苏丹某办公楼屋面高耸钢针安装方法
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
介绍了苏丹首都喀土穆PDOC办公楼屋顶高耸装饰钢针的施工方法,在施工场地狭小和无大型起重设备的情况下采取将钢针分段加工,利用井字支架挂平动葫芦的方法进行分段吊装,步步顶进,使钢针在出井字支架之前完成其上所有的安装工作,避免了施工人员高危作业。该方法解决了多、高层结构屋面上装饰高耸结构的施工难题,并且具有良好的社会、经济效益。
Installation method of towering steel pin on the roof of PDOC office building located in Khartoum,Sudan is introduced at the condition of without sufficient working platform and heavy elevating equipment.Steel pin is manufactured by subsections and derrick hanging manual calabash is adopted for segment lifting.Installation work of steel pin is finished before out of the derrick which avoid aloft work.Through the practice,problem as installation of tall decorative structures on multi-storey and high level buildings is solved,and social and economical benefits are obtained.
引文
[1]中冶集团建筑研究总院.JGJ81—2002钢结构焊接技术规程[S].北京:中国建筑工业出版社,2002.
    [2]冶金工业部建筑研究总院.GB50205—2001钢结构工程施工质量验收规范[S].北京:中国计划出版社,2001.
    [3]建筑施工手册(4版)[M].北京:中国建筑工业出版社,2003.
    [4]杜东升,李爱群,石启印,等.高耸塔台结构地震模拟振动台试验研究及有限元分析[J].工业建筑,2006(3):83-86.
    [5]马人乐,梁峰,黄鑫.高耸钢结构施工方法的特点及发展[J].施工技术,2010,39(10):12-14,39.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心