南水北调西线工程若干工程地质问题研究
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
基于工程实践,探讨西线一期工程区域稳定性评价的原则和基本思路,根据有关资料,给出工程区的稳定性分区,认为西线工程位于基本稳定区,附近断裂大多数不具有活动性,坝址场区内没有发现活动断裂和地震震中分布,没有活动断裂穿越引水隧洞。隧洞围岩主要为II~III类围岩,局部为IV~V类围岩,岩爆强度不高,围岩大变形主要发生在板岩段和构造破碎带处,地质条件适合TBM施工。根据水文地质资料,给出各隧洞段的涌水量。可能引起强透水或涌水的地段主要在浅埋过沟段、向斜褶皱核部破碎岩体形成的富水段、断层破碎带及其影响带。
The assess principle and basic idea of regional tectonic stability are discussed based on engineering practice. The zoning of regional tectonic stability is obtained according to geological data in region of first stage West Route of South-to-North Water Transfer Project. Faults nearby the project are nonactive. There are no active faults and seismic epicenters in dam sites and tunnel areas. The crust of the project site is relative stable. The surrounding rock masses are mainly grades II-III,and rock classifications of grades IV-V are distributed regionally. Density of rockburst is not high. Deformational phenomena of surround rocks exist in slate strata and faulted zones. In case of surrounding rock and deformation feature,the tunnel boring machine(TBM) is applicable to the project. The possible water quantities flowing into tunnel are calculated initially. There are possible zones of groundwater inflowing in the section of shallow tunnel,syncline core and faulted zones.
引文
[1]王学潮,张辉,陈书涛,等.南水北调西线第一期工程地质条件分析[J].人民黄河,2001,23(10):25–26.(WANG Xuechao,ZHANG Hui,CHEN Shutao,et al.Analysis of geological conditions on the first stage project of water diversion form West Route of South-to-North Water Transfer Project[J].Yellow River,2001,23(10):25–26.(in Chinese))
    [2]王学潮,张辉,刘振红,等.南水北调西线工程地质灾害初步研究[J].地球科学,2001,26(3):297–303.(WANG Xuechao,ZHANG Hui,LIU Zhenhong,et al.Geological hazards about West Route of South-to-North Water Transfer Project[J].Earth Science,2001,26(3):297–303.(in Chinese))
    [3]王学潮,高广礼.南水北调西线工程环境地学特征研究[C]//庄逢甘,陈述彭编.2001遥感科技论坛.北京:中国宇航出版社,2001:125–128.(WANG Xuechao,GAO Guangli.Study on geological environment feature of West Route of South-to-North Water Transfer Project[C]//ZHUANG Fenggan,CHEN Shupeng ed.2001Remote Sensing Technical Forum.Beijing:China Astronautics Publishing House,2001:125–128.(in Chinese))
    [4]王学潮,陈书涛,张辉,等.南水北调西线工程地质条件研究[M].郑州:黄河水利出版社,2005.(WANG Xuechao,CHEN Shutao,ZHANG Hui,et al.Study on engineering geological condition of the West Route of South-to-North Water Transfer Project[M].Zhengzhou:Yellow River Conservancy Press,2005.(in Chinese))
    [5]王学潮.南水北调西线一期工程的地质条件和隧洞地质问题[C]//王学潮,伍法权主编.南水北调西线工程岩石力学与工程地质探索.北京:科学出版社,2007:3–9.(WANG Xuechao.Geological problems of tunnel and condition of west line of Water Diversion Project from West Route of South-to-North Water Transfer Project[C]//WANG Xuechao,WU Faquan ed.Exploration of Engineering Geology and Rock Mechanical Problems in the West Route of South-to-North Water Transfer Project.Beijing:Science Press,2007:3–9.(in Chinese))
