钢管混凝土柱节点灌浆套筒连接装置设计及应用
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
钢管混凝土柱节点连接是装配式钢管混凝土组合剪力墙结构的薄弱环节,直接影响结构体系的整体性能和推广应用。提出了一种新型的钢管混凝土柱灌浆套筒连接方法,从其设计与受力原理的分析出发,对其设计参数、细部构造及应用范围进行详细说明。该连接方式具有受力明确、施工简便及连接可靠等特点。此外,介绍了该套筒式连接方式的实际应用与试验概况,试验表明,该连接方式满足工程连接安全性和可行性的要求。
The joint connections of concrete filled steel tube column are the weak link in prefabricated composite shear wall with concrete filled steel tube columns,it affects the integrative performance,popularization and application of the structure system directly. A new type of grout sleeve connection method for concrete filled steel tube column is proposed. starting from the analysis of its design and mechanical principle,the design parameters,detail structures and application range of this new connection were detailed. And this type of connection has such characteristics as definite load conditions,convenient construction and reliable connection. Furthermore,practical applications and experimental situations of this sleeve connection are also introduced. The test results indicate that the joint connection can satisfy the requirements for safety and feasibility of engineering connection.
引文
[1]张瑞云,刘杰.钢-混凝土组合结构的研究与实践[J].石家庄铁道学院学报,2006,02:1-5.Zhang Ruiyun,Liu Jie.Research and Construction Practice of Steel-Concrete Composite Structure[J].Journal of Shijiazhuang Railway Institute,2006,02:1-5.
    [2]张厚垒.福州白马大厦工程钢管混凝土柱的节点设计与施工[J].福建建筑,2006,5:63-65.Zhang Houlei.Design and Construction of Concrete-Filled Tubular joint of BAIMA building in Fuzhou[J].Fujian Construction,2006,5:63-65.
    [3]赵媛媛,蒋首超.灌浆套管节点技术研究概况[J].工业建筑,2009,39(s1):514-517Zhao Yuanyuan,Jiang Shouchao.A general view of research on grouted tubular connections[J].Industrial Construction,2009,39(s1):514-517(in Chinese)
    [4]蔡健,杨春,苏恒强.对穿暗牛腿式钢管混凝土柱节点试验研究[J].华南理工大学学报,2000,(5):105-109.Cai Jian,Yang Chun,Su Hengqiang.Experimental Study on Joints of Concrete Filled Steel Tubes with Piercing Reinforcing Bar Hidden Bracket.Journal of South China University of Technology,2000,(5):105-109.
    [5]李惠,吴波,张洪涛.钢管高强混凝土叠合节点中核心部分的静力承载力研究[J].哈尔滨建筑大学学报,1998,02:1-6.Li Hui,Wu Bo,Zhang Hongtao.Experimental Study on Static Loading Capacity of the Centre Part of Laminated Joint of Steel Tube Filled with High Strength Concrete[J].Journal of Harbin University of Civil Engineering and Architecture,1998,02:1-6.
    [6]李学平,吕西林.方钢管混凝土柱外置式环梁节点的联结面抗剪研究[J].同济大学学报,2002,30(1):11-17.Li Xueping,Lu Xilin.Shear-resistant Capacity of Interface of Ring-beam Connection Located outside Concrete-filled Rectangular Tubular Column[J].Journal of Tongji University,2002,30(1):11-17.
    [7]吕西林,陆伟东.反复荷载作用下方钢管混凝土柱的抗震性能试验研究[J].建筑结构学报,2000,21(2):2-7.Lu Xilin,Lu Weidong.Seismic Behavior of Conerete-filled Rectangular Steel Tubular Columns Under Cyclic Loading[J].Journal of Building Structures,2000,21(2):2-7.
    [8]过镇海,时旭东.钢筋混凝土原理和分析[M].清华大学出版社,2003:189-190.Guo Zhenhai,Shi Xudong.Reinforced Concrete Theory and Analyse[M].Tsinghua University Press,2003(2007):146-162.
    [9]陈建伟,苏幼坡.预制装配式剪力墙结构及其连接技术[J].世界地震工程,2013,29(1):38-48.Chen Jianwei,Su Youpo.Prefabricated shear wall structure and the connection technology[J].World Earthquake Engineering,2013,29(1):38―48.
    [10]陈建伟,苏幼坡,张超,齐红甲,陈海彬.两层钢管混凝土带水平缝剪力墙抗震性能试验研究[J].建筑结构学报,2014,35(3):93-101.Chen Jianwei,Su Youpo,Zhang Chao,Qi Hongjia,Chen Haibin.Experimental study on seismic behavior of two-story shear wall with concrete filled steel tube columns and horizontal joints.Journal of Building Structures,2014,35(3):93-101.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心