液化场地处循环水系统埋地管道的地基处理
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
大型火力发电厂循环水取水管道及供排水管道的内直径(或边长)可达3~4m;在地震作用下,当这些管道位于液化场地内时,可能会出现"管道震陷"、"管道上浮"等震害.相关规范中,针对液化场地给出了消除"液化沉陷"的具体要求和相应措施,但未涉及场地液化后"管道上浮"问题.为了保证这些大直径管道的抗震安全性,相应的地基处理方案应能消除"管道震陷"和"管道上浮"等震害,同时还应符合"经济、可行"的原则.
The conduit of circulating water system for large power plant can reach 3-4 m in inner diameter(or side length).For the buried conduit in liquefied soil,the seismic subsidence or floating response under earthquake action may appear.The control measures for eliminating the liquefaction settlement is proposed in the codes;but the calculation method of "floating response" for conduit in liquefied soil has not given.The foundation treatment scheme is applied to liquefied soil to ensure conduit security.The selected schemes should be able to eliminate earthquake damage of conduit seismic subsidence and conduit float upward;also they are economically feasible.
引文
[1]GB50011-2010建筑抗震设计规范[S].北京:中国建筑工业出版社,2010.
    [2]GB50032-2003室外给水排水和燃气热力工程抗震设计规范[S].北京:中国建筑工业出版社,2003.
    [3]侯忠良.输油管线地震液化反应计算[J].工程抗震,1991,2:35-39.
    [4]邹德高.地震时饱和砂土地基中管线上浮机理及抗震措施试验研究[J].岩土工程学报,2002,24(3):323-326.
    [5]景悦.地震作用下穿越管道砂土液化实验研究[J].地震工程与工程振动,2003,23(3):138-144.
    [6]林均岐.场地土液化引起的地下管道上浮反应研究[J].地震工程与工程振动,2004,24(3):120-123.
    [7]GB50470-2008油气输送管道线路工程抗震技术规范[S].北京:中国计划出版社,2009.
    [8]GB50223-2008建筑工程抗震设防分类标准[S].北京:中国建筑工业出版社,2008.
    [9]GB50332-2002给水排水工程管道结构设计规范[S].北京:中国建筑工业出版社,2002.
    [10]DL/T5339-2006火力发电厂水工设计规范[S].北京:中国电力出版社,2006.
    [11]武汉水利电力学院水力学教研室编,徐正凡主编.水力学[M].北京:高等教育出版社,1986.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心