用户名: 密码: 验证码:
Drilling Construction Technology of φ3.8 m Bored Grouting Pile in Jiaxing-Shaoxing River-Spanning Bridge
详细信息   
摘要
The drilling construction technology of borehole with super-large diameter of 3.8 m in Jiaxing-Shaoxing river-spanning bridge is introduced: steel casing sinking,mud circulation system arrangement,drill and bit selection,performance of wall protection mud and technical parameters determination and main technical measures in drilling construction process.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700