建筑工程深基坑降水方案设计——以江苏省徐塘电厂为例
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
深基坑降水是确保地质工程安全的重要工程技术措施。以江苏省徐塘电厂翻车机室基坑降水方案确定为例,论述了建筑工程深基坑降水方案设计方法,得到了疏干降水量以及降水井数量。通过徐塘电厂翻车机室基坑降水工程实践,效果显著,可为条件类似地区工程建设提供技术参考。
The application of the deep foundation pit dewatering engineering is an important technique to make sure of the construction safety under complex geologic conditions.Combining with the deep foundation pit dewatering projects in tipper room of Xutang in Jiangsu Province,the authors focused on the foundation pit dewatering project,obtained the dewatering volume and wells.It was concluded that the project in Xutang was accomplished with a good protecting and economical effect,providing a basis and reference for solving the dewatering problems with similar conditions.
引文
陈哲成.2010.高层建筑深基坑降水施工技术的探讨[J].建筑安全,(8):45-48.
    《供水水文地质手册》编写组.1977.供水水文地质手册[M].北京:地质出版社.
    江科.2010.建筑深基坑降水方案研究[J].山西建筑,36(15):100-101.
    任天培.1983.水文地质学[M].武汉:中国地质大学出版社.
    施普德.1977.井水量计算的理论与实践[M].北京:地质出版社.
    速田勇.2009.某电厂基坑降排水工程设计计算[J].采矿技术,9(2):40-41.
    吴林高.2003.工程降水设计施工与基坑渗流理论[M].北京:人民交通出版社.
    姚天强,石振华.2006.基坑降水手册[M].北京:中国建筑工业出版社.
    曾国熙.1988.地基处理手册[M].北京:中国建筑工业出版社.
    张永波,孙新忠.2000.基坑降水工程[M].北京:地震出版社.