    [6]王学潮,马国彦.南水北调西线工程及其主要工程地质问题[J].工程地质学报,2002,10(1):38–45.(WANG Xuechao,MA Guoyan.Introduction to engineering project of West Route of South-to-North Water Transfer Project and its main engineering geological problems[J].Journal of Engineering Geology,2002,10(1):38–45.(in Chinese))
    [7]路新景,孙文怀,李金都.南水北调西线工程几个特殊的工程地质和岩石力学问题[J].岩石力学与工程学报,2003,22(5):829–833.(LU Xinjing,SUN Wenhuai,LI Jindu.Special problems of engineering geology and rock mechanics in the West Route of South to-North Water Transfer Project[J].Chinese Journal of Rock Mechanics and Engineering,2003,22(5):829–833.(in Chinese))
    [8]李广诚,严福章.南水北调工程概况及其主要工程地质问题[J].工程地质学报,2004,12(4):354–360.(LI Guangcheng,YAN Fuzhang.An overview of the South-to-North Water Transfer Project and its major engineering geological problems in China[J].Journal of Engineering Geology,2004,12(4):354–360.(in Chinese))
    [9]王学潮,杨维九,刘丰收.南水北调西线一期工程的工程地质和岩石力学问题[J].岩石力学与工程学报,2005,24(20):3603–3613.(WANG Xuechao,YANG Weijiu,LIU Fengshou.Engineering geology and rock mechanical problems in the West Route of South-to-North Water Transfer Project[J].Chinese Journal of Rock Mechanics and Engineering,2005,24(20):3603–3613.(in Chinese))
    [10]黄润秋.西线工程的重大工程地质问题[C]//林凌,刘宝珺编.南水北调西线工程备忘录.北京:经济科学出版社,2006:24–35.(HUANG Runqiu.Important geological problems of West Route of South-to-North Water Transfer Project[C]//LIN Ling,LIU Baojun ed.Memorandum of West Route of South-to-North Water Transfer Project.Beijing:Economic Science Press,2006:24–35.(in Chinese))
    [11]王媛,王学潮,王建平,等.南水北调西线工程区水文地质条件评价[J].岩石力学与工程学报,2005,24(20):3614–3619.(WANG Yuan,WANG Xuechao,WANG Jianping,et al.Evaluations for hydrogeological conditions along West Route of South-to-North Water Transfer Project[J].Chinese Journal of Rock Mechanics and Engineering,2005,24(20):3614–3619.(in Chinese))
    [12]汪小刚,邢义文,赵剑明,等.西部水工程中的岩土工程问题[J].岩土工程学报,2007,29(8):1129–1134.(WANG Xiaogang,XING Yiwen,ZHAO Jianming,et al.Geotechnical engineering problems associated construction of water resources projects in western China[J].Chinese Journal of Geotechnical Engineering,2007,29(8):1129–1134.(in Chinese))
    [13]李起彤.活断层及其工程评价[M].北京:地震出版社,1991:1–158.(LI Qitong.Active fault and engineering evalution[M].Beijing:Earthquake Press,1991:1–158.(in Chinese))
    [14]孙广忠.工程活动与地质环境[J].第四纪研究,1996,(2):97–102.(SUN Guangzhong.Engineering exercise and geological environment[J].Quaternary Research,1996,(2):97–102.(in Chinese))
    [15]汪一鹏.与工程建设有关的活断层性状研究[C]//石宝珩编.中国地质科学新探索.北京:石油工业出版社,1998:184–192.(WANG Yipeng.Study on characteristics of active fault related to engineering construction[C]//SHI Baoheng ed.New Research on Chinese Geological Science.Beijing:Petroleum Industry Press,1998:184–192.(in Chinese))
    [16]闻学泽.四川西部鲜水河—安宁河—则木河断裂带的地震破裂分段特征[J].地震地质,2000,22(3):239–249.(WEN Xueze.Character of rupture segmentation of the Xianshuihe—Anninghe—Zemuhe fault zone,Western Sichuan[J].Seismology and Geology,2000,22(3):239–249.(in Chinese))
    [17]伍法权,王学潮,国连杰,等.南水北调西线一期工程区断层活动性及其对工程的影响分析[J].岩石力学与工程学报,2004,23(8):1370–1374.(WU Faquan,WANG Xuechao,GUO Lianjie,et al.Fault activity and its effect on the West Route of South-to-North Water Transfer Project[J].Chinese Journal of Rock Mechanics and Engineering,2004,23(8):1370–1374.(in Chinese))
    [18]周荣军,黄润秋,雷建成,等.四川汶川8.0级地震地表破裂与震害特点[J].岩石力学与工程学报,2008,27(11):2173–2183.(ZHOU Rongjun,HUNG Runqiu,LEI Jiancheng,et al.Surface rupture and hazard characteristics of Wenchuan earthquake with magnitude of8.0in Sichuan Province[J].Chinese Journal of Rock Mechanics and Engineering,2008,27(11):2173–2183.(in Chinese))
    [19]谢和平,邓建辉,台佳佳,等.汶川大地震灾害与灾区重建的岩土工程问题[J].岩石力学与工程学报,2008,27(9):1781–1791.(XIE Heping,DENG Jianhui,TAI Jiajia,et al.Wenchuan large earthquake and post-earthquake reconstruction-related geotechnical problems[J].Chinese Journal of Rock Mechanics and Engineering,2008,27(9):1781–1791.(in Chinese))
    [20]陈生水,霍家平,章为民.“5.12”汶川地震对紫坪铺混凝土面板坝的影响及原因分析[J].岩土工程学报,2008,30(6):795–801.(CHEN Shengshui,HUO Jiaping,ZHANG Weimin.Analysis of effect of“5.12”Wenchuan earthquake on Zipingpu concrete face rock-fill dam[J].Chinese Journal of Geotechnical Engineering,2008,30(6):795–801.(in Chinese))
    [21]熊堃,何蕴龙,张艳锋,“5.12”汶川地震时冶勒大坝实测动力反应[J].岩土工程学报,2008,30(10):1575–1880.(XIONG Kun,HE Yunlong,ZHANG Yanfeng.Recorded seismic response of Yele dam during“5.12”Wenchuan earthquake[J].Chinese Journal of Geotechnical Engineering,2008,30(10):1575–1880.(in Chinese))
    [22]李兴唐,许兵,黄鼎成,等.区域地壳稳定性研究理论与方法[M].北京:地质出版社,1987:1–231.(LI Xingtang,XU Bing,HUANG Dingcheng,et al.Theory and method of regional crustal stability research[M].Beijing:Geology Press,1987:1–231.(in Chinese))
    [23]李兴唐.活动断裂研究与工程评价[M].北京:地质出版社,1991:1–212.(LI Xingtang.Research and engineering application of active faults[M].Beijing:Geological Publishing House,1991:1–212.(in Chinese))
    [24]殷跃平.汶川八级地震地质灾害研究[J].工程地质学报,2008,16(4):433–444.(YIN Yueping.Researches on the geo-hazards triggered by Wenchuan earthquake,Sichuan[J].Journal of Engineering Geology,2008,16(4):433–444.(in Chinese))
    [25]周江平,宋胜武,曹强.雅砻江锦屏水电工程区域稳定性探讨[J].工程地质学报,2008,16(4):465–469.(ZHOU Jiangping,SONG Shengwu,CAO Qiang.Discussions of earthquake stability of Jinping hydroelectricity on Yalongjiang River[J].Journal of Engineering Geology,2008,16(4):465–469.(in Chinese))
    [26]刘传正.环境工程地质学导论[M].北京:地质出版社,1995.(LIU Chuanzheng.An introduction on environmental engineering geology[M].Beijing:Geological Publishing House,1995.(in Chinese))
    [27]彭建兵.中国活动构造与环境灾害研究中的若干重大问题[J].工程地质学报,2006,14(1):5–12.(PENG Jianbing.Some important problems to be addressed in research of active tectonics and environmental disasters in China[J].Journal of Engineering Geology,2006,14(1):5–12.(in Chinese))
    [28]中华人民共和国行业标准编写组.DL/T5335–2006水电水利工程区域构造稳定性勘察技术规程[S].北京:中国电力出版社,2006.(The Professional Standards Compilation Group of People′s Republic of China.DL/T5335–2006Technical code of regional tectonic stability investigation for hydropower and water resources project[S].Beijing:China Electrical Power Press,2006.(in Chinese))
