两座85m钢筋砼烟囱同时爆破拆除振动研究
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
针对贵州铝厂的两座85m高钢筋砼高耸烟囱在采用爆破拆除法拆除时产生的振动及传播规律,采用理论分析、现场工程监测等方法开展研究。研究结果表明:爆破拆除烟囱过程中共产生四次较大的振动信号波动,分别由炸药爆炸、支撑破坏、切口闭合及撞击地面所引起;被保护物旁测点的振动监测结果远小于爆破振动和塌落振动的理论计算值,主要是由于爆破点高于测点,爆破振动传播存在低程衰减效应,另外在烟囱塌落撞击的地面上铺设缓冲材料可以有效降低振动。
To explore the vibration and the propagation behavior caused by demolishing of two reinforced concrete chimney with 85 meters height in Gui Zhou Aluminum Plant,the methods of theoretical analysis and project monitor were performed. The results show four larger fluctuation of vibration signal existed in the process of demolishing,mainly from explosion,break of supports,close of blasting incision and impact with the ground. The results of vibration from the monitoring equipment were much smaller than the theoretical calculation,mainly caused by two reasons: one was the low attenuation effect for the position of blasting point higher than monitoring point,and another one was the buffer materials influence built on the ground where the chimney toppling.
引文
[1]徐全军,伍睿星,白帆,等.高耸建(构)筑物爆破塌落振动峰值速度估算[J].工程爆破,2011,17(3):49-52.[1]XU Quan-jun,WU Rui-xing,BAI Fan,et al.Estimation on ground collapse vibration velocity peak value of blasting high building[J].Engineering Blasting,2011,17(3):49-52.(in Chinese)
    [2]沈立晋,汪旭光,于亚伦,等.100m高烟囱拆除爆破冲击振动测试与分析[J].工程爆破,2002,8(4):16-19.[2]SHEN Li-jin,WANG Xu-guang,YU Ya-lun,et al.Monitoring and analysis of impact vibration caused by tippling of a Chimney with height of 100 meters[J].Engineering Blasting,2002,8(4):16-19.(in Chinese)
    [3]吴春平,窦金龙,于亚伦,等.150m钢筋混凝土烟囱爆破拆除振动测试与分析[C]∥第九届全国工程爆破学术会议,2008:733-737.
    [4]潘玉忠,张义平,吴斌,等.爆破拆除高耸筒式建筑物触地震动监测与分析[J].矿业研究与开发,2011,31(1):95-97.[4]PAN Yu-zhong,ZHANG Yi-ping,WU Bin,et al.Monitoring and analysis of touchdown vibration in the demolition blasting of towering barrel type building[J].Mining Research and Development,2011,31(1):95-97.(in Chinese)
    [5]魏兴,池恩安,邹锐,等.复杂环境下钢筋混凝土双烟囱爆破拆除技术[J].爆破,2008,25(2):57-60.[5]WEI Xing,CHI En-an,ZOU Rui.Blasting demolition of 2reinforced concrete chimneys in complex environment[J].Blasting,2008,25(2):57-60.(in Chinese)
    [6]王林.烟囱爆破拆除的地震效应分析[J].爆破,1997,14(3):18-20.[6]WANG Lin.Seismic effects of chimney blasting demolishment[J].Blasting,1997,14(3):18-20.(in Chinese)
    [7]王瑞贵.建筑物爆破拆除塌落触地震动效应研究[D].武汉:武汉大学,2005.
    [8]汪旭光.爆破设计与施工[M].北京:冶金工业出版社,2011.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心