介绍了某高层钢筋混凝土框架-剪力墙结构设计,包括地下室托换结构设计、上部结构设计、沉降观测等。由于地铁通道从该建筑物底部穿越,故地下室采用了利用整层高度来受力的托换结构。整体结构分析结果表明托换前后结构特性变化不大,沉降观测结果表明采用了托换结构后整体结构沉降均匀。
Design of a high-rise reinforced concrete frame-shear wall structure was presented,which includes the underpinning structure design at basement,the upper structure design and the settlement observation.Because the subway tunnel will pass through the bottom of the building,the underpinning structure which utilizing the whole storey for bearing structure was used at the basement.The structural analysis shows that the underpinning structure behaviors are similar with the original structure.The observation shows that the settlement of the structure with the underpinning structure is uniform.
引文
[1]王世君.桩基托换技术在广州地铁三号线工程中的应用[J].施工技术,2006,35(6):49-52.
    [2]焦勃,赵东,周波.新加坡樟宜机场地铁站基础托换施工技术[J].济南大学学报,2002,16(3):299-301.
    [3]JGJ3—2002高层建筑混凝土结构技术规程[S].北京:中国建筑工业出版社,2002.
    [4]JGJ/T8—97建筑变形测量规程[S].北京:中国建筑工业出版社,1997.
    [5]傅玉勇,闫澍旺,胡子学,等.层状场地中地铁隧道对邻近建筑物地震反应的影响[J].建筑结构,2009,39(11):46-49.
    [6]邹永发.某工程基础顶板厚板转换的结构设计[J].建筑结构,2009,39(5):118-120.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心