焦作电厂异地扩建工程地基处理方案比选
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
大中型火力发电厂主厂房对地基承载力要求较高,在天然地基不能满足要求的情况下,须进行地基处理。针对建构筑物荷载性质及分布不同,对应的地基处理方式也不一样,采用哪种地基处理方法更为经济、合理、有效,应进行具体分析。本文通过焦作电厂异地扩建工程实例,综合评价厂区主要建构筑物,有选择地采用700后注浆灌注桩、600后注浆灌注桩、CFG桩复合地基、天然地基等地基处理方式,对地基处理方案比选做了简要介绍。
The main workshop buildings of the large and medium thermal power plant have higher requirements for the foundation bearing capacity,if the natural foundation can not meet the requirements,the foundation must be treated. In view of the different building load characteristics and distribution of different architectural structures,corresponding method of foundation treatment is different also,then the more economical,reasonable and effective scheme of the foundation treatment must be adopted through analysis and comparison. By using the actual engineering example of Jiaozuo power plant offsite expansion project,comprehensively evaluating the main plant building structures,this paper has the option of using the post-grouting bored pile,CFG pile composite foundation and natural foundation etc. foundation treatment,the paper briefly introduces and analyzes the schemes of the foundation treatment.
引文
[1]中国地震局.GB18306-2001中国地震动参数区划图[S].北京:中国标准出版社,2001.
    [2]中国建筑科学研究院.GB50011-2010建筑抗震设计规范[S].北京:中国建筑工业出版社,2010.
    [3]中华人民共和国建设部.GB50007-2002建筑地基基础设计规范[S].北京:中国建筑工业出版社,2002.
    [4]中华人民共和国住房和城乡建设部.JGJ94-2008建筑桩基技术规范[S].北京:中国建筑工业出版社,2008.
    [5]赵军,韩晓超,李永奇.洛阳热电厂主厂房地基处理方案的论证[J].河南电力,2007,4:46-49.
    [6]周全成,王中荣.滨海地带电厂主厂房地基处理方案优化分析[J].电力勘测设计,2007,10(5):14-16.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心