厚板柱钢框架梁柱节点对断裂韧性的要求
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
为了研究厚板柱钢框架梁柱节点对材料断裂韧性的要求,进行了三维弹性和弹塑性断裂力学有限元计算.以裂纹尖端的应力强度因子KI和JI为评价指标,分析了焊接工艺孔形式、梁翼缘削弱或加强和初始裂纹位置等因素对梁柱节点断裂韧性的不同要求.结果表明:美国北岭地震后改进的焊接孔B对断裂韧性的要求最低,而我国《建筑抗震设计规范》规定的焊接孔D对断裂韧性的要求相对较高;与标准型节点相比,梁翼缘削弱或加强型节点能显著降低对断裂韧性的要求;当焊接高匹配时,热影响区裂纹比焊根裂纹更易于扩展,并导致节点的断裂破坏.钢框架梁柱节点断裂评估定量方法为节点防断设计中钢材与焊材的选材、焊接孔与节点形式的选用提供了参考.
In order to investigate the demand of beam-column connections in steel frame with thick plate column on the fracture toughness of materials,the finite element calculation of three dimensional(3D) elastic and elastoplastic fracture mechanics was carried out.The stress intensity factor(KI) and J-integral(JI) around crack tip were used as the evaluation indexes,and the different requirements of such factors as the weld access hole form,either weakening or strengthening with beam flange and initial crack location on the fracture toughness of beam-column connections were analyzed.The results show that the weld access hole B improved after Northridge earthquake in USA exhibits the lowest demand on the fracture toughness,while the weld access hole D given by "Code for anti seismic design of buildings" in China shows relatively higher demand on the fracture toughness.Compared with the standard connections,the beam flange weakened or strengthened connection can reduce the demand on the fracture toughness remarkably.With the high weld match,the crack in heat-affected zone is easier to propagate than that in weld root zone,and leads to the fracture failure of the connections.The quantitative evaluation method for the fracture of beam-column connections in steel frame can provide the references for the selection of steel,welding material,weld access hole and connection form in the anti-fracture design of connections.
引文
[1]Bonowitz D,Reis E.State of the art report on pastperformance of steel moment-frame buildings in earth-quakes(FEMA-355E)[R].Washington D C:Fede-ral Emergency Management Agency,2000.
    [2]Kuwamura H.Classification of material and weldingin fracture consideration of seismic steel frames[J].Engineering Structures,2003,25(5):547-563.
    [3]石永久,李兆凡,陈宏,等.高层钢框架新型梁柱节点抗震性能试验研究[J].建筑结构学报,2002,23(3):2-7.(SHI Yong-jiu,LI Zhao-fan,CHEN Hong,et al.Ex-perimental research on cyclic behavior of new types ofbeam-column connections in highrise steel frames[J].Journal of Building Structures,2002,23(3):2-7.)
    [4]Chi W M,Deierlein G G,Ingraffea A.Fracture tough-ness demands in welded beam-column moment con-nections[J].Journal of Structural Engineering,2000,126(1):88-97.
    [5]Matos C G,Dodds R H.Probabilistic modeling ofweld fracture in steel frame connections part I:quasi-static loading[J].Engineering Structures,2001,23(8):1011-1030.
    [6]Matos C G,Dodds R H.Probabilistic modeling ofweld fracture in steel frame connections part II:seis-mic loading[J].Engineering Structures,2002,24(6):687-705.
    [7]Chi W M,Kanvinde A M,Deierlein G G.Predictionof ductile fracture in steel connections using SMCScriterion[J].Journal of Structural Engineering,2006,132(2):171-181.
    [8]王元清,周晖,石永久,等.钢结构厚板层状撕裂及其防止措施的研究现状[J].建筑钢结构进展,2010,12(5):26-34.(WANG Yuan-qing,ZHOU Hui,SHI Yong-jiu,et al.A research review on mechanism and prevention of la-mellar tearing in thick plate of steel structures[J].Progress in Steel Building Structures,2010,12(5):26-34.)
    [9]Barsom J M,Korvink S A.Through-thickness proper-ties of structural steels[J].Journal of Structural Engi-neering,1998,124(7):727-735.
    [10]Dexter R J,Melendrez M I.Though-thickness proper-ties of column flanges in welded moment connections[J].Journal of Structural Engineering,2000,126(1):24-31.
    [11]Wang Y Q,Zhou H,Shi Y J,et al.Study on fracturetoughness indices of Chinese structural steel and weldmetal[C]//20th International Offshore and Polar En-gineering Conference.Beijing,China,2010:129.
    [12]Wu Y M,Wang Y Q,Shi Y J,et al.Effects of lowtemperature on properties of structural steels[J].Journal of University of Science and Technology Bei-jing,2004,11(5):442-448.
    [13]李杰.地震循环载荷下钢结构梁柱焊接节点耗能与损伤行为的研究[D].天津:天津大学,2002.(LI Jie.Investigation on energy dissipation and accu-mulative damage of welded beam-to-column connec-tion under earthquake cyclic loading[D].Tianjin:Tianjin University,2002.)
    [14]张莉.钢结构刚性梁柱节点抗震性能的研究[D].天津:天津大学,2004.(ZHANG Li.Study on earthquake resistance of rigidbeam-to-column connection of steel structure[D].Tianjin:Tianjin University,2004.)
    [15]Ricles J M,Mao C S,Lu L W,et al.Inelastic cyclictesting of welded unreinforced moment connections[J].Journal of Structural Engineering,2002,128(4):429-440.
    [16]Paret T F.The W1 issue I:extent of weld fracturingduring northridge earthquake[J].Journal of Structu-ral Engineering,2000,126(1):10-18.
    [17]Jones S L,Fry G T,Engelhardt M D.Experimentalevaluation of cyclically loaded reduced beam sectionmoment connections[J].Journal of Structural Engi-neering,2002,128(4):441-451.
    [18]Chen S J,Tu C T.Experimental study of jumbo sizereduced beam section connections using high-strengthsteel[J].Journal of Structural Engineering,2004,130(4):582-587.
    [19]Chen C C,Lin C C,Lin C H.Ductile moment connec-tions used in steel column-tree moment-resistingframes[J].Journal of Constructional Steel Research,2006,62(8):793-801.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心