堰塞坝漫顶溃决过程及其受组成结构的影响
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
以四川茂县宗渠堰塞坝为原型,以几何相似比1∶100进行堰塞坝漫顶溃决模型试验。通过模型试验揭示了堰塞坝漫顶溃决的动力学过程,即下游坡面侵蚀、冲沟侵蚀、陡坎稳定侵蚀、陡坎加速侵蚀、陡坎减速侵蚀和常态化过程6个阶段。通过对比试验,揭示了坝体密度和级配特征对溃决速率以及溃口形式的影响机制,即坝体密度通过颗粒间剪切作用于溃决过程,密度更大的坝体溃决更慢,形成中轴线处窄浅的"矩形"溃口;坝体级配通过孤粒起动作用于溃决过程,级配更粗的坝体溃决更慢,形成中轴线处宽浅的"倒梯形"溃口。
We took the Zongqu Barrier dam as a prototype to conduct the overtopping outburst model texts with a geometry similar ratio of 1:100 and revealed dynamic processes of the overtopping outburst,namely surface erosion of downstream slope,gully erosion,constant headcut erosion,accelerated headcut erosion,decelerated headcut erosion and normal state erosion.Dam density and particle size distribution have significant influences on outburst rate and patterns through inter-particle shear and sole particle transportation respectively.Barrier dam with greater density will have a slower erosion rate,and a shallower and narrower rectangle breach at the axis;and barrier dam with coarser particle will also have a slower erosion rate,but a shallower and wider trapezia breach at the axis.
引文
[1]汪明元,徐晗.唐家山堰塞坝泄流对坝坡稳定的效果分析[J].人民长江,2008,39(22):19-20.
    [2]崔鹏,韩用顺,陈晓清.汶川地震堰塞湖分布规律与风险评估[J].四川大学学报:工程科学版,2009,41(3):35-42.
    [3]Bovis M J,Jakob M.The July 29,1998,Debris flow and landslide damat Capricorn Creek,Mount Meager Volcanic Complex,southern CoastMountains,British Columbia[J].Canadian Journal of Earth Science,2000,37:1321-1334.
    [4]Shang Y J,Yang Z F,Li L H,et al.A super-large landslide in Tibetin 2000:Background,occurrence,disaster,and origin[J].Geomor-phology,2003,54:225-243.
    [5]Chen C Y,Chen T C,Yu F C,et al.A landslide dam breach induceddebris flow-a case study on downstream hazard areas delineation[J].Environmental Geology,2004,47(1):91-101.
    [6]Robin J M,John J C.Statistical,remote sensing-based approach forestimating the probability of catastrophic drainage from moraine-dammed lakes in southwestern British Columbia[J].Global and Plan-etary Change,2007,(56):153-171.
    [7]Costa J E,Schuster R L.The formation and failure of natural dams[J].Geological Society of America Bulletin,1988,(100):1054-1068.
    [8]Wan C F,Fell R.Investigation of rate of erosion of soils in embank-ment dams[J].Journal of Geotechnical and Geoenvironmental Engi-neering,2004,130(4):73-380.
    [9]Briaud J L,Chen H C.Govindassamy A V,Storesund R.Levee ero-sion by overtopping in New Orleans during the Katrina Hurricane[J].Journal of Geotechnical and Geoenvironmental Engineering,2008,134(5):618-632.
    [10]柴贺军,陈谦应.滑坡坝坝顶溢流冲刷的基本理论[J].地质灾害与环境保护.2002,13(2):10-12.
    [11]吴持恭.水力学[M].北京:高等教育出版社,1983.
    [12]Hanson G J,Robinson K M,Cook K R.Headcut migration analy-sis of a compacted soil[J].Transaction of ASAE,1997,40(2):355-361.
    [13]Hanson G J,Robinson K M,Cook K R.Prediction of headcut mi-gration using a deterministic approach[J].Transaction of ASAE,2001,44(3):525-531.
    [14]邓明枫,陈宁生,邓虎,等.堰塞坝漫顶溃决过程与机理试验研究[J],成都理工大学学报:自然科学版,2011,38(3):359-365.