预应力混凝土管桩在火电厂主厂房地基处理中的应用
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
结合某600 MW机组大型火力发电厂主厂房采用预应力混凝土管桩进行地基处理的工程实例,介绍了预应力混凝土管桩在具有一定厚度砂夹层的地质条件下的适用性、可行性及对施工机械的要求.试桩及工程桩的施工与检测结果表明,对于类似于本工程且具有一定厚度砂夹层的地质条件,采用预应力混凝土管桩是可行的,有关工程经验可供类似工程和国内同行借鉴与参考.
According to an engineering example of applying prestressed concrete pipe piles for foundation treatment to the main powerhouse in a certain 600 MW thermal power plant,the applicability,feasibility and demand for construction machinery of prestressed concrete pipe piles,are described;in the geological conditions containing sand laminae with certain thickness.Based on construction and test results of test piles and engineering piles,applying prestressed concrete pipe piles to geological conditions similar to that mentioned is available;and relevant engineering experience can provide reference for designers involved in similar projects.
引文
[1]高倚山,张剑锋.高强度预应力管桩(PHC桩)在电力工程中的应用[J].电力勘测,2001,(2):5-10.
    [2]戴洪军,蔡升华,郭纪中.预应力管桩承载力分析[J].电力勘测,2001,(2):6-11.
    [3]宋建军.锤击预应力管桩单桩竖向承载力的试验研究[J].工业建筑,1999,(8):44-48.
    [4]阮起楠.地震区预应力混凝土管桩设计探讨[J].混凝土与水泥制品,2000,(4):23-28.
    [5]李雪超,瞿启忠,季彩群,等.超高强预应力混凝土管桩(PHC桩)施工技术[J].建筑技术,2000,(3):164-166.
    [6]郭秦渭.预应力混凝土管桩在7度以上抗震设防区的应用研究[J].建筑结构,2008,(10):109-111,53.
    [7]JGJ 94-2008,建筑桩基技术规范[S].北京:中国建筑工业出版社,2008.