引文
[1]HUDYMA M,POTVIN.An engineering approach toseismic risk management in hardrock mines[J].RockMechanics and Rock Engineering,2010,43(6):891-906.
[2]HEAL D,POTVIN Y,HUDYMA M.Evaluatingrockburst damage potential in underground mining[C]//Proceedings of 41st U.S.Symposium on RockMechanics(USRMS).USA:Curran Associates,2006:322-329.
[3]HIRATA A,KAMEOKA Y,HIRANO T.Safetymanagement based on detection of possible rock bursts byAE monitoring during tunnel excavation[J].RockMechanics and Rock Engineering,2007,40(6):563-576.
[4]TRIFU CI,SUORINENI FT.Use of microseismicmonitoring for rockburst management at Vale Incomines[C]//Proceedings of 7th International Symposiumon Rockburst and Seismicity in Mines(RASIM7).NewYork:Rinton Press,2009:1105-1114.
[5]REUTER M,KURFURST V,MAYRHOFER K,VEKSLER J.Undulant rock pressure distribution along alongwall face[J].Journal of Mining Science,2009,45(2):130-136.
[6]BUKOWSKA M.The probability of rockburst occurrencein the upper Silesian coal basin area dependent on naturalmining conditions[J].Journal of Mining Science,2006,42(6):570-577.
[7]徐林生,王兰生,李永林.岩爆形成机制与判据研究[J].岩土力学,2002,23(3):300-303.XU Lin-sheng,WANG Lan-sheng,LI Yong-lin.Study onmechanism and judgement of rockbursts[J].Rock andSoil Mechanics,2002,23(3):300-303.
[8]宫凤强,李夕兵,张伟.基于Bayes判别分析方法的地下工程岩爆发生及烈度分级预测[J].岩土力学,2010,31(增刊1):370-377,387.GONG Feng-qiang,LI Xi-bing,ZHANG Wei.Rockburstprediction of underground engineering based on Bayesdiscriminant analysis method[J].Rock and SoilMechanics,2010,31(Supp.1):370-377,387.
[9]王斌,李夕兵,马春德,等.基于三维地应力测量的岩爆预测问题研究[J].岩土力学,2011,32(3):849-854.WANG Bin,LI Xi-bing,MA Chun-de,et al.Study offorecast of rock burst based on three dimensional in-situstress measurement[J].Rock and Soil Mechanics,2011,32(3):849-854.
[10]何满潮,苗金丽,李德建,等.深部花岗岩试样岩爆过程实验研究[J].岩石力学与工程学报,2007,26(5):865-876.HE Man-chao,MIAO Jin-li,LI De-jian,et al.Experimentstudy on rockburst process of granite specimen at greatdepth[J].Chinese Journal of Rock Mechanics andEngineering,2007,26(5):865-876.
[11]严鹏,陈祥荣,单治钢,等.基于超剪应力控制的岩爆防治措施研究[J].岩土力学,2008,29(增刊1):453-458.YAN Peng,CHEN Xiang-rong,SHAN Zhi-gang,et al.study of rock-burst prevention measures based oncontrolling the super shear stress[J].Rock and SoilMechanics,2008,29(Supp.1):453-458.
[12]ZHU Qi-hu,LU Wen-bo,SUN Jin-shan,et al.Preventionof rockburst by guide holes based on numericalsimulations[J].Journal of China University of Mining&Technology,2009,19(3):346-351.
[13]冯夏庭,江权,苏国韶.高应力下硬岩地下工程稳定性智能分析与动态优化[J].岩石力学与工程学报,2008,27(7):1341–1352.FENG Xia-ting,JIANG Quan,SU Guo-shao.Integratedintelligent stability analysis and dynamic optimization ofunderground engineering in hard rock with highgeostress[J].Chinese Journal of Rock Mechanics andEngineering,2008,27(7):1341-1352.
[14]唐春安,王继敏.岩爆及其微震监测预报——可行性与初步实践[J].岩石力学与工程动态,2010,89(1):43-55.TANG Chun-an,WANG Ji-min.Rock and seismicmonitoring and prediction——The feasibility and thepreliminary practice[J].Rock Mechanics andEngineering News,2010,89(1):43-55.
[15]黄运飞.天生桥引水隧洞岩爆防治措施研究[J].地下空间,1989,9(2):31-34.HUANG Yun-fei.Prevention methods study of rockburstin Tianshengqiao diversion tunnel[J].UndergroundSpace,1989,9(2):31-34.
[16]秦跃平,武玉梁,姚有利.巷道壁面切割槽缝法防治岩爆的研究[J].采矿技术,2006,6(3):318-321.QIN Yue-ping,WU Yu-liang,YAO You-li.Rockburstprevention study of slot-cut method on lane wall[J].Mining Technology,2006,6(3):318-321.
[17]李新平,陈俊桦,李友华,等.溪洛渡电站地下洞室群爆破地震效应的研究[J].岩石力学与工程学报,2010,29(3):493-501.LI Xin-ping,CHEN Jun-hua,LI You-hua,et al.Study ofblasting seismic effects of underground chamber group inXiluodu hydropower station[J].Chinese Journal ofRock Mechanics and Engineering,2010,29(3):493-501.
[18]王文龙.钻眼爆破[M].北京:煤炭工业出版社,1984.
[19]张玥.V形刻槽爆破机制动态数值模拟分析[J].爆破器材,2009,38(4):1-5.ZHANG Yue.Dynamic numerical simulation for themechanism of V-shaped notch blasting[J].ExplosiveMaterials,2009,38(4):1-5.
[20]徐颖,沈兆武,孟益平.爆炸载荷作用下刻槽炮孔动态裂纹扩展规律[J].中国科学技术大学学报,2003,33(2):184-189.XU Ying,SHENG Zhao-wu,MENG Yi-ping.Investigation on dynamic expanding rule and applicationin notch blasting[J].Journal of University of Scienceand Technology of China,2003,33(2):184-189.