引文
[1]王金英,赵冬岩.渤海海底管道工程的现状、特点和问题[J].石油学报,1993,14(4):134-140.
[2]MMS.Proceeding of the international workshop on the damage to underwater pipelines[R].New Orleans U.S.A.Minerals ManagementService,1995.
[3]夏兰廷,黄桂桥,张三平等著.金属材料的海洋腐蚀与防护[M].北京:冶金工业出版社,2003.
[4]方华灿.油气长输管线的安全可靠性分析[M].北京:石油工业出版社,2002.
[5]赵金州,喻西崇,李长俊.缺陷管道使用性评价技术[M].北京:中国石化出版社,2005.
[6]ASME B31G,Manual of determining the remaining strength of corroded pipelines[S].
[7]API RP579,Recommended practice for fitness-for-service[S].
[8]BS 7910,Guidance on the method for assessing the acceptability for flaws in fusion welded structure[S].
[9]DNV RP-F101,Recommend Practice corroded pipelines[S].
[10]CAN/CSA-Z184-M86,Gas pipeline system[S].
[11]Kinfer J F.Corroded pipe:strength and repair methods[A].Fifth Symposium Line Pipe Research Paper L1[C],USA,1971.
[12]Kinfer J F,Vieth PH.New method corrects criterion for evaluation corroded pipe[J].Oil and Gas Journal,1990,6:56-59.
[13]Bjφrnφy O H,Marley M J.Assessment of corroded pipelines:past,present and future[A].Proceedings of the Eleventh InternationalOffshore and Polar Engineering Conference[C],Stavanger,Norway,June,2001.
[14]Choi J B,Goo B K.Development of limit load solutions for corroded gas pipelines[J].International Journal of Pressure Vessels andPiping,2003,80:121-128.
[15]Zhu X K,Leis B N.Strength criteria and analytic predictions of failure pressure in corroded line pipes[A].Proceedings of the Thir-teenth International Offshore and Polar Engineering Conference[C],Honolulu,USA,May 2003,8-15.
[16]Zhu X K,Leis B N.Influence of yield-to-tensile strength ratio on failure assessment of corroded pipelines[J].Journal of Pressure Ves-sel Technology,2005,127:436-442.
[17]Lee O S,Kim H J.Effect of external corrosion in pipeline on failure prediction[J].Journal of the Korean Society of Precision Engi-neering,2000,2(1):48-54.
[18]Netto T A,Ferraz U S,Estefen S F.The effect of corrosion defects on the burst pressure of pipelines[J].Journal of ConstructionalSteel Research,2005,61:1185-1204.
[19]蔡文军,陈国明,潘东民.腐蚀管线剩余强度非线性分析[J].石油学报(自然学科版),1999,23(1):66-68.
[20]蔡文军,陈国明,潘东民.等.腐蚀管线剩余强度评估的研究进展[J].石油机械,1999,27(11):47-49.
[21]韩良浩,柳曾典.内压作用下局部减薄管道的极限荷载分析[J].压力容器,1998,4:1-4.
[22]Kanninen M F,Broek D,Hahn G T,et al.Toward an elastic fracture mechanics predictive capability for reactor piping[J].NuclearEngineer Design,1978,48:117-134.
[23]韩良浩,柳曾典.弯曲荷载作用下局部减薄管道的极限荷载分析[J].压力容器,1998,6:1-4.
[24]Han L H,He S Y.Limit moment of local wall thinning in pipe under bending[J].International Journal of Pressure Vessels and Pip-ing,1999,76:539-542.
[25]林冠发,李金波,仝明信,等.含缺陷管件的抗弯曲特性[J].钢铁,2005,40(12):41-45.
[26]Zheng M,Luo J H.Modified expression for estimation the limit bending moment of local corroded pipeline[J].International Journal ofPressure Vessels and Piping,2004,81:725-729.
[27]Miyazaki K,Kanno S,Ishiwata M,Hasegawa K,et al.Fracture behavior of carbon steel pipe with local wall thinning subjected tobending load[J].Nuclear Engineering and Design,1999,191:195-204.
[28]Miyazaki K,Kanno S,Ishiwata M,et al.Fracture and general yield for carbon steel pipes with local wall thinning[J].Nuclear Engi-neering and Design,2002,211:61-68.
[29]Ahn S H,Nam K W,Yoo Y S,et al.Fracture behavior of straight pipe and elbow with local wall thinning[J].Nuclear Engineeringand Design,2002,211:91-103.
[30]Ahn S H,Nam K W,Yoo Y S,et al.Comparison of experimental and finite element analytical results for the strength ad the deforma-tion of pipes with local wall thinning subjected to bending moment[J].Nuclear Engineering and Design,2006,236:140-155.
[31]Kim J W,Park C Y.Effect of length of thinning area on the failure behavior of carbon steel pipe containing a defect of wall thinning[J].Nuclear Engineering and Design,2003,220:274-284.
[32]沈士明,孙洪彬,郑逸翔.含腐蚀凹坑缺陷管道的极限载荷研究[J].石油机械,2000,28(10):23-26.
[33]沈士明,郑逸翔.含局部减薄缺陷管道的极限荷载与安全评定[J].石油机械,2004,32(6):17-20.
[34]Hauch S R,Bai Y.Bending moment capacity of pipes[J].Journal of Offshore Mechanics and Arctic Engineering,2000,122:243-252.
[35]Hauch S R,Bai Y.Bending moment capacity of groove corroded pipes[A].Proceeding of the Tenth International Offshore and PolarEngineering Conference[C].Seattle,USA,May,2000.
