引文
[1]Rico M,Benito G,Salgueiro A R,et al.Reportedtailings dam failures:a review of the European inci-dents in the worldwide context[J].J Journal of Haz-ardous Materials,2008,152(2):846-852.
[2]李全明,王云海,张兴凯,等.尾矿库溃坝灾害因素分析及风险指标体系研究[J].中国安全生产科学技术,2008,4(3):50-54.(Li Quanming,Wang Yunhai,Zhang Xingkai,et al.Analysis of disastrous factors concerning tailing damfailing and research on risk index system[J].Journalof Safety Science and Technology,2008,4(3):50-54.)
[3]田文旗,谢旭阳.我国尾矿库现状及安全对策的建议[J].中国安全科学学报,2009,38(6):42-44.(Tian Wenqi.Tailings pond situation in China andsafety countermeasures suggestion[J].China SafetyScience Journal,2009,38(6):42-44.)
[4]Anon A.Review of tailings dam failures[J].Interna-tional Water Power and Dam Construction,2001,53(5):40-42.
[5]李鸿儒,胡再强,陈存礼,等.金堆城尾矿坝加高方案数值模拟及稳定性分析[J].岩土力学,2008,29(4):1138-1142.(Li Hongru,Hu Zaiqiang,Chen Cunli,et al.Numeri-cal simulation and slope stability analysis in Jing-duicheng tailings dam to be designed to increase thedam height[J].Rock and Soil Mechanics,2008,29(4):1138-1142.)
[6]赵坚,纪伟,刘志敏.尾矿坝地质剖面概化及其对渗流场计算的影响[J].金属矿山,2003(12):24-27.(Zhao Jian,Ji Wei,Liu Zhimin.Surveying of geo-logical sections of tailings dams and its effect onseepage field calculation[J].Metal Mine,2003(12):24-27.)
[7]陈殿强,王来贵,李根,等.尾矿坝稳定性分析[J].辽宁工程技术大学学报,2008,27(3):359-361.(Chen Dianqiang,Wang Laigui,Li Gen,et al.Tail-ing-dam stability analysis[J].Journal of LiaoningTechnical University,2008,27(3):359-361.)
[8]张鲁渝,郑颖人,赵尚毅,等.有限元强度折减系数法计算土坡稳定安全系数的精度研究[J].水利学报,2003,22(1):21-27.(Zhang Luyu,Zhang Yingren,Zhao Shangyi,et al.The feasibility study of strength-reduction methodwith FEM for calculating safety factors of soil slopestability[J].Journal of Hydraulic Engineering,2003,22(1):21-27.)
[9]张超,杨春和.尾矿坝液化判别简化方法研究[J].岩石力学与工程学报,2006,S(2):3730-3735.(Zhang Chao,Yang Chunhe.Study on a simplifiedprocedure for evaluating liquefaction potential oftailings dam[J].Chinese Journal of Rock Mechanicsand Engineering,2006,S(2):3730-3735.)
[10]李再光,罗晓辉.尾矿坝地震反应的拟静力稳定分析[J].岩土力学学报,2006,27(7):1138-1142.(Li Zaiguang,Luo Xiaohui.Equivalent static stabili-ty analysis of earthquake response of tailings dam[J].Rock and Soil Mechanics,2006,27(7):1138-1142.)
[11]潘建平,孔宪京,邹德高.尾矿坝地震液化稳定的简化分析[J].水利学报,2006,37(10):1224-1229.(Pan Jianping,Kong Xianjing,Zou Degao.Simpli-fied analysis of liquefaction and stability of tailingdam during earthquake[J].Journal of Hydraulic En-gineering,2006,37(10):1224-1229.)
[12]Vick S G.Tailings dam failure at Omai in Guyana[J].Mining Engineering,1996,48(11):34-37.
[13]刘波,韩彦辉.FLAC原理、实例与应用指南[M].北京:人民交通出版社,2005.(LiuBo,HanYanHui.FLAC principle,examples andapplication guide[M].Beijing:China Communica-tions Press,2005.)
[14]吴邦强,吴仲雄.尾矿库安全运行及其评价[J].矿业工程,2010,8(2):44-47.(Wu Bangqiang,Wu Zhongxiong.Safe operation oftailings reservoir and assessment of its safety[J].Mining Engineering,2010,8(2):44-47.)
[15]楼建东,李庆耀,陈宝.某尾矿坝数值模拟与稳定性分析[J].湖南科技大学学报:自然科学版,2005,20(2):58-61.(Lou Jiandong,Li Qingyao,Chen Bao.Tailing-dam math simulation and stability analysis[J].Jour-nal of Hunan University of Science&Technology:Natural Science Edition,2005,20(2):58-61.)
[16]Das B M.Adcanced soil mechanics[M].New York:Taylor﹠Francis Publishing Company,2008.