引文
[1]李黎,尹鹏.一种橡胶铅芯阻尼器[P].专利号ZL200820192806.5.(Li Li,Yin Peng.A Lead-core rubberdamper[P].Patent no.200820192806.5(.in Chinese))
[2]李黎,尹鹏.大跨越输电塔-线体系风振控制研究[J].工程力学,2008,25(2):213-229(Li Li,Yin Peng.The researchon wind-induced vibration control for large-span electricaltransmission tower-line system[J].Engineering Mechanics,2008,25(Ⅱ):213-228(in Chinese))
[3]尹鹏,李黎,梁政平.粘弹铅芯阻尼器在控制输电塔风振反应中的应用[J].振动与冲击,2007,26(8):1-4(YinPeng,Li Li,Liang Zhengping.Wind-induced vibration controlfor electrical transmission towers by using lead viscoelasticdampe[rsJ].Journal of Vibration and Shock,2007,26(8):1-4,8-9(in Chinese))
[4]Yin Peng,Li Li,Hu Liangxia.Wind-induced vibrationcontrol of long-span power transmission tower[J].Journal ofChongqing University English Edition,2009,8(2):112-124
[5]Liang Zhengping,Li Li,Yin Peng et al.Application of leadviscoelastic dampers to wind vibration control on long-spanpower transmission tower[J].Journal of Southwest JiaotongUniversity,2008,16(4):320-328
[6]尹鹏,李黎,胡亮霞,等.橡胶铅芯阻尼器控制下输电塔风振响应研究[J].电力建设,2008,29(10):1-4(YinPeng,Li Li,Hu Liangxia,et al.Study on transmission toweraeolian vibration control using lead-core rubber damper[J].Electric Power Construction,2008,29(10):1-4(.in Chinese))
[7]尹鹏,李黎,胡亮霞,等.大跨越输电塔的地震响应研究[J].电力建设,2008,29(12):13-17(Yin Peng,Li Li,HuLiangxia,et al.Study on seismic responses of large crossingspan transmission towers[J].Electric Power Construction,2008,29(12):13-17(in Chinese))
[8]尹鹏,李黎,胡亮霞,等.橡胶铅芯阻尼器控制下输电塔风振系数研究[J].水电能源科学,2009,27(1):187-191(Yin Peng,Li Li,Hu Liangxia,et al.Research ofwind-induced vibration coefficient for transmission towersusing lead rubber dampers[J].Water Resources and Power,2009,27(1):187-191(in Chinese))
[9]李黎,张行,尹鹏.大跨越输电线路脱冰跳跃反应的控制研究[J].振动与冲击,2008,27(10):61-64(Li Li,Zhang Hang,Yin Peng.Investigation on the control of thejumping induced by the ice-shedding of the big-spantransmission lines[J].Journal of Vibration and Shock,2008,27(10):61-64(in Chinese))
[10]李黎,尹鹏,王开明,等.不同风向角动风下大跨越输电塔风振响应分析[J].武汉理工大学学报,2009,31(23):68-76(Li Li,Yin Peng,Wang Kaiming,et al.Analysis of wind-induced vibration for big2span electricaltransmission tower under different wind directions[J].Journal of Wuhan University of Technology,2009,31(23):68-76(in Chinese))
[11]张行,李黎,尹鹏.地震作用下大跨越输电塔弹性动力稳定性能探讨[J].电力建设,2008,29(11):6-11(Zhang Hang,Li Li,Yin Peng.Study on large spantransmission tower elastic dynamic stability under earthquake[J].Electric Power Construction,2008,29(11):6-11(inChinese))
[12]胡亮霞,李黎,尹鹏.橡胶铅芯阻尼器控制下大跨越输电塔可靠性分析[J].电力建设,2008,29(11):19-23(Hu Liangxia,Li Li,Yin Peng.Reliability analysis of largespan transmission tower controlled by lead-core rubberdampers[J].Electric Power Construction,2008,29(11):19-23(in Chinese))
[13]梁峰,李黎,尹鹏.大跨越塔-线体系数值分析模型的研究[J].振动与冲击,2007,26(2):61-65(Liang Feng,Li Li,Yin Peng.Investigation on numerical model ofelectrical transmission tower-line system with a big span.Journal of Vibration and Shock[J].2007,26(2):61-65(in Chinese))