东日本大震灾灾后重建规划进展缓慢原因分析
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
日本作为自然灾害频发的国家,在历次大规模自然灾害应对经验的基础上形成了较为完善的防灾减灾法律及对策体制。但迄今为止,距2011年东日本大震灾发生已三年半有余,其灾后重建规划工作,以灾后重建规划的制定为主,进展仍旧缓慢。分析归纳了其原因,总结得出重建规划进展缓慢的四个因素下:受灾地的地域特性;城镇尺度的大规模重建事业,包括以海啸模拟计算为基础的避难计划及四种灾后重建模式两个方面;复杂的灾后重建规划制定流程,包括防灾集团移转促进事业及土地区画整理事业两个主要环节;人力及重建资源不足。
With the frequent occurrence of nature hazards,Japan is gradually developing its legislation and organization mechanism of disaster prevention and mitigation into perfection. However,three and a half year have already passed,the reconstruction project especially the reconstruction planning is still stumbling forward.To dig the reason is the research purpose of this article,and four aspects have been concluded as the main factors: the regional characteristics of the disaster affected area; the large municipality-involved scale of reconstruction work,referring to the evacuation plan based on the basic of tsunami simulation and the four reconstruction modes; the complicated process of making reconstruction plan,including two procedures of Promoting Group Relocation for Disaster Mitigation and land readjustment projects; the insufficiency of experience and reconstruction resources,both in manpower and material.
引文
[1]日本復興庁.復興の現状[R].东京:日本復興庁,2014.Reconstruction Agency,Japan.Current situation of reconstruction[R].Tokyo:Reconstruction Agency,Government of Japan,2014.(in Japanese)
    [2]岩手県の人口[N/OL].日本岩手県,[2014-11-03].http://www.pref.iwate.jp/seisaku/suishin/026546.html.The population of Iwate Prefecture[N/OL].Iwate Prefecture,Japan,[2014-11-03].http://www.pref.iwate.jp/seisaku/suishin/026546.html.(in Japanese)
    [3]平成23年版防災白書.阪神·淡路大震災と東日本大震災の比較[R/OL].日本内閣府,2011[2014-11-02].http://www.bousai.go.jp/kaigirep/hakusho/h23/bousai2011/html/hyo/hyo013.htm.Report of Disaster Prevention in 2011.Contrast between the Great Hanshin Earthquake and the Great East Japan Earthquake[R/OL].Cabinet Office,Government of Japan,2011[2014-11-02].http://www.bousai.go.jp/kaigirep/hakusho/h23/bousai2011/html/hyo/hyo013.htm.(in Japanese)
    [4]新潟地震震度分布図[N/OL].日本国土交通省気象庁,[2014-11-05].http://www.data.jma.go.jp/svd/eew/data/suikei/200410231756_371/200410231756_371_1.html.Seismic degree distribution of Niigata Prefecture Chuetsu Earthquake[N/OL].Ministry of Land,Infrastructure,Transport and Tourism,Meteorological Agency,Government of Japan,[2014-11-05].http://www.data.jma.go.jp/svd/eew/data/suikei/200410231756_371/200410231756_371_1.html.(in Japanese)
    [5]東北地方太平洋沖地震による死者の死因等及び身元確認状況について(平成24年9月6日)を内閣府がグラフ化[R].日本警察庁,2012.Graph of the identity and death reason of the dead in the Great East Japan Earthquake[R].National Police Agency,Japan,2012.(in Japanese)
    [6]防災対策の充実[N/OL].日本内閣府,2006[2014-11-05].http://www.cao.go.jp/yosan/soshiki/h18/zei/zei_bousai.html.Complement of disaster prevention strategy[N/OL].Cabinet Office,Government of Japan,2006[2014-11-05].http://www.cao.go.jp/yosan/soshiki/h18/zei/zei_bousai.html.(in Japanese)
    [7]2004年(平成16年)新潟県中越地震[R/OL].日本内閣府,2004[2014-11-05].http://www.bousai.go.jp/kaigirep/houkokusho/hukkousesaku/saigaitaiou/output_html_1/case200404.html.Niigata Prefecture Chuetsu Earthquake in 2004[R/OL].Cabinet Office,Government of Japan,2004[2014-11-05].http://www.bousai.go.jp/kaigirep/houkokusho/hukkousesaku/saigaitaiou/output_html_1/case200404.html.(in Japanese)
    [8]総合的な津波対策の考え方[R/OL].日本国土交通省,[2014-11-10].http://www.mlit.go.jp/common/000146461.pdf.Comprehensive thinking of counter tsunami measure[R/OL].Ministry of Land,Infrastructure,Transport and Tourism,Government of Japan,[2014-11-10].http://www.mlit.go.jp/common/000146461.pdf.(in Japanese)
    [9]小野田泰明.ホワイトナイトかゲリラか震災復興,建築家には何ができるのか[J].新建築,2012,(12):43-48.Onoda Y.White night or guerrilla:what could architects do about disaster reconstruction[J].Shinkentiku,2012,(12):43-48.(in Japanese)
    [10]小野田泰明.発災から2年目に考える[J].建築ノート,2013,(9):6-9.Onoda Y.Consideration 2 years after the disaster[J].Architecture Note,2013,(9):6-9.(in Japanese)
    [11]塩崎賢明,等.災害復興ガイド――日本と世界の経験に学ぶ[R].兵庫県震災復興研究センター,「災害復興がいど」編集委員会,2007.Shiozaki Y,Nishikawa E,et al.Guide of post-disaster reconstruction:learning from the experience from Japan and the world[R].Hyogo Research Center for Quake Restoration,Japan,2007.(in Japanese)
    [12]東日本大震災の被災地で行われる防災集団移転促進事業[R/OL].日本国土交通省,[2014-11-10].http://www.mlit.go.jp/crd/city/sigaiti/tobou/g7_1.html.The Promoting Group Relocation for Disaster Mitiga-tion implemented in disaster-affected area after the Great East Japan Earthquake[R/OL].Ministry of Land,Infrastructure,Transport and Tourism,Government of Japan,[2014-11-10].http://www.mlit.go.jp/crd/city/sigaiti/tobou/g7_1.html.(in Japanese)
    [13]土地区画整理事業[R/OL].日本国土交通省,[2014-11-10].http://www.mlit.go.jp/crd/city/sigaiti/shuhou/kukakuseiri/kukakuseiri01.htm.Land Readjustment Projects[R/OL].Ministry of Land,Infrastructure,Transport and Tourism,Government of Japan,[2014-11-10].http://www.mlit.go.jp/crd/city/sigaiti/shuhou/kukakuseiri/kukakuseiri01.htm.(in Japanese)
    [14]東日本大震災被災市町村に対する人的支援[N/OL].日本宮城県,[2014-11-10].http://www.pref.miyagi.jp/soshiki/sichouson/gyou2-gyou3.html.The assistance of human resource to the disaster-affected area after the Great East Japan Earthquake[N/OL].Miyagi Prefecture,Japan,[2014-11-10].http://www.pref.miyagi.jp/soshiki/sichouson/gyou2-gyou3.html.(in Japanese)
    [15]被災地の発注工事における入札不調の状況について[R/OL].日本国土交通省,[2014-11-10].http://www.reconstruction.go.jp/topics/20121202_03_siryou.pdf.Situation of the unsuccessful contracts of the post-disaster construction project in disaster-affected area[R/OL].Ministry of Land,Infrastructure,Transport and Tourism,Government of Japan,[2014-11-10].http://www.reconstruction.go.jp/topics/20121202_03_siryou.pdf.(in Japanese)

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心