南市电厂烟囱改建工程加固设计
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
以改建的钢筋混凝土高耸结构——原南市电厂烟囱作为研究对象,以上海2010年世博会观光塔这一典型的钢筋混凝土筒体结构作为工程背景,介绍改建加固的结构方案以及结构改造的内容,详细说明结构改建加固设计的做法,并计算分析加固前、后结构的主要计算指标,验算并对比结构改建前后的承载能力极限状态及正常使用状态下的各个指标,并就指标进行分析,比较结构改造加固的效果。
Based on reconstructing the RC chimney of the former Nanshi Electric Power Plant,which is a typical RC tube structure,into a sightseeing tower for 2010 Shanghai World Expo,it is presented the structural reinforcement scheme and reform contents,and it is described in detail the design of reinforcement and reform of the stucture.It is calculated the main indexes of the structure before and after the reinforcement.It is also checked and compared the indexes of the bearing capacity at ultimate state and normal service state for the structure before and after the reinforcement,through which the reinforcement effect was analyzed.
引文
[1]GB 50068—2001建筑结构可靠度设计统一标准[S].
    [2]GB 50011—2001建筑结构抗震设计规范[S].
    [3]DGJ 08—9—2003建筑抗震设计规程[S].
    [4]GB 50135—2006高耸结构设计规范[S].
    [5]GB 50051—2002烟囱设计规范[S]
    [6]GB 50009—2006建筑结构荷载规范[S].
    [7]GB 50010—2002混凝土结构设计规范[S]
    [8]黄涛,张晓光.改建烟囱的地震响应分析[J].工业建筑,2008,38(增刊):419-421.
    [9]何天森,巢斯.高耸结构静力弹塑性分析研究[J].结构工程师,2011(4):45-50.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心