综合防御高风险的小概率事件:对日本相继天灾引发大停电及核泄漏事件的思考
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
针对2011年东日本地震、海啸相继天灾引发大停电,进而核泄漏的严重事件,从风险观点反思了对高风险小概率事件认知的不足,并提出应对这类事件的原则。探讨综合防御系统的建设、运行与管理,剖析当前灾害防御体系亟需提升之处,指出坚强智能电网在能源安全与生态安全中的作用。
Cascading disasters of earthquake and tsunami gave rise to blackout and further nuclear leakage in East Japan in 2011.Cognitive deficiencies on small probability events with very high risk are introspected from a viewpoint on risk.Principles coping with such incidents are also proposed.The construction,operation and management of integrated defense systems are discussed,as well as the improvements urgently needed.Finally,the important roles played by strong smart grid in energy security and ecological security are well indicated.
引文
[1]日本核安全神话破灭,应对危机仅仅建设社会不够[EB/OL].[2011-03-24].http://www.boraid.com/darticle3/list.asp?id=163792#.
    [2]日本最大的灾难是灾难常态化[EB/OL].[2011-04-11].http://opinion.huanqiu.com/roll/2011-04/1620000.html.
    [3]众专家学者探究日本大地震的影响与警示[EB/OL].[2011-04-11].http://www.ce.cn/cysc/ny/heneng/201104/15/t20110415_20964188.shtml.
    [4]NODA M.Disaster and restoration of electricity supply systemby Hanshin-Awaji earthquake[C]//Proceedings of APECSeminar on Earthquake Disaster Management of Energy SupplySystems,September 5-6,2001,Taipei,China.
    [5]宋冰,徐倩,曲飞帆.日本核电危机背后[EB/OL].[2011-03-14].http://www.yicai.com/news/2011/03/706831.html.
    [6]日本核电事故及大面积停电启示[EB/OL].[2011-04-07].http://epaper.indaa.com.cn/html/201-04/07/content_264592.htm.
    [7]日本9.0级地震引发系列灾害[EB/OL].[2011-04-11].http://news.sohu.com/s2011/ribendizhen11/.
    [8]福岛事故提醒世界安全利用核能[EB/OL].[2011-03-24].http://www.chinanews.com/ny/2011/03-24/2929343.shtml.
    [9]日本电力遭地震重创电荒已经形成[EB/OL].[2011-03-16].http://www.qianhuaweb.com/content/2011-03/16/content_1403729.htm.
    [10]薛禹胜,刘强,DONG Zhaoyang,等.关于暂态稳定不确定性分析的评述[J].电力系统自动化,2007,31(14):1-7.XUE Yusheng,LIU Qiang,DONG Zhaoyang,et al.A reviewof non-deterministic analysis for power system transientstability[J].Automation of Electric Power Systems,2007,31(14):1-7.
    [11]Japan and future of U.S.nuclear power[EB/OL].[2011-04-11].http://www.cnn.com/2011/OPINION/03/14/romm.japan.nuclear.us/index.html.
    [12]王昊昊,罗建裕,徐泰山,等.中国电网自然灾害防御技术现状调查与分析[J].电力系统自动化,2010,34(23):5-10.WANG Haohao,LUO Jianyu,XU Taishan,et al.Questionnaire survey and analysis of natural disaster techniquesof power grids in China[J].Automation of Electric PowerSystems,2010,34(23):5-10.
    [13]侯慧,尹项根,游大海,等.国外经验对中国电力系统应急减灾机制的启示[J].电力系统自动化,2008,32(12):89-93.HOU Hui,YIN Xianggen,YOU Dahai,et al.Apocalypse ofoverseas experiences on emergency anti-disaster mechanism forChina power system[J].Automation of Electric PowerSystems,2008,32(12):89-93.
    [14]张建华,尚敬福,赵炜炜,等.中国区域电网应急管理机制建设的建议[J].电力系统自动化,2009,33(4):40-44.ZHANG Jianhua,SHANG Jingfu,ZHAO Weiwei,et al.Suggestions on construction of emergency managementmechanism for Chinese regional power system[J].Automationof Electric Power Systems,2009,33(4):40-44.
    [15]WG C2.02.04 Technical Brochure:Defense plan againstextreme contingencies[J].Electra,2007(231):47-61.
    [16]张伯明,吴素农,蔡斌,等.电网控制中心安全预警和决策支持系统设计[J].电力系统自动化,2006,30(6):1-5.ZHANG Boming,WU Sunong,CAI Bin,et al.Design ofearly warning and security countermeasure system for electricpower control centers[J].Automation of Electric PowerSystems,2006,30(6):1-5.
