用综合系数法评价爆破震动作用下巷道稳定性
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
为保障爆破震动作用下巷道的安全与稳定,采用Blastmate III测振仪对铜坑矿生产爆破现场进行了爆破震动监测测试,结合测试结果采用综合系数法对巷道的稳定性进行了评估,得到了不同综合系数K值下满足巷道稳定的最大单段药量计算公式,提出了合适的爆破方式及支护形式。其评价分析方法和结论对相似矿山具有一定的参照意义。
In order to ensure the safety and stability of the underground tunnel under blasting vibration,the blasting vibration was monitored with Blastmate Ⅲ vibration measurer in the production site of Tongkeng mine.Based on the test results,the stability of the underground tunnel was evaluated with comprehensive coefficient method,a calculation formula of Maximum charge in one delay time for ensuring the stability of underground tunnel under different comprehensive coefficient K-value was presented,and appropriate blasting methods and supporting pattern were proposed.The evaluation method and conclusions are of reference value to some similar mines.
引文
[1]孙豁然,肖海军,王运森,等.爆破动荷载下平硐稳定性的研究[J].金属矿山,2001,12(306):15-18.
    [2]吴贤振,冯锐,谢道晖.武山铜矿下向进路充填采矿法采场顶板爆破震动效应研究[J].黄金,2009,1(30):26-28.
    [3]GB6722—2003.爆破安全规程[S].
    [4]刘殿中.工程爆破实用手册[M].北京:冶金工业出版社,1999.
    [5]吴贤振,焦永斌,陆哲祥.某铀矿井下中深孔爆破地表震动效应实测研究[J].黄金,2005,26(10):15-18.
    [6]吴贤振,李印洪,焦永斌.永平铜矿94 m水平中深孔台阶爆破及其地震效应研究[J].有色金属(矿山部分),2005,57(4):29-31.
    [7]张继春.工程控制爆破[M].成都:西南交通大学出版社,2001.
    [8]焦永斌.爆破地震安全标准评定初探[J].爆破,1995,12(3):45-47.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心