计算锚索抗滑桩变形及内力的一种新方法
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
结合结构力学和弹性地基梁理论,考虑锚索的弹性变形,建立了一种计算锚索抗滑桩变形及内力的新方法。在建立公式时,将抗滑桩从滑面处分为上、下两部分;对嵌固段的桩按弹性地基梁计算,滑面以上的桩用力法计算;利用滑面处的变形协调条件,建立了锚索抗滑桩的计算公式,所得公式可以方便地用于求解锚索的设计拉力、抗滑桩的内力及变形。最后,以某滑坡治理工程为例,计算了锚索拉力及抗滑桩的内力,验证了计算方法的可靠性,并与普通抗滑桩的计算结果进行了对比分析。
Combined with structural mechanics and elastic foundation beam theory,a new mechanics calculation model of anchor anti-slide pile was established considering the elastic deformation of anchor cable.In deducing the formula,the anti-slide pile was divided into top and bottom segments from the sliding surface.The bottom segment,which was embedded in the slip bed,was calculated as a elastic foundation beam,and the top section was calculated by force method.Using the deformation compatibility condition of pile section on the sliding surface,the calculation formula of anchor pile was established,and the formula was very convenient to solve anchor cable tension force,anti-slide pile internal force and deformation of the body.Finally,taking a landslide control project as an example,the anchor cable tension and pile internal force were calculated,the reliability of the method was verified,and the result was compared with that of ordinary anti-slide pile.
引文
[1]门玉明,邓军涛,李金湘.锚索抗滑桩设计中的几个问题探讨[J].公路交通科技,2005,22(6):52-54.MEN Yu-ming,DENG Jun-tao,LI Jin-xiang.Study onthe Anchor Anti-slide Pile[J].Journal of Highwayand Transportation Research and Development,2005,22(6):52-54.
    [2]许英姿,韦万正,卢玉南.竖向预应力锚索抗滑桩的优化研究[J].工程地质学报,2011,19(1):83-87.XU Ying-zi,WEI Wan-zheng,LU Yu-nan.OptimalDesign Study of Anti-slide Pile with Vertical Pre-stressed Anchor[J].Journal of Engineering Geology,2011,19(1):83-87.
    [3]冯玉国,王渭明,刘军熙.预应力锚索抗滑桩结构稳健优化设计[J].岩土工程学报,2009,31(4):515-520.FENG Yu-guo,WANG Wei-ming,LIU Jun-xi.RobustOptimization Design of Anti-slide Piles with PrestressedAnchor Cables[J].Chinese Journal of GeotechnicalEngineering,2009,31(4):515-520.
    [4]张永兴,董捷,文海家,等.考虑自重应力的悬臂式抗滑桩三维土拱效应及合理间距研究[J].中国公路学报,2009,22(2):18-25.ZHANG Yong-xing,DONG Jie,WEN Hai-jia,et al.Research on Three-dimensional Soil Arching Effectand Appropriate Spacing of Cantilever Anti-slide Pileswith Consideration of Geostatic Stress[J].China Journalof Highway and Transport,2009,22(2):18-25.
    [5]李功伯,谢建清.滑坡稳定性分析与工程治理[M].北京:地震出版社,1997.LI Gong-bo,XIE Jian-qing.Stability Analysis andRestriction Engineering for Landslide[M].Beijing:Earthquake Press,1997.
    [6]刘小丽,周德培,杨涛.预应力锚索抗滑桩设计中确定锚索预应力值的一种方法[J].工程地质学报,2002,10(3):317-320.LIU Xiao-li,ZHOU De-pei,YANG Tao.A Method forComputing the Prestressing Force of the Anti-slidePile with Prestressed Cable[J].Journal of EngineeringGeology,2002,10(3):317-320.
