基于实钻资料的井壁稳定实时预测理论
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
实际工程要求对井壁稳定问题做到提前预知,因而井壁稳定实时预测研究意义重大。基于实钻录井和测井资料提出了井壁稳定实时预测方法。将发生变形的井眼看作椭圆形,应用弹性理论的复势解法及叠加原理得到井壁应力分布,从而建立井壁围岩的变形程度与岩石物理力学性质、地应力、孔隙压力、泥浆密度及理化性质的关系,在此基础上由泥浆录井和测井资料,反算地应力及孔隙压力,从地震反演得到的岩石力学模型中提取钻头下方一定深度范围内的地层密度和声波时差数据,计算待钻地层的压力曲线,从而实时预测钻头下井段井壁稳定。该方法应用在川东北部地应力复杂地区,取得了较满意的效果。
The borehole instability in practical engineering should be predicted and handled as soon as possible,so a study on the real-time prediction of borehole instability(referring to the prediction of the borehole stability under bit based on the information from drilled sections) is of significance.The present paper introduced a method to predict borehole instability in real time based on actual drilling and well-logging data.The borehole to be deformed was regarded as an ellipse and the stress distribution around borehole derived from the complex potential method and superposition principle was used to correlate the borehole deformation(including collapse,necking,cracking,etc.) with rock mechanical properties,earth stress and pore pressure as well as mud density with physical and chemical properties.Based on these relationships,mud logging and well-logging data were employed to inversely compute earth stress and pore pressure.Subsequently,the density and acoustic travel-time data of strata under the certain depth of bit were deduced from a lithomechanical model established by seismic inversion,and then they were employed to predict the borehole instability under bit in real time.The application of this approach to a northeast Sichuan Basin gained a satisfactory result.
引文
[1]金衍,陈勉,张旭东.钻前井壁稳定预测方法的研究[J].石油学报,2001,22(3):96-99.Jin Yan,Chen Mian,Zhang Xudong.Study on prediction forborehole stability before drilling[J].Acta Petrolei Sinica,2001,22(3):96-99.
    [2]吴超,陈勉,金衍.井壁稳定性实时预测方法[J].石油勘探与开发,2008,35(1):80-84.Wu Chao,Chen Mian,Jin Yan.Real-ti me prediction method ofborehole stability[J].Petroleum Exploration and Development,2008,35(1):80-84.
    [3]吴超,陈勉,金衍.基于地震属性技术的井壁稳定随钻预测新方法[J].中国石油大学学报:自然科学版,2007,31(6):141-146.Wu Chao,Chen Mian,Jin Yan.Anew method of predicting bore-hole stability while drilling based on seismic attribute technology[J].Journal of China University of Petroleum:Natural ScienceEdition,2007,31(6):141-146.
    [4]石林,张旭东,金衍,等.深层地应力测量新方法[J].岩石力学与工程学报,2004,23(14):2355-2358.Shi Lin,Zhang Xudong,Jin Yan,et al.New method for measure-ment of in-situ stress at great depth[J].Chinese Journal of RockMechanics and Engineering,2004,23(14):2355-2358.
    [5]Lavrov A.The Kaiser effect in rocks:Principles and stress esti-mation techniques[J].International Journal of Rock Mechanicsand Mining Sciences,2003,40(2):151-171.
    [6]季宗镇,戴俊生,汪必峰.地应力与构造裂缝参数间的定量关系[J].石油学报,2010,31(1):68-72.Ji Zongzhen,Dai Junsheng,Wang Bifeng.Quantitative relation-ship between crustal stress and parameters of tectonic fracture[J].Acta Petrolei Sinica,2010,31(1):68-72.
    [7]张广清,陈勉,赵艳波.新井定向射孔转向压裂裂缝起裂与延伸机理研究[J].石油学报,2008,29(1):116-119.Zhang Guangqing,Chen Mian,Zhao Yanbo.Study on initiationand propagation mechanismof fracturesin oriented perforation ofnew wells[J].Acta Petrolei Sinica,2008,29(1):116-119.
    [8]赵海峰,陈勉,金衍.水力裂缝在地层界面的扩展行为[J].石油学报,2009,30(3):450-454.Zhao Haifeng,Chen Mian,Jin Yan.Extending behavior of hy-draulic fracture on formation interface[J].Acta Petrolei Sinica,2009,30(3):450-454.
    [9]陈勉,金衍,张广清.石油工程岩石力学[M].北京:科学出版社,2008:56-58.Chen Mian,Jin Yan,Zhang Guangqing.Petroleum related rockmechanics[M].Beijing:Science Press,2008:56-58.
    [10]金衍,陈勉,郭凯俊,等.复杂泥页岩地层地应力的确定方法研究[J].岩石力学与工程学报,2006,25(11):2287-2291.Jin Yan,Chen Mian,Guo Kaijun,et al.Study on determination meth-od of in-situ stress for complex silt formations[J].Chinese Journal ofRock Mechanics and Engineering,2006,25(11):2287-2291.
    [11]Fjaer E,Holt R M,Horsrud P.Petroleumrelated rock mechanics[M].Amsterdam:Elsevier Press,1992.
    [12]黄继新,彭仕宓,王小军,等.成像测井资料在裂缝和地应力研究中的应用[J].石油学报,2006,27(6):65-69.Huang Jixin,Peng Shi mi,Wang Xiaojun,et al.Applications ofi maginglogging datainthe research of fracture and ground stress[J].Acta Petrolei Sinica,2006,27(6):65-69.
    [13]Hudson J A,Cornet F H,Chistiansson R.ISRMsuggested meth-ods for rock stress esti mation-Part1:Strategy for rock stress es-ti mation[J].International Journal of Rock Mechanics and MiningSciences,2003,40(7/8):991-998.
    [14]Ito T,Evans K,Kawai K,et al.Hydraulic fracture reopening pres-sure and the esti mation of maxi mumhorizontal stress[J].Interna-tional Journal of Rock Mechanics and Mining Sciences,1999,36(6):811-826.
    [15]Rutqvist J,Tsang C F,Stephansson O.Uncertainty in the maxi-mumprincipal stress esti mated from hydraulic fracturing meas-urements due to the presence of the induced fracture[J].Inter-national Journal of Rock Mechanics and Mining Sciences,2000,37(1/2):107-120.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心