深厚覆盖层上超高心墙堆石坝坝基廊道非线性开裂分析
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
长河坝是中国深厚覆盖层上在建的首座200 m级高的堆石坝,这类建于深厚覆盖层上的超高土石坝坝基廊道受力条件复杂,是工程成败的关键环节,国内已有类似工程出现廊道破坏尤其是廊道止水破坏导致渗漏的情况。针对这类坝型的坝基廊道安全性问题,以长河坝工程为依托进行了深入研究。采用子模型技术和混凝土非线性本构模型,详细模拟大坝真实填筑和蓄水过程,建立3维有限元模型对廊道开裂形式和破坏过程进行研究。计算分析得出了一些关于廊道裂缝的开裂范围、廊道受压屈服的范围、廊道裂缝的开裂顺序以及开裂方向等有用结论,并提出了一些合理化建议,为本工程和类似工程决策提供参考。
The galleries of high core wall rockfill dams on thick overburden layer is subjected to complicated loads,and its safety is the key to the project. In order to study the safety of galleries of this kind of dam,taking the Changheba dam as a background,and using the finite element analysis,the leakage from the destruction to the watertight seal was simulated. Based on the sub-model method,nonlinear elastic model was used for the gallery concrete. Cracking process and failure process of the gallery were conducted. Meanwhile the actual dam construction process and reservoir impounding process were considered. Through the analytical results the crack propagation,cracking direction and breakage feature were learned. Furthermore some reasonable suggestions were given,which can be used as reference to changheba project and similar project.
引文
[1]Lin Gao.Performance of dams suffered in Wenchuan earthquake and seismic safety analysis of dams[J].Journal of Dalian University of Technology,2009,49(5):657-666.[林皋.汶川大地震中大坝震害与大坝抗震安全性分析[J].大连理工大学学报,2009,49(5):657-666.]
    [2]Luo Shoucheng.Cognition of geological problems of thick overburden layer[J].Water Power,1995,31(4):21-25.[罗守成.对深厚覆盖层地质问题的认识[J].水力发电,1995,31(4):21-25.]
    [3]Xu Qiang,Chen Wei,Zhang Zhuoyuan.New views on forming mechanism of deep overburden on river bed in southwest of China[J].Advances in Earth Science,2008,23(5):448-456.[许强,陈伟,张倬元.对我国西南地区河谷深厚覆盖层成因机制的新认识[J].地球科学进展,2008,23(5):448-456.]
    [4]Xiong Kun,He Yunlong,Wu Xiaoyu,et al.Stress and deformation behavior of foundation gallery of Changheba hydropower station[J].Chinese Journal of Geotechnical Engineering,2011,33(11):1767-1774.[熊堃,何蕴龙,伍小玉,等.长河坝坝基廊道应力变形特性研究[J].岩土工程学报,2011,33(11):1767-1774.]
    [5]You Shijie,Yuan Changhai,Wang Lin,et al.Water seepage treatment of structural joints of dam foundation gallery in Pubugou hydropower station[J].Yangtze River,2011,42(24):38-40.[尤士介,袁长海,王林,等.瀑布沟水电站坝基廊道结构缝渗水[J].人民长江,2011,42(24):38-40.]
    [6]Zheng Peixi,Zhao Jing,Cui Huidong,et al.Seepage causes and treatment of structural joints in foundation corridor of Qiaoqi dam[J].Hydropower Automation and Dam Monitoring,2012,36(2):72-76.[郑培溪,赵静,崔会东,等.硗碛大坝坝基廊道结构缝渗漏原因分析及处理效果[J].水电自动化与大坝监测,2012,36(2):72-76.]
    [7]Wang Xiaoan,LV Haidong,Wang Ping,et al.Analysis of structural joint design of foundation river-bed gallery for core wall rockfill dam on deep overburden[J].Journal of Water Resources and Water Engineering,2013,24(1):135-137.[王晓安,吕海东,王平,等.深厚覆盖层心墙堆石坝坝基河床廊道结构缝设计[J].水资源与水电工程学报,2013,24(1):135-137.]
    [8]Suo Huimin,Jiang Yuanyuan,Jin Wei,et al.Design of dam foundation grouting grouting gallery for Luding hydropower station[J].Water Power,2011,37(5):20-21.[索慧敏,姜媛媛,金伟,等.泸定水电站坝基灌浆廊道设计[J].水力发电,2011,37(5):20-21.]
    [9]董哲仁.钢筋混凝土非线性有限元法原理与应用[M].北京:中国水利水电出版社,2002.
    [10]江见鲸,陆新征,叶列平.混凝土结构有限元分析[M].北京:清华大学出版社,2005.
    [11]Duncan J M,Chang Y C.Nonlinear analysis of stress and strain in soils[J].Journal of the Soil Mechanics and Foundations Division,ASCE,1970,96(5):1629-1653.