组合网架结构预应力施工模拟分析与监测
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
对济南体校2号馆预应力组合网架进行了索张拉过程的施工模拟分析,并计算了张拉阶段的索张力控制值。采用振弦式应变传感器、电阻应变片、全站仪等测量仪器对预应力张拉过程中的索力、杆件应力及挠度进行了实时监测。试验表明施工监测数据和理论计算结果吻合较好。楼板全现浇预应力组合网架施工方法合理,结构具有良好的整体工作性能。
Construction simulation analysis for prestressed composite truss of Ji’nan Sports School No.2 stadium is carried out and the value of cable force is calculated at tension steps.Cable force,truss stress and deflection are monitored by using vibration wire strain sensors,strain gauges and electronic total station.The coincidence of monitoring results and theoretical data is very well.The construction method of prestressed composite truss built with full cast-in-situ floor is reasonable.The structure has a good integral working capacity.
引文
[1]王晓辉.北京师范大学体育馆焊接空心球网架施工技术[J].施工技术,2009,38(S2):310-312.
    [2]李良勇,姚念亮,姜国渔,等.预应力与非预应力螺栓球(环)节点组合网架的设计、研究及应用[C]//第六届空间结构学术会议论文集.北京:地震出版社,1992.
    [3]韩庆华,裴波,杨志,等.预应力组合网架结构的理论分析与应用研究[J].建筑结构学报,2004,25(1):87-92.
    [4]卓新,石川浩一郎.张力补偿计算法在预应力空间网格结构张拉施工中的应用[J].土木工程学报,2004,37(4):38-40,45.
    [5]王骥.预应力组合网架结构的施工模拟分析与监测技术[D].济南:山东建筑大学,2010.
    [6]张纪刚,张同波.青岛体育中心游泳跳水馆网架结构施工监测与模拟分析[J].施工技术,2009,38(10):30-32.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心