桩基础单桩静载试验及数值模拟
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
针对单桩的承载沉降规律及试验结果与数值模拟结果的差异较大的问题,采用试验分析和数值模拟相结合的方法,运用FLAC3D有限差分软件进行单桩数值静载试验模拟,通过对比实测数据和模拟数据结果发现:桩顶沉降误差为0.03mm,是实测值的6.3%.通过桩-土体的沉降计算接触面相对位移发现,粘性土极限位移为6~12 mm,施加到最后一级载荷时,桩-土体的相对位移未达到此值,因此,桩侧阻力载荷分担曲线呈上升趋势.
Aiming at the problem of the differences between experimental results and numerical simulation results and the load-settlement rules of the single pile, this paper adopted the method of experimental analysis combined with numerical simulation, and performed the numerical simulation of single pile static test using FLAC3 D Finite difference software. The result of comparing the simulation data and the measured data shows that pile top settlement error is 0.03 mm, which is 6.3% times of measured value, and it proved that the numerical simulation has feasibility by contrast. And through the settlement of pile and soil to calculate relative displacement of contact surface, viscous soil limit displacement is 6 ~12 mm. When it is applied to the last level of the load, the relative displacement of pile soil did not reach this value, so pile side resistance load sharing curve is on the rise.
引文
[1]高忠.单桩轴向载荷传递的理论分析[J].山西建筑,2003,29(l7):27-28.Gao Zhong.Theoretical Analysis on Axial Load Transfer of Single Pile[J].Shanxi Architecture,2003,29(l7):27-28.
    [2]桩基工程手册编写委员会.桩基工程手册[M].北京:中国建筑工业出版社,1997.Compilation Committee of Pile Foundation Engineering Handbook.Pile Foundation Engineering Handbook[M]:Bei Jing:Chinese Building Industry Press,1997.
    [3]中国建筑科学研究院.JGJ94-94.建筑桩基技术规范[S].北京:中国建筑工业出版社,1995.China Acdemy of Building Research.JGJ94-94.Technical specification for construction of pile foundation[S].Bei Jing:Chinese Building Industry Press,1995.
    [4]中国建筑科学研究院.JGJ79-2002.建筑地基处理技术规范[S].北京:中国建筑工业出版社,2002.China Acdemy of Building Research.JGJ79-2002.Technical specification for ground treatment of building[S].Bei Jing:Chinese Building Industry Press,2002.
    [5]李德军.桩基静载试验中常见问题及处理办法[J].山西建筑.2007,33(21):127-128.Li Dejun.Common Problems Encountered in Static Test of Pile Foundation and Treatment Methods[J].Shanxi Architecture,2007,33(21):127-128.
    [6]余敏.单桩静载荷试验极限承载力的预测[J].山西地震,2004(3):5-6.Yu Min.Forecasting Ultimate Bearing Capacity of Singe Pile with Static Load Experiment[J].Earthquake Research in Shanxi,2004(3):5-6.
    [7]郑卫锋,苏荣臻,鲁先龙,等.输电线路杆塔基础微型桩原型试验研究[J].辽宁工程技术大学学报:自然科学版,2010,29(1):79-82.Zheng Weifeng,Su Rongzhen,Lu Xianlong,et al.Field test on micropiles in foundation of transmission line tower[J].Journal of Liaoning Technical University Natural Science,2010,29(1):79-82.
    [8]Francesco Castelli,Michele Muageri.Sim Plified Nonlinear Anaylsis for Settlement Prediction of Pile Groups[J].Journal of Geotechnical and Geoenvironmental Engineering,2002,128(l):76-84.
    [9]孙华芬,侯克鹏,郭延辉.基于SQL Server平台复杂地质体FLAC3D模型的构建[J].辽宁工程技术大学学报:自然科学版,2012,31(4):500-503.Sun Huafen,Hou Kepeng,Guo Yanhui.Automatic model generation of complex geologic body with FLAC3d based on SQL server platform[J].Journal of Liaoning Technical University:Natural Science,2012,31(4):500-503.
    [10]刘波,韩彦辉.FLAC原理实例与应用指南[M].北京:人民交通出版社,2005.Liu Bo,Han Yanhui.The Principle of the FLAC instance and Application Guide instance and Application Guide[M].Bei Jing:China Communications Press,2005,
    [11]王向余,王成华,李绍飞.关于实体深基础法计算群桩承载力的探讨[J].港工技术,2003,12(4):42-45.Wang Xiangyu,Wang Chenhua,Li Shaofei.Discussion with Regard to the Equivalent Deep Foundation Method in Calculating Bearing Capacity of Grouped Piles[J].Port Engineering Technology,2003,12(4):42-45.
    [12]曹汉志.桩的轴向载荷传递及载荷-沉降曲线的数值计算方法[J].岩土工程学报,1986,8(6):37-45.Cao Hanzhi.Axial Loading Transfer of Pile and Numberical Calculation Method of Loading-Settlement Curve[J].Chinese Journal of Geotechnical Engineering,1986,8(6):37-45.
    [13]潘时声.用分层积分法分析桩的载荷传递[J].建筑结构学报,1991,12(5):68-79.Pan Shisheng.Load Transfer Analysis of piles by Layered Integration Method[J].Journal of Building Structures,1991,12(5):68-79.
    [14]张忠苗.桩基工程[M].北京:中国建筑工业出版社,2007.Zhang Zhongmiao.Pile Foundation Engineering[M].Bei Jing:Chinese Building Industry Press,2007.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心