厚冲积层下大采高综放工作面顶板控制机理与实践
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
龙固煤矿主采煤层上覆基岩厚度平均不足200 m,但基岩上方赋存着厚度平均超过700 m的厚冲积层,针对厚冲积层条件下工作面矿山压力与顶板的控制难题,分析了大采高长壁综放工作面上覆厚冲积层在采动卸荷条件下的承载特性,以及基岩发生台阶下沉的可能性及其对应临界厚度。研究结果表明,厚冲积层在其底部煤层大范围开挖后,自承载能力不强,其自重将以载荷形式作用在下伏基岩上,但当基岩厚度大于120 m时,断裂带岩层可以形成稳定的力学承载结构,确定工作面顶板具有可控性。在此基础上,研发了工作阻力为国内最大的ZF15000/23/43综放支架,对厚冲积层下大采高综放面围岩进行了有效控制。
The average thickness of the overlying bedrock of Longgu primary mineable coalseam is less than 200 m,but there is a thick alluvium averaging above 700 m above the bedrock.The bearing characteristic of fully mechanized longwallcaving face with large mining height on the condition of unloading,the possibility of step sinking and its critical thickness are analyzed in order to solvethe problems of the mine pressure atmining face and strata control underthick alluvium condition.The results show that,whileits bearing capacity is not strong after large excavation underthe bottom of deep alluvium and itsweight is loaded onthe underlying bedrock,the fracture zone can form a stable mechanical bearing structurewhen the thickness of the bedrock is more than 120 m,so the coalface roof canbe controlled.On this basis,ZF15000/23/43 hydraulic support has been developed,with the largest working resistance in China.With this hydraulic support,the surrounding rock in fully mechanized caving coalface with large mining height underthick alluvium can becontrolled.
引文
[1]袁亮.煤与瓦斯共采:领跑煤炭科学开采[EB/OL].http://big5.cas.cn/xw/zjsd/201102/t20110221_3073262.html,2011-02-21/2012-02-10.Yuan Liang.Co-extraction of coal and methane:lead mining coal sci-ence[EB/OL].http://big5.cas.cn/xw/zjsd/201102/t20110221_3073262.html,2011-02-21/2012-02-10.
    [2]史元伟,张声涛,尹世魁.国内外煤矿深部开采岩层控制技术[M].北京:煤炭工业出版社,2009.
    [3]刘金海,姜福兴,王乃国,等.深井特厚煤层综放工作面支承压力分布特征的实测研究[J].煤炭学报,2011,36(S1):18-22.Liu Jinhai,Jiang Fuxing,Wang Naiguo,et al.Survey on abutmentpressure distribution of fully mechanized cavingface in extra-thickcoal seam of deep shaft[J].Journal of China Coal Society,2011,36(S1):18-22.
    [4]山东新巨龙矿业有限责任公司,中国矿业大学,新汶矿业集团.龙固特大型千米深井生产技术[R].2011.Shandong Xinjulong Mining Co.,Ltd.,China University of Miningand Technology,Xinwen Mining Group Co.,Ltd.Longgu extra-largeone thousand meters deep coal mine production technology[R].2011.
    [5]Guo Weijia,Yin Liming.Three-dimensional semi-analytical numeri-cal calculation method on mining subsidence[A].Proceedings of2009 International Symposium on Risk Control and Management ofDesign,Construction and Operation In Underground Engineering[C].2009:14-17.
    [6]成云海,姜福兴,庞继禄.特厚煤层综放开采采空区侧向矿压特征及应用[J].煤炭学报,2012,37(7):1088-1093.Cheng Yunhai,Jiang Fuxing,Pang Jilu.Research on lateral stratapressure characteristic in goaf of top coal caving in extra thick coalseam and its application[J].Journal of China Coal Society,2012,37(7):1088-1093.
    [7]杜锋,白海波.厚松散层薄基岩综放开采覆岩破断机理研究[J].煤炭学报,2012,37(7):1105-1110.Du Feng,Bai Haibo.Mechanism research of overlying strata activitywith fully mechanized caving in thin bedrock with thick alluvium[J].Journal of China Coal Society,2012,37(7):1105-1110.
    [8]俞启香,程远平,将承林.厚冲积层大采深村庄下综放开采实践[M].徐州:中国矿业大学出版社,2005.
    [9]蒋斌松,张强,韩立军.采动岩层荷载计算方法修正[J].煤炭学报,2007,32(6):581-585.Jiang Binsong,Zhang Qiang,Han Lijun.Modification of calculationmethod for the load of mining-induced strata[J].Journal of ChinaCoal Society,2007,32(6):581-585.
    [10]孔令海,姜福兴,刘杰,等.特厚煤层综放工作面区段煤柱合理宽度的微地震监测[J].煤炭学报,2008,25(1):23-25.Kong Linghai,Jiang Fuxing,Liu Jie,et al.High precision microseis-mic monitoring system to reasonable width of segment coal pillar inextra thick coal seam fully mechanized top coal caving mining[J].Journal of China Coal Society,2008,25(1):23-25.
    [11]高庆潮,胡炳南.特厚冲积层条件下大采高综采地表移动变形特征[J].煤矿开采,2003,8(2):19-21.Gao Qingchao,Hu Bingnan.Features of surface deformation andmoving with great cutting-height fully mechanized mining under ex-tra-thick alluvium deposit[J].Coal Mining Technology,2003,8(2):19-21.
    [12]钱鸣高,缪协兴,许家林,等.岩层控制的关键层理论[M].徐州:中国矿业大学出版社,2003.
    [13]岑传鸿,窦林名.采场顶板控制与监测技术(第二版)[M].徐州:中国矿业大学出版社,2004.
    [14]姜福兴,马其华.深部长壁工作面动态支承压力极值点的求解[J].煤炭学报,2002,27(3):273-275.Jiang Fuxing,Ma Qihua.Mechanical solution of the maximum pointof dynamic abutment pressure under deep long-wall working face[J].Journal of China Coal Society,2002,27(3):273-275.
    [15]闫少宏,尹希文.大采高综放开采几个理论问题的研究[J].煤炭学报,2008,33(5):481-484.Yan Shaohong,Yin Xiwen.Discussing about the main theoreticalproblems of long wall with top coal caving[J].Journal of ChinaCoal Society,2008,33(5):481-484.
    [16]闫少宏,毛德兵,范韶刚.综放工作面支架工作阻力确定的理论与应用[J].煤炭学报,2002,27(1):64-67.Yan Shaohong,Mao Debing,Fan Shaogang.The theory and its ap-plication of determining working resistance of powered support inlongwall with top-coal caving technology[J].Journal of China CoalSociety,2002,27(1):64-67.