施工过程中隔震层钢筋砼梁变形初步分析
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
以某隔震工程隔震层梁出现裂缝为研究背景,运用有限元分析软件SAP2000对隔震结构和非隔震结构进行了施工过程模拟,分析对比了两种结构在施工过程中隔震层钢筋砼梁的内力和变形规律,对隔震层梁裂缝形成的原因进行了分析,并运用有限元分析软件ANSYS对该原因下梁的裂缝进行了数值模拟。结果表明隔震层梁出现的裂缝是由施工荷载、温度变化和混凝土收缩共同作用引起的:建筑物施工期间结构刚度尚处在成长阶段,受到支撑变形、温度变化和混凝土收缩等不利作用对结构长期性能和耐久性产生负面影响。对于两种结构,常规算法由于不考虑框架的生成和加载历史,算得的内力值均偏小;而隔震结构偏小的幅度更大,因而更危险。计算同时表明,在结构施工过程中,各层梁当拆除其支撑、模板和浇筑其上一层时,其内力达到最大值;其中隔震层梁内力最大,为隔震结构在施工中的薄弱部位。给出了对其加强保护的施工建议。
This paper simulated the construction process of isolated and traditional seismic-resistant structures.The internal force and deformation law of the girder in the isolation layers were analyzed in the two types of structures during construction.In addition,the reason for girder cracking in the isolation layers was examined by using the finite element method(FEM) to simulate cracking.The results show that girder cracking in the isolation layers is caused by construction loads,temperature fluctuation,and concrete shrinkage.During the period of construction,structural stiffness develops,which causes adverse reactions of shore deformation,temperature fluctuation,and concrete shrinkage to produce negative effects on long-term performance and durability of the structure.Such factors significantly affect both isolated and traditional seismic resistant structures.Compared with the traditional seismic resistant structure,the isolated structure,which has larger load effects,is more likely to encounter safety issues during the construction period.Each floor's internal forces reach the maximum when the templates of the floor beam are removed and concrete is poured on the structure.The isolation layers are the weakest parts and should therefore be given sufficient attention.
引文
[1]陈宇钧,刘西拉.现浇钢筋混凝土框架结构考虑施工过程的内力分析[J].四川建筑科学研究,1992,(4):7-11.CHEN Yu-jun,LIU Xi-la.The internal force analysis of cast-in-situ reinforced concrete structure considering the construc-tion process[J].Sichuan Building Science,1992,(4):7-11.
    [2]李瑞礼,曹志远.高层建筑结构施工力学分析[J].计算力学学报,1999,16(2):157-161.LI Rui-li,CAO Zhi-yuan.Construction mechanics analysis intall buildings[J].Chinese Journal of Computal mechanics,1999,16(2):157-161.
    [3]方东平,耿川东,祝宏毅,等.施工期钢筋混凝土结构特性的计算研究[J].土木工程学报,2000,33(6):57-62.FANG Dong-ping,GEN Chuan-dong,ZHU Hong-yi,et al.Analysis of reinforced concrete structure during construction[J].China Civil Engineering Journal,2000,33(6):57-62.
    [4]赵挺生,方东平,张传敏.施工阶段多(高)层建筑钢筋混凝土结构统一模型[J].清华大学学报(自然科学版),2004,44(12):1680-1683.ZHAO Ting-sheng,FANG Dong-ping,ZHANG Chuan-min.Unified model of reinforced concrete structures of multi-storyor high-rise buildings during construction[J].J.TsinghuaUniv.(Sci.&Tech.),2004,44(12):1680-1683.
    [5]薛娜,李鸿晶,伍小平.结构施工时变内力分析[J].南京工业大学学报(自然科学版),2005,27(11):73-77.XUE Na,LIU Hong-jing,WU Xiao-ping.Time-dependent a-nalysis of construction internal forces of strucrures[J].Journalof Nanjin University of Technology,2005,27(11):73-77.
    [6]徐蓉,贺明华.混凝土结构施工过程的数值模拟分析[J].结构工程师,2011,27(1):144-148.XU Rong,HE Ming-hua.Numerical analysis for constructionprocess of RC structures[J].Structural Engineers,2011,27(1):144-148.
    [7]赵军,杨绿峰.钢筋混凝土框架结构施工力学分析[J].广西大学学报(自然科学版),2011,36(1):59-63.ZHAO Jun,YANG Lu-feng.Mechanical analysis of the rein-forced concrete frame structure during construction[J].Journalof Guangxi University(Nat.Sci.Ed.),2011,36(1):59-63.
    [8]黄远中.框架结构施工过程仿真分析[J].企业科技与发展,2010,(14):126-130.HUANG Zhong-yuan.Simulation anslysis on the constructionprocess of framework structure[J].Enterprise science andtechnology&development,2010,(14):126-130.
    [9]杜永峰,张尚荣,李慧.多级串联非比例阻尼隔震结构地震响应分析[J].西北地震学报,2012,34(4):319-323.DU Yong-feng,ZHANG Shang-rong,LI Hui.Seismic Re-sponse Analysis on Multistage Series Non-proportion DampingIsolated Structure[J].Northwestern Seismological Journal,2012,34(4):319-323.
    [10]汤华涛,吴新跃.体壳单元连接MPC法的计算精度分析[J].现代制造工程,2011,(7):62-65.TANG Hua-tao,WU Xin-yue.Calculation precision of mul-tipoint constraint technology used to solve combination modelof solid element and shell element[J].Modern ManufacturingEngineering,2011,(7):62-65.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心