[36]Bai Y,Hauch S R.Collapse capacity of corroded pipes under combined pressure,Longitudinal Force and Bending[J].InternationalJournal of Offshore and Polar Engineering,2001,11(1):55-63.
[37]Bai Y,Hauch S R.Local buckling and plastic collapse of corroded pipes with yield anisotropy[A].Proceeding of the Ninth Interna-tional Offshore and Polar Engineering Conference[C].1999.
[38]Galambos T V.Guide to stability design criteria for metal structures[M].5th Edition,John Wiley&Sons,1998.
[39]Chouchaoui B A,Pick R J.Behaviour of circumferentially aligned corrosion pits[J].International Journal of Pressure Vessels and Pip-ing,1994,57:197-200.
[40]Chouchaoui B A,Pick R J.Behavior of longitudinally aligned corrosion pits[J].International Journal of Pressure Vessels and Piping,1996,67:17-35.
[41]Roy S,Grigory S C,Smith M,et al.Numerical simulations of full-scale corroded pipe tests with combined loading[J].Journal ofPressure Vessel Technology,1997,119(4):457-466.
[42]Alves J L Roehl D.Numerical Evaluation of load capacity of corroded pipes[A].International Conference on Pipeline Engineering andConstruction[C].2003.1228-1237.
[43]Grigory S C,Smith M Q.Residual strength of 48-inch diameter corroded pipe determined by full scale combined loading experiments[A].ASME International Pipeline Conference[C].1996.1:377-386.
[44]Shim D J,Choi J B,Kim Y J.Failure strength assessment of pipes with local wall thinning under combined loading based on finite ele-ment analyses[J].Journal of Pressure Vessel Technology,2004 126:179-183.
[45]Kim Y J,Shim D J,Lim H,et al.Reference stress based approach to predict failure strength of pipes with local wall thinning undersingle loading[J].Journal of Pressure Vessel Technology,2004 126:194-201.
[46]Shim D J,Kim Y J,Kim Y J.Reference stress based approach to predict failure strength of pipes with local wall thinning under com-bined loading[J].Journal of Pressure Vessel Technology,2005,127:77-83.
[47]周晶,李昕,马恒春,等.地震时海底悬跨管道动力特性试验研究[J].水利学报,2003,1:12-16.
[48]周晶,李昕,范颖芳.海底悬跨管线地震反应分析[J].工程力学(增刊),2003,10:131-144.
[49]李昕,刘亚坤,周晶,等.海底悬管道动力响应的实验研究和数值模拟[J].工程力学,2003,20:21-25.
[50]孙政策,段梦兰,张文,等.现用海底管线抗震设计方法存在问题和解决方法[J].振动工程学报,2004,17(3):263-268.
[51]孙政策,段梦兰,张文,等.地震波条件下海底管线抗震设计方法研究[J].石油学报,2005,25(2):115-121.
[52]Kalliontzis C.Numerical simulation of submarine pipelines in dynamic contact with a moving seabed[J].Earthquake Engineering andStructural Dynamics,1998,27:465-486.
[53]Kershenbaum N Y,Mebarkia S A,Choi H S.Behavior of marine pipelines under seismic faults[J].Ocean Engineering,2000,27:473-487.
[54]Miyazaki K,Nebu A,Ishiwata M,et al.Fracture strength and behavior of carbon steel pipes with local thing subjected to cyclic bend-ing load[J].Nuclear Engineering and Design,2002,214:127-136.
[55]Hasegawa K,Sakata K,Miyazaki K,et al.Fatigue strength for pipes with allowable flaws and design fatigue curve[J].InternationalJournal of Pressure Vessels and Piping,2002,79:37-44.
[56]Nakamura I,Otani A,Shiratori M.Failure behavior of piping systems with wall thinning under seismic loading[J].Journal of PressureVessel Technology,2004,126:85-90.
[57]侯宝容.海洋腐蚀环境理论及其应用[M].北京:科学出版社,1999.
[58]韩玉梅,韩恩厚,郑宇礼,等.X56管线钢的腐蚀疲劳试验研究[J].机械强度,1994,16(1):77-79.
[59]余建星,俞永情,李红涛,等.海底管跨涡激振动疲劳可靠性研究[J].船舶力学,2005,9(2):109-114.
[60]罗延生,方华灿.海底管线管跨段疲劳失效综合模糊评判模型的分析[J].中国海洋平台,1999,14(1):1-4.
[61]Xu T,Lauridsen B,Bai Y.Wave-induced fatigue of multi-span pipelines[J].Marine Structure,1999,12:83-106.
[62]Cronin D S.Assessment of corrosion damage in pipelines[D].PhD Thesis.Department of Mechanic Engineering,University ofWartoo,2000.
[63]Cronin D S,Roy J.Pick Prediction of the failure pressure for complex corrosion defects[J].International Journal of Pressure Vesselsand Piping,2002,79:279-287.
[64]Coulson K,Worthingham R.New guidelines promise more accurate damage assessment[J].Oil and Gas Journal,1990,88(16):41-45.
[65]Coulson K,Worthingham R.Standard damage-assessment approach is overly conservative[J].Oil and Gas Journal,1990,88(26):54-58.
[66]O’Grady T,Hisey D,Kiefner J.A systematic method for the evaluation of corroded pipelines[J].Pipeline Engineering,ASME1992,46:27-35.
[67]Hopkin P,Jones D G.A study of the behavior of long and complex-shaped corrosion in transmission pipelines[A].Proceedings of Off-shore Mechanic and Arctic engineering[C].1992.
[68]董事尔,何东升,张鹏,等.双点腐蚀管道的弹塑性有限元分析[J].机械,2005,32(9):20-22.