广东对口援建汶川灾后重建规划的编制组织和实施成效
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
该文结合汶川灾后恢复重建规划编制中面临的四组主要矛盾,提出重建规划遵循的六项基本原则;总结了重建规划编制中通过提前谋划争取时间、制定规划编制指引"为重建规划做规划"、各层次规划同步编制互为依据等编制组织策略;以及"合纵连横"进行技术协调、通过建立动态调校机制提高重建规划实现度等实施操作措施;最后全景展示出科学的规划编制组织和针对性的规划实施策略所带来的良好实施效果,以期在组织手段和技术方法上为同类规划的编制、实施提供实证案例。
This article combines four main contradiction of reconstruction plan formulation of Wenchuan,points out six basic rules for the reconstruction plan,summarize such organizational strategy as advance planning to earn time during plan formulation,make plan formulation guidance to "plan the plan formulation",use plan formulation in each level for reference mutually,"combining vertically and uniting transversely" coordinate with technique and improve the implementation of reconstruction through building dynamics regulating systems,and at last show the good result brought by the scientific plan formulation organization and the pointed plan and implementation to offer support of case study on the methods of organization and technique.
引文
1国务院.汶川地震灾后恢复重建条例(国务院令第526号).2008.
    2国务院.国务院关于做好汶川地震灾后恢复重建工作的指导意见(国发[2008]22号).2008.
    3国务院抗震救灾总指挥部灾后恢复重建规划组.汶川地震灾后恢复重建总体规划.2008.
    4四川省汶川地震灾后恢复重建规划组.四川省汶川地震灾后恢复重建总体规划纲要.2008.
    5广东省建设厅.广东对口援建汶川镇(乡)地震灾后恢复重建规划指引(GDPG-014).2008.
    6仇保兴.震后重建案例分析.北京:中国建筑工业出版社,2008.
    7曾旭正.灾后重建规划体制问题的分析与建议——以台湾9·21地震为例.城市规划学刊,2008,(4).
    8沈清基,马继武.唐山地震灾后重建规划:回顾、分析及思考.城市规划学刊,2008,(4).

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心