    [7]刘焕斌,晏鄂川,吴益平,等.桩锚结构预应力的变形协调确定方法[J].岩土力学,2007,28(增):891-894.LIU Huan-bin,YAN E-chuan,WU Yi-ping,et al.ACompatible Distortion Method of Cable in Structureof Pile-anchor[J].Rock and Soil Mechanics,2007,28(S):891-894.
    [8]桂树强.预应力锚索抗滑桩结构计算方法[J].地球科学,2005,30(2):233-240.GUI Shu-qiang.Design Method for Using StabilizingPiles with Pre-stressed Anchored Cables in LandslideRemediation Works[J].Earth Science,2005,30(2):233-240.
    [9]周德培,王建松.预应力锚索桩内力的一种计算方法[J].岩石力学与工程学报,2002,21(2):247-250.ZHOU De-pei,WANG Jian-song.Design Method ofRetaining Pile with Prestressed Cable[J].ChineseJournal of Rock Mechanics and Engineering,2002,21(2):247-250.
    [10]李凯玲,门玉明.锚索抗滑桩系统内力变形研究[J].地球科学与环境学报,2007,29(4):400-403.LI Kai-ling,MEN Yu-ming.Research on InternalForce and Deformation of Anchor Anti-slide PilesSystem[J].Journal of Earth Sciences and Environ-ment,2007,29(4):400-403.
    [11]刘小丽,张占民,周德培.预应力锚索抗滑桩的改进计算方法[J].岩石力学与工程学报,2004,23(15):2568-2572.LIU Xiao-li,ZHANG Zhan-min,ZHOU De-pei.ImprovedMethod for Computing Anti-sliding Pile with PrestressedAnchoring Cable[J].Chinese Journal of Rock Mechanicsand Engineering,2004,23(15):2568-2572.
    [12]魏焕卫,贾强,陈建峰,等.基于MINDLIN解的边坡变形计算方法[J].建筑科学与工程学报,2008,25(1):49-54.WEI Huan-wei,JIA Qiang,CHEN Jian-feng,et al.Calculation Method of Slope Deformation Based onMINDLIN Solution[J].Journal of Architecture andCivil Engineering,2008,25(1):49-54.
    [13]孙勇,梁永松.单排单锚抗滑桩的一种新的计算方法[J].矿业研究与开发,2010,30(6):19-23.SUN Yong,LIANG Yong-song.A New CalculationMethed of Single-row Anti-slide Pile with Single-rowAnchor[J].Mining Research and Development,2010,30(6):19-23.
    [14]门玉明,李寻昌,张涛,等.锚索抗滑桩破坏模式探讨[J].工程地质学报,2011,19(增):438-443.MEN Yu-ming,LI Xun-chang,ZHANG Tao,et al.Discussed on the Failure Modes of Anti-slide Pile withAnchor Cable[J].Journal of Engineering Geology,2011,19(S):438-443.
    [15]姚海波,干昆蓉,伍冬,等.压力分散型锚索与拉力集中型锚索抗振性能研究[J].岩土力学,2012,33(12):3598-3603.YAO Hai-bo,GAN Kun-rong,WU Dong,et al.Re-search on Anti-vibration Ability of Pressure DispersedAnchor Cable and Tension Concentrated Anchor Ca-ble[J].Rock and Soil Mechanics,2012,33(12):3598-3603.
    [16]胡庆安,夏永旭,赵子胜.抗滑桩滑坡治理工程数值模拟研究[J].长安大学学报:建筑与环境科学版,2003,20(4):8-12.HU Qing-an,XIA Yong-xu,ZHAO Zi-sheng.FiniteElement Numerical Simulation of Slipping SlopeTreatment by Anti-slipping Piles[J].Journal ofChangan University:Architecture and EnvironmentScience Edition,2003,20(4):8-12.
    [17]张友葩,高永涛,吴顺川,等.失稳挡土墙加固数值分析[J].交通运输工程学报,2003,3(4):17-21.ZHANG You-pa,GAO Yong-tao,WU Shun-chuan,et al.Numerical Analysis of Reinforcement for UnstableRetaining Wall[J].Journal of Traffic and Transporta-tion Engineering,2003,3(4):17-21.
