装配式混凝土剪力墙结构空间模型抗震性能试验
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
对装配式混凝土剪力墙结构底部四层1/2比例空间模型进行了低周反复荷载试验。根据试验结果及试件原型静力弹塑性分析结果对比分析认为:装配式混凝土剪力墙结构抗震性能满足我国抗震设防要求,同时,由于填充墙效应及局部现浇带的有效约束,结构承载力及刚度得到提高,且有较大安全余度,可应用于实际工程;装配式混凝土剪力墙结构由于采用与剪力墙板整体预制的钢筋混凝土填充墙,设计时应充分考虑填充墙对主体结构强度和刚度的影响;装配式混凝土剪力墙结构弹性强度及刚度较现浇剪力墙结构有明显提高,但同时造成其在弹塑性阶段表现复杂,有必要建立其精细化弹塑性模型进行地震作用下的详细分析。
Low-cyclic reversed load testing was carried out on a 1/2-scale four-story spatial model of the bottom of a new precast concrete shear wall structure. The test results are compared with the push-over analysis results of the prototype model to determine the seismic performance of the specimen. The new precast concrete shear wall structure, which meets the requirements of the current Chinese seismic fortification code and possesses excessive bearing capacity due to the effects of non-structural walls and effective confinement of local cast-in-situ regions, can be safely applied to practical engineering. As concrete infill walls prefabricated together with precast shear wall panels were used, it is necessary to pay sufficient attention to the effects of non-structural walls on the strength and stiffness of the main structure when designing according to current Chinese standards. Furthermore, the strength and stiffness of new precast concrete shear wall structure have been enhanced within the elastic phase, which has made its performance in the elastic-plastic phase complicated. Therefore, it is strongly recommended to perform detailed seismic effect analysis on a refined elastic-plastic model for this precast concrete shear wall structure.
引文
[1]张军,侯海泉,董年才,等.全预制装配整体式剪力墙住宅结构设计及应用[J].施工技术,2009,38(5):22―24.Zhang Jun,Hou Haiquan,Dong Niancai,et al.Design and application of assembly integral shear wall resistance with prefabricated reinforced concrete[J].Construction Technology,2009,38(5):22―24.(in Chinese)
    [2]Khaled A,Soudki,Sami H,Rizkalla,Bill Le Blanc.Horizontal connections for precast concrete shear walls subjected to cyclic deformations part 1:Mild steel connections[J].PCI Journal,1995,40(4):78―96.
    [3]Khaled A Soudki,Jeffrey S West,Sami H Rizkalla,Bruce Blackett.Horizontal connections for precast concrete shear wall panels under cyclic shear loading[J].PCI Journal,1996,41(3):64―81.
    [4]Shen Q,Kurama Y.Lateral load behavior of unbonded post-tensioned hybrid coupled walls[C].Sixth ASCCS Conference on Steel and Concrete Composite Structures,Los Angeles,California,March 22-24,2000:793―800.
    [5]Kurama Y,Sause R,Pessiki S,et al.Seismic response evaluation of unbonded post-tensioned precast walls[J].ACI Structural Journal,2002,99(5):641―651.
    [6]Shen Q,Kurama Y,Nonlinear behavior of post-tensioned hybrid coupled wall subassemblages[J].Journal of Structural Engineering,American Society of Civil Engineers,2002,128(10):1290―1300.
    [7]Kurama Y,Shen Q.Post-tensioned hybrid coupled walls under lateral loads[J].Journal of Structural Engineering,American Society of Civil Engineers,2004,130(2):297―309.
    [8]Shen Q,Kurama Y,Weldon B.Seismic analysis,behavior,and design of unbonded post-tensioned hybrid coupled walls[D].Norte Dame,Indiana,University of Notre Dame,2004.
    [9]Kurama Y,Weldon B,Shen Q.Experimental evaluation of post-tensioned hybrid coupled wall subassemblages[J].Journal of Structural Engineering,2006,132(7):1017―1029.
    [10]Shen Q,Kurama Y,Weldon B.Seismic design and analytical modeling of post-tensioned hybrid coupled wall subassemblages[J].Structural Engineering,2006,132(7):1030―1040.
    [11]朱张峰,郭正兴.预制装配式剪力墙结构节点性能试验研究[J].土木工程学报,2012,45(1):69―76.Zhu Zhangfeng,Guo Zhengxing.Seismic test and analysis of joints of new precast concrete shear wall structures[J].China Civil Engineering Journal,2012,45(1):69―76.(in Chinese)
    [12]朱张峰,郭正兴.预制装配式剪力墙结构墙板节点性能研究[J].地震工程与工程振动,2011,31(1):35―40.Zhu Zhangfeng,Guo Zhengxing.Seismic performance research on wall-slab joints of new precast concrete shear wall structure[J].Journal of Earthquake Engineering and Engineering Vibration,2011,31(1):35―40.(in Chinese)
    [13]朱张峰,郭正兴.装配式短肢剪力墙平面模型抗震性能试验[J].哈尔滨工业大学学报,2012,44(4):94―99.Zhu Zhangfeng,Guo Zhengxing.Test research on seismic performance of plane model of new precast concrete short-limed shear wall[J].Journal of Harbin Institute of Technology,2012,44(4):94―99.(in Chinese)
    [14]朱张峰,郭正兴.装配式短肢剪力墙低周反复荷载试验[J].工程力学,2013,30(5):125―130.Zhu Zhangfeng,Guo Zhengxing.Low cