河床式水电站主副厂房不同连接形式抗震分析
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
结合四川省某河床式水电站的工程实例,通过建立包括主厂房和副厂房在内的厂房坝段整体三维有限元模型,研究了在主厂房和副厂房之间不同的连接形式下厂房整体结构的固有振动特性,并进行共振复核。采用反应谱分析方法对模型进行抗震分析,考察了主厂房和副厂房不同连接形式对厂房(尤其是副厂房)主要构件地震反应的影响规律,提出了合理的连接方案,为该河床式厂房的抗震设计提供科学依据。
Based on the practices of a water-retaining power station in Sichuan Province,a three-dimensional finite element model was established for the powerhouse integrity including the main and auxiliary powerhouses.The free vibration characteristics and the possibility of resonance of the powerhouse integrity under various connection patterns between the main and auxiliary powerhouses were studied.The spectral analysis was employed to analyze the seismic characteristics of the model.The influences of various connection patterns between the main and auxiliary powerhouses on the seismic responses of the main components of the powerhouses (especially the auxiliary powerhouse) were investigated.A rational scheme for the connection was proposed,and it would provide scientific basis for the seismic design of the water-retaining power station.
引文
[1]董毓新.中国水利百科全书:水力发电分册[M].北京:中国水利水电出版社,2004.
    [2]练继建,王海军,王日宣.河床式水电站厂房结构动力特性研究[J].水利水电技术,2004,35(8):37-40.
    [3]邹德兵,张建海,刘麟,等.土卡河水电站厂房坝段应力应变研究[J].水利水电科技进展,2005,25(1):28-30.
    [4]党国强,李守义,鞠静春,等.河床式水电站厂房坝段动力分析[J].电网与水力发电进展,2008,24(3):70-73.
    [5]DL5073—2000,水工建筑物抗震设计规范[S].
    [6]陈厚群,侯顺载,杨大伟.地震条件下拱坝库水相互作用试验研究[J].水利学报,1989(7):26-28.
    [7]马震岳,董毓新.水轮发电机组动力学[M].大连:大连理工大学出版社,2003.
    [8]DL50011—2001,建筑抗震设计规范[S].

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心