引文
[1]李瓒,陈飞,郑建波,等.特高拱坝枢纽分析与重点问题研究[M].北京:中国电力出版社,2004:1-10.(LI Zan,CHEN Fei,ZHENG Jianbo,et al.Study on key problems of super high archdam[M].Beijing:China Electric Power Press,2004:1-10.(inChinese))
[2]林鹏,王仁坤,康绳祖,等.特高拱坝基础破坏、加固与稳定关键问题研究[J].岩石力学与工程学报,2011,30(10):1945-1958.(LIN Peng,WANG Renkun,KANG Shengzu,et al.Study on keyproblems of foundation failure,reinforcement and stability for superhigh arch dams[J].Chinese Journal of Rock Mechanics and Engineering,2011,30(10),1 945-1 958.(in Chinese))
[3]American Society of Civil Engineers.Foundations for dams[C]//Asilomar Conference Grounds Pacific Grove.[S.l.]:[s.n.],1974:17-21.
[4]周维垣,林鹏,周雅能,等.高拱坝基础大垫座及周边缝设置研究[J].岩石力学与工程学报,2008,27(10):1959-1967.(ZHOUWeiyuan,LIN Peng,ZHOU Yaneng,et al.Research on concrete socketand peripheral joint for high arch dam foundation[J].Chinese Journalof Rock Mechanics and Engineering,2008,27(10):1 959-1 967.(in Chinese))
[5]汝乃华,姜忠胜.大坝事故与安全:拱坝[M].北京:中国水利水电出版社,1995:314-327.(RU Naihua,JIANG Zhongsheng.Damfailure and safety:arch dam[M].Beijing:China Water Power Press,1995:314-327.(in Chinese))
[6]周维垣,林鹏,王仁坤,等.坝工岩石力学关键问题——非线性设计研究[C]//第九届全国岩石力学与工程学术大会论文集.北京:科学出版社,2006:70-75.(ZHOU Weiyuan,LIN Peng,WANGRenkun,et al.Key problems of dam rock mechanics—study on nonlineardesign[C]//The 9th National Conference of Rock Mechanics andEngineering.Beijing:Science Press,2006:70-75.(in Chinese))
[7]李同春,王仁坤,游启升,等.高拱坝安全度评价方法研究[J].水利学报,2007,(增):78-83,105.(LI Tongchun,WANG Renkun,YOU Qisheng,et al.Study on safety evaluation methods for higharch dams[J].Journal of Hydraulic Engineering,2007,(Supp.):78-83,105.(in Chinese))
[8]林鹏,王仁坤,李庆斌,等.汶川8.0级地震对典型高坝结构安全的影响分析[J].岩石力学与工程学报,2009,28(6):1261-1269.(LIN Peng,WANG Renkun,LI Qingbin,et al.Effect analysis ofstructural safety of typical large dams from Wenchuan 8.0 earthquake[J].Chinese Journal of Rock Mechanics and Engineering,2009,28(6):1 261-1 269.(in Chinese))
[9]王仁坤,林鹏,周维垣.复杂地基上高拱坝开裂与稳定研究[J].岩石力学与工程学报,2007,26(10):1951-1958.(WANGRenkun,LIN Peng,ZHOU Weiyuan.Cracking and stability problems of high archdams on complicated rock foundations[J].Chinese Journal of RockMechanics and Engineering,2007,26(10):1 951-1 958.(in Chinese))
[10]LIN P,ZHOU W Y,YANG Q,et al.A new three-dimensional FEMmodel on arch dam cracking analysis[J].Key Engineering Materials,2004,261-263:1 569-1 574
[11]周维垣,林鹏,杨若琼,等.高拱坝地质力学模型试验方法与应用[M].北京:中国水利水电出版社,2008:189-204.(ZHOUWeiyuan,LIN Peng,YANG Ruoqiong,et al.Method and applicationof geomechanics model test on high arch dam[M].Beijing:ChinaWater Power Press,2008:189-204.(in Chinese))
[12]陈磊,戴前伟,曾凡卿.大坝建基岩体物理探测方法应用[J].工程地球物理学报,2006,3(3):221-224.(CHEN Lei,DAI Qianwei,ZENG Fanqing.Apply physical testing method on rock mass of damfoundation[J].Chinese Journal of Engineering Geophysics,2006,3(3):221-224.(in Chinese))
[13]董泽荣,赵华,姜云辉,等.拱坝坝基岩体全过程变形监测成果分析[C]//第十届全国岩石力学与工程学术大会论文集.北京:科学出版社,2008:90-96.(DONG Zerong,ZHAO Hua,JIANGYunhui,et al.Analysis of result on deformation monitoring of archdam foundation rock mass[C]//The 10th National Conference ofRock Mechanics and Engineering.Beijing:Science Press,2008:90-96.(in Chinese))
[14]王仁坤,林鹏.溪洛渡拱坝建基面嵌深优化的分析与评价[J].岩石力学与工程学报,2008,27(10):2010-2018.(WANGRenkun,LIN Peng.Analysis and evaluation of optimizing design forfoundation excavation of Xiluodu super-high arch dam[J].ChineseJournal of Rock Mechanics and Engineering,2008,27(10):2 010-2 018.(in Chinese))
[15]周喜德.岩体中弹性波速度及其应用研究[J].贵州水力发电,1999,13(2):10-13.(ZHOU Xide.Study on velocity of elastic wavein rock and its application[J].Guizhou Water Power,1999,13(2):10-13.(in Chinese))
[16]中国水电工程顾问集团成都勘测设计研究院.金沙江溪洛渡水电站拱坝建基面工程地质条件[R].成都:中国水电工程顾问集团成都勘测设计研究院,2009.(HydroChina Chengdu EngineeringCorporation.Engineering geo-condition of foundation interface ofXiluodu arch dam[R].Chengdu:HydroChina Chengdu EngineeringCorporation,2009.(in Chinese))
[17]中华人民共和国行业标准编写组.SL326—2005水利水电工程物探规程[S].北京:中国水利水电出版社,2005.(The ProfessionalStandards Compilation Group of People S Republic of China.SL326—2005 Code for engineering geophysical exploration of waterresources and hydropower[S].Beijing:China Water Power Press,2005.(in Chinese))
[18]李庆斌,林鹏,胡昱,等.金沙江溪洛渡水电站大坝基础整体工作状态分析[R].北京:清华大学,2011.(LI Qingbin,LINPeng,HU Yu,et al.Study on integral stability of dam and foundationof Xiluodu arch dam[R].Beijing:Tsinghua University,2011.(in Chinese))
[19]林鹏,王仁坤,周雅能,等.特高拱坝建基面浅层卸荷机制与稳定分析[J].岩土力学,2008,29(增):8-14.(LIN Peng,WANGRenkun,ZHOU Yaneng,et al.Study on shallow unloading mechanismand stability of foundation interface of super high arch dam[J].Rockand Soil Mechanics,2008,29(Supp.):8-14.(in Chinese))
[20]DEER D V,MILLER R P.Engineering classifications and indexproperties of intact rock[R].[S.l.]:[s.n.],1966.
[21]BIENIAWSKI Z T.Engineering rock mass classification:a completemanual for engineers and geologists in mining,civil,and petroleumengineers[M].New York:Wiley,1989:25-58.
[22]中华人民共和国国家标准编写组.GB50287—99水利水电工程地质勘察规范[S].北京:中国计划出版社出,1999.(The NationalStandards Compilation Group of People S Republic of China.GB50287—99 Code for water resources and hydropower engineeringgeological investigation[S].Beijing:China Planning Press,1999.(inChinese))