冒裂带高度的确定方法
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
阐述了煤层开采后顶板的分带特征,分析了冒裂带形成的时间规律,探讨冒裂带的确定方法主要是计算模拟法、类比法和现场实际测定法。计算模拟法主要包括经验公式法、物理模拟法、数值模拟法;类比法主要根据煤厚、分层层数、开采深度等建立相关关系进行比拟;实际测定法主要以电阻率、声波、电磁波、地震波等特征值差异以及钻孔电视、水文地质观测等实测数据为依据。文章为冒裂带高度的确定总结了可供选择的各种方法。
The paper stated the zonation features of the roof after the mining of the seam and analyzed the formation time law of the roof falling and fractured zone.The paper discussed the methods to determine the roof falling and fractured zone,mainly including the calculation simulation method,the analogy and the site actual measuring method.The calculation simulation method would mainly be including the experience formula method,the physical simulation method and the numerical simulation method.The analogy would be compared mainly according to the related relationship established with the seam thickness,slice number;mining depth and others.The actual measurement would be based on the difference of the resistivity,sonic wave,electromagnetic wave,seismic wave and other feature value as well as the borehole TV,hydrological observation and site measured data as the basis.The paper summarized the different optional methods to determine the height of the roof falling and fracturing zone.
引文
[1]张杰,侯忠杰.浅埋煤层导水裂隙发展规律物理模拟分析[J].矿山压力与顶板管理,2004,21(4):32~34.
    [2]康永华,孔凡铭,孙凯.覆岩破坏规律的综合研究技术体系[J].煤炭科学技术,1997,25(11):40.
    [3]郑世书,陈江中,刘汉湖.专门水文地质学[M].徐州:中国矿业大学出版,1999.
    [4]涂敏,刘泽功.综放开采顶板离层裂隙变化研究[J].煤炭科学技术,2004,32(4).
    [5]刘盛东,吴荣新,张平松,等.高密度电阻率法观测煤层上覆岩层破坏[J].煤炭科学技术,2001,(4):18~22.
    [6]GB 12719-91,矿区水文地质工程地质勘探规范[S].
    [7]邹海,桂和荣.综放开采导水裂隙带高度预测方法[J].煤田地质与勘探,1998,26(6):43~46.
    [8]汪华军.覆岩导水裂隙带井下微地震监测研究[N].矿业快报,2006,(3).
    [9]王世彬,郭厚亮.在采空积水区下采煤的理论与实践[J].煤炭技术,2005,24(6):47~48.
    [10]于师建,程久龙.覆岩裂隙带电阻率响应特征[J].岩土工程学报,2000,22(3):336~339.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心