塔山矿综放工作面停采线合理煤柱宽度实测
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
为了掌握综放工作面停采后超前支承压力分布及影响范围,分析研究既能满足巷道维护需要,又尽可能地减小煤柱损失的停采线煤柱宽度,通过在综采放顶煤工作面中间回风巷布置应力观测区和煤体松动范围观测区,动态监测煤柱内应力变化,同时进行了巷道围岩松动范围观测。结果表明:停采线煤柱应力测试中,最大应力读数为3.90 MPa,最小2.50 MPa,煤柱内50~170 m范围内受超前压力影响较小;停采线煤柱可减少到160 m。
In order to master the abutment pressure distribution and its influence scope of the fully mechanized caving face stop line,we analyze a reasonable coal pillar width which both can meet the needs of roadway maintenance and reduce the loss of coal pillar as much as possible. We dynamically monitor the stress changes of coal pillar and roadway surrounding rock loose range through arranging stress and the coal body loose scope observation areas at fully mechanized caving face return air lane. The results show that the maximum stress readings is 3. 90 MPa and minimum is 2. 50 MPa,which suggest that the coal pillar width within 50 m to 170 m is reasonable by abutment pressure,and the coal pillar width of stopping line could be reduced to 160 m.
引文
[1]刘正和,许志强.综放开采区段煤柱应力分布及其尺寸优化设计研究[J].山西煤炭,2009,29(1):19-21.
    [2]康天合,柴肇云,李义宝,等.底层大采高综放开采20m特厚中硬煤层的物理模拟研究[J].岩石力学与工程学报,2007,26(5):1065-1072.
    [3]孔令海,姜福兴,刘杰,等.特厚煤层综放工作面区段煤柱合理宽度的微地震监测[J].煤炭学报,2009,34(9):871-874.
    [4]赵国旭,谢和平,马伟民.宽厚煤柱的稳定性研究[J].辽宁工程技术大学学报,2004,23(1):38-40.
    [5]谢广祥,杨科,常聚才.煤柱宽度对综放面围岩应力分布规律影响[J].北京科技大学学报,2006,28(11):1005-1009.
    [6]张科学.深部煤层群沿空掘巷护巷煤柱合理宽度的确定[J].煤炭学报,2011,36(1):28-33.
    [7]杨科,王颂华,王树全.综放回采巷道护巷煤柱合理宽度分析[J].辽宁工程技术大学学报,2006,25(6):30-33.
    [8]吴永平.大同矿区特厚煤层综放采场矿压显现规律研究[J].煤炭科学技术,2008,36(1);8-10.
    [9]黄庆国.塔山煤矿特厚煤层综放开采关键技术[J].煤炭科学技术,2009,39(2):22-24.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心