    [29]中华人民共和国国家标准编写组.GB50287–99水利水电工程地质勘察规范[S].北京:中国计划出版社,1999.(The National Standards Compilation Group of People′s Republic of China.GB50287–99Code for water resources and hydropower engineering geological investigation[S].Beijing:China Planning Press,1999.(in Chinese))
    [30]陈智梁.西线一期工程区地壳的活动性[C]//林凌,刘宝珺主编.南水北调西线工程备忘录.北京:经济科学出版社,2006:8–23.(CHEN Zhiliang.Crust activity of west route of South-to-North Water Transfer Project[C]//LIN Ling,LIU Baojun ed.Memorandum of West Route of South-North Water Transfer Project.Beijing:Economic Science Press,2006:8–23.(in Chinese)
    [31]罗建宁,孙志明.西线工程区及邻近区域地质背景与几点思考[C]//林凌,刘宝珺主编.南水北调西线工程备忘录.北京:经济科学出版社,2006:36–43.(LUO Jianning,SUN Zhiming.Some ideas and geological background of West Route of South-to-North Water Transfer Project and adjacent area[C]//LIN Ling,LIU Baojun ed.Memorandum of West Route of South-North Water Transfer Project.Beijing:Economic Science Press,2006:36–43.(in Chinese))
    [32]倪师军,朱利东,伊海生.南水北调西线工程的几个科学问题[C]//林凌,刘宝珺主编.南水北调西线工程备忘录.北京:经济科学出版社,2006:56–64.(NI Shijun,ZHU Lidong,YIN Haisheng.Several scientific problems of West Route of South-to-North Water Transfer Project[C]//LIN Ling,LIU Baojun ed.Memorandum of West Route of South-North Water Transfer Project.Beijing:Economic Science Press,2006:56–64(in Chinese))
    [33]张辉,王学潮,向宏发.南水北调西线一期工程区构造稳定性分析[J].岩石力学与工程学报,2005,24(20):3657–3663.(ZHANG Hui,WANG Xuechao,XIANG Hongfa.Tectonic stability analysis for West Route of South-to-North Water Transfer Project[J].Chinese Journal of Rock Mechanics and Engineering,2005,24(20):3657–3663.(in Chinese))
    [34]中国地震局地质研究所.南水北调西线一期工程沿线断裂活动性评价与地震区划报告[R].北京:中国地震局地质研究所,2008.(Geology Institute of China Earthquake Administration.Active fault assess and earthquake zoning plan of West Route of South-to-North Water Transfer Project[R].Beijing:Geology Institute of China Earthquake Administration,2008.(in Chinese))
    [35]杨春和,冒海军,王学潮,等.板岩遇水软化后的微观结构特征及力学特性研究[J].岩土力学,2006,27(12):2090–2098.(YANG Chunhe,MAO Haijun,WANG Xuechao,et al.Study on variation of microstructure and mechanical properties of water-weakening slates[J].Rock and Soil Mechanics,2006,27(12):2090–2098.(in Chinese))
    [36]冒海军,杨春和,刘江,等.板岩蠕变特性试验研究与模拟分析[J].岩石力学与工程学报,2006,25(6):1204–1209.(MAO Haijun,YANG Chunhe,LIU Jiang,et al.Testing study and modeling analysis of creep behavior of slates[J].Chinese Journal of Rock Mechanics and Engineering,2006,25(6):1204–1209.(in Chinese))
    [37]郭啟良,伍法权,钱卫平,等.乌鞘岭长大深埋隧道围岩变形与地应力关系的研究[J].岩石力学与工程学报,2006,25(11):2194–2199.(GUO Qiliang,WU Faquan,QIAN Weiping,et al.Study on relationship between deformation of surrounding rock in-situ stress in Wushaoling deep-buried railway tunnel[J].Chinese Journal of Rock Mechanics and Engineering,2006,25(11):2194–2199.(in Chinese))
    [38]张宇,何川,伍晓军.复杂地质条件下隧道三维变形规律分析[J].岩土工程学报,2007,29(10):1465–1471.(ZHANG Yu,HE Chuan,WU Xiaojun.Analysis of3D deformation of tunnels under complex geological conditions[J].Chinese Journal of Geotechnical Engineering,2007,29(10):1465–1471.(in Chinese))