    [17]薛禹胜.综合防御由偶然故障演化为电力灾难——北美“8.14”大停电的警示[J].电力系统自动化,2003,27(18):1-5.XUE Yusheng.The way from a simple contingency to system-wide disaster—lessons from the eastern interconnectionblackout in 2003[J].Automation of Electric Power Systems,2003,27(18):1-5.
    [18]薛禹胜.时空协调的大停电防御框架:(一)从孤立防御到综合防御[J].电力系统自动化,2006,30(1):8-16.XUE Yusheng.Space-time cooperative framework fordefending blackouts:PartⅠfrom isolated defense lines tocoordinated defending[J].Automation of Electric PowerSystems,2006,30(1):8-16.
    [19]薛禹胜.时空协调的大停电防御框架:(二)广域信息、在线量化分析和自适应优化控制[J].电力系统自动化,2006,30(2):1-10.XUE Yusheng.Space-time cooperative framework fordefending blackouts:PartⅡreliable information,quantitative analyses and adaptive controls[J].Automation ofElectric Power Systems,2006,30(2):1-10.
    [20]薛禹胜.时空协调的大停电防御框架:(三)各道防线内部的优化和不同防线之间的协调[J].电力系统自动化,2006,30(3):1-11.XUE Yusheng.Space-time cooperative framework fordefending blackouts:PartⅢoptimization and coordination ofdefense-lines[J].Automation of Electric Power Systems,2006,30(3):1-11.
    [21]薛禹胜,李天然,尹霞,等.广义阻塞及市场力的研究框架[J].电力系统自动化,2010,34(21):1-10.XUE Yusheng,LI Tianran,YIN Xia,et al.A researchframework for generalized congestions and market power[J].Automation of Electric Power Systems,2010,34(21):1-10.
    [22]XUE Yusheng.Defense schemes against power systemblackouts in China with high load growth[C]//Proceedings ofthe 15th Power System Computation Conference,August 22-26,2005,Liege,Belgium.
    [23]XUE Yusheng.Progresses of blackout defense systems inChina[C]//Proceedings of 2008IEEE/PES General Meeting,July 20-24,2008,Pittsburgh,PA,USA.
    [24]李碧君,许剑冰,徐泰山,等.大电网安全稳定综合协调防御的工程应用[J].电力系统自动化,2008,32(6):25-30.LI Bijun,XU Jianbing,XU Taishan,et al.Engineeringapplication of integrated and coordinated defense technology oflarge power system security and stability[J].Automation ofElectric Power Systems,2008,32(6):25-30.
    [25]薛禹胜,费圣英,卜凡强.极端外部灾害中的停电防御系统构思:(一)挑战与反思[J].电力系统自动化,2008,32(9):1-6.XUE Yusheng,FEI Shengying,BU Fanqiang.Upgrading theblackout defense scheme against extreme disasters:PartⅠnew challenges and reflection[J].Automation of ElectricPower Systems,2008,32(9):1-6.
    [26]薛禹胜,费圣英,卜凡强.极端外部灾害中的停电防御系统构思:(二)任务与展望[J].电力系统自动化,2008,32(10):1-5.XUE Yusheng,FEI Shengying,BU Fanqiang.Upgrading theblackout defense scheme against extreme disasters:PartⅡtasks and prospects[J].Automation of Electric PowerSystems,2008,32(10):1-5.
    [27]Is nuclear energy worth the risk?[EB/OL].[2011-04-04].http://www.cnn.com/2011/OPINION/04/04/nuclear.debate/index.html.
    [28]杨传敏.福岛核危机启示录[EB/OL].[2011-03-23].http://gcontent.oeeee.com/4/65/465636eb4a7ff4b2/Blog/13b/9e473a.html.
    [29]法国核电启示录[EB/OL].[2011-03-24].http://finance.ifeng.com/news/hqcj/20110325/3756601.shtml.
    [30]李锐,陈颖,梅生伟,等.基于停电风险评估的城市配电网应急预警方法[J].电力系统自动化,2010,34(16):19-23.LI Rui,CHEN Ying,MEI Shengwei,et al.An early warningmethod for emergency response baed on power failure riskanalysis of distribution systems[J].Automation of ElectricPower Systems,2010,34(16):19-23.
    [31]AMIN M.Toward self-healing energy infrastructure systems[J].IEEE Computer Applications in Power,2001,14(1):20-29.
    [32]肖世杰.构建中国智能电网技术思考[J].电力系统自动化,2009,33(9):1-4.XIAO Shijie.Consideration of technology for constructingChinese smart grid[J].Automation of Electric Power Systems,2009,33(9):1-4.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心