    [18]罗强,李亮.锚索失效对边坡稳定性影响的模拟试验[J].长安大学学报:自然科学版,2011,31(1):69-73.LUO Qiang,LI Liang.Model Test on Influence ofAnchorage Failure to Slope Stability[J].Journal ofChangan University:Natural Science Edition,2011,31(1):69-73.
    [19]冯忠居,张永清.预应力锚索技术加固处理滑坡上桥墩偏移[J].西安公路交通大学学报,2001,21(3):39-41.FENG Zhong-ju,ZHANG Yong-qing.The InclinationPrevention of Pier on the Landslide by Prestress An-chor Cable Technique[J].Journal of Xian HighwayUniversity,2001,21(3):39-41.
    [20]唐树名,曾祥勇,邓安福.预应力锚索群锚锚固边坡均质岩体的室内模型试验研究[J].中国公路学报,2004,17(3):23-27.TANG Shu-ming,ZENG Xiang-yong,DENG An-fu.Laboratory Model Test Investigation of PrestressedAnchor Cable Group Strengthened Slope Intact Rock[J].China Journal of Highway and Transport,2004,17(3):23-27.
    [21]钱同辉,徐华,夏文才,等.框架式抗滑桩受力特性对比分析[J].中国公路学报,2012,25(6):56-59.QIAN Tong-hui,XU Hua,XIA Wen-cai,et al.ForceAnalysis of Framed Anti-slide Piles[J].China Journalof Highway and Transport,2012,25(6):56-59.
    [22]刘鸣,黄华,韩冰,等.延安地区某边坡双排抗滑桩支护分析[J].长安大学学报:自然科学版,2011,31(2):63-67.LIU Ming,HUANG Hua,HAN Bing,et al.Analysison Double-row Anti-slide Piles of Slope in Yanan[J].Journal of Changan University:Natural Science Edi-tion,2011,31(2):63-67.
    [23]邵勇,覃仁辉.预应力锚索框架梁边坡支护数值模拟[J].地球科学与环境学报,2010,32(3):307-310.SHAO Yong,QIN Ren-hui.Numerical Simulation ofSlope Supporting for Prestressed Anchor with FrameBeam[J].Journal of Earth Sciences and Environment,2010,32(3):307-310.
    [24]张发明,刘汉龙,赵维炳.某高等级公路路堑边坡预应力锚索加固设计[J].西安工程学院学报,2000,22(2):38-40.ZHANG Fa-ming,LIU Han-long,ZHAO Wei-bing.Anchoring Designing for Cut Rock Slope of Express-way[J].Journal of Xian Engineering University,2000,22(2):38-40.
    [25]史良,张哲,李寻昌,等.316国道K25+040~+140段滑坡治理中的抗滑桩结构设计[J].地球科学与环境学报,2004,26(3):44-47.SHI Liang,ZHANG Zhe,LI Xun-chang,et al.Design ofAnti-sliding Piles on Landslide Control[J].Journal ofEarth Sciences and Environment,2004,26(3):44-47.
    [26]史振兴,巨能攀,邓琼.弹性地基梁理论在锚索抗滑桩计算中的应用[J].工程地质学报,2010,18(2):229-234.SHI Zhen-xing,JU Neng-pan,DENG Qiong.Applica-tion of Elastic Foundation Beam Theory to Calculationof Anchor Cable Anti-slide Pile[J].Journal of Engi-neering Geology,2010,18(2):229-234.
    [27]铁道部工务局.铁路工务技术手册:路基[M].北京:中国铁道出版社,1995.Works Bureau of Ministry of Railways.TechnicalManuals of Railway Works:Subgrade[M].Beijing:China Railway Publishing House,1995.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心