    [39]尚彦军,史永跃,曾庆利,等.昆明上公山隧道复杂地质条件下TBM卡机及护盾变形问题分析和对策[J].岩石力学与工程学报,2005,24(21):3858–3863.(SHANG Yanjun,SHI Yongyue,ZENG Qingli,et al.TBM jamming and deformation in complicated geological conditions and engineering measures[J].Chinese Journal of Rock Mechanics and Engineering,2005,24(21):3858–3863.(in Chinese))
    [40]王广德,石豫川,葛华,等.岩爆与围岩分类[J].工程地质学报,2006,14(1):81–89.(WANG Guangde,SHI Yuchuan,GE Hua,et al.Rockburst and classification of surrounding rock masses[J].Journal of Engineering Geology,2006,14(1):81–89.(in Chinese))
    [41]张镜剑,傅冰骏.岩爆极其判据和防治[J].岩石力学与工程学报,2008,27(10):2034–2042.(ZHANG Jingjian,FU Bingjun.Rockburst and its criteria and control[J].Chinese Journal of Rock Mechanics and Engineering,2008,27(10):2034–2042.(in Chinese))
    [42]王石春.隧道掘进机与地质因素关系综述[J].世界隧道,1998,(2):39–43.(WANG Shichun.Relationship between TBM tunneling and geological conditions[J].World Tunnel,1998,(2):39–43.(in Chinese))
    [43]伊俊涛,尚彦军,傅冰骏,等.TBM掘进技术发展及有关工程地质问题分析和对策[J].工程地质学报,2005,13(3):389–397.(YIN Juntao,SHANG Yanjun,FU Bingjun,et al.Development of TBM excavation technology and analyses and countermeasures of related engineering geological problems[J].Journal of Engineering Geology,2005,13(3):389–397.(in Chinese))
    [44]尚彦军,杨志法,曾庆利,等.TBM施工遇险工程地质问题分析和失误的反思[J].岩石力学与工程学报,2007,26(12):2404–2411.(SHANG Yanjun,YANG Zhifa,ZENG Qingli,et al.Retrospective analysis of TBM accidents from its poor flexibility to complicated geological conditions[J].Chinese Journal of Rock Mechanics and Engineering,2007,26(12):2404–2411.(in Chinese))
    [45]BARTON N.TBM tunneling in jointed and rock[M].Rotterdam:A.A.Balkema,2006.
    [46]杨林德,闫小波,刘成学.软岩渗透性、应变及层理关系的试验研究[J].岩石力学与工程学报,2007,26(3):473–477.(YANG Linde,YAN Xiaobo,LIU Chengxue.Experimental study on relationship among permeability,strain and bedding of soft rock[J].Chinese Journal of Rock Mechanics and Engineering,2007,26(3):473–477.(in Chinese))
    [47]王媛,秦峰,李冬田.南水北调西线工程区地下径流模数、岩体透水性及隧洞涌水量预测[J].岩石力学与工程学报,2005,24(20):3673–3678.(WANG Yuan,QIN Feng,LI Dongtian.Groundwater runoff modulus,rock permeability and prediction of water quantities of tunnel in West Route of South-to-North Water Transfer Project[J].Chinese Journal of Rock Mechanics and Engineering,2005,24(20):3673–3678.(in Chinese))
    [48]殷黎明,杨春和,王贵宾,等.地应力对裂隙岩体渗流特性影响研究[J].岩石力学与工程学报,2005,24(17):3071–3075.(YIN Liming,YANG Chunhe,WANG Guibin,et al.Study on effect of geostress on permeability of fractured rock mass[J].Chinese Journal of Rock Mechanics and Engineering,2005,24(17):3071–3075.(in Chinese))
    [49]王纯祥,蒋宇静,江崎哲郎,等.复杂条件下长大隧道涌水预测及其对环境影响评价[J].岩石力学与工程学报,2008,27(12):2411–2417.(WANG Chunxiang,JIANG Yujing,ESAKI T,et al.Prediction of ground inflow in long tunnel and its influence on environment under complex conditions[J].Chinese Journal of Rock Mechanics and Engineering,2008,27(12):2411–2417.(in Chinese))
    [50]王建秀,朱合华,叶为民.隧道涌水量的预测及其工程应用[J].岩石力学与工程学报,2004,23(7):1150–1153.(WANG Jianxiu,ZHU Hehua,YE Weimin.Forward and inverse analyses of water flow into tunnels[J].Chinese Journal of Rock Mechanics and Engineering,2004,23(7):1150–1153.(in Chinese))

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心