit of Mining&Tech,2006,4(16):509-513.
    [2]郑颖人,沈珠江,龚晓南.岩土塑性力学原理[M].北京:中国建筑工业出版社,2003.
    [3]李围.隧道及地下工程ANSYS实例分析[M].北京:中国水利水电出版社,2008.
    [4]Dao V H.Tunnel design considering stress release effect[J].WaterScience and Engineering,2009,2(3):87-95.
    [5]高峰.静应力场对隧道列车振动响应的影响分析[J].岩土工程学报,2009(7):1105-1109.
    [6]章泳健,金先龙,王建炜,等.基于动力松弛原理的地下隧道工程初始应力场计算方法研究[J].现代隧道技术,2010,47(4):6-11.
    [7]张美聪.圆形盾构隧道衬砌管片的计算分析[J].现代隧道技术,2009,46(5):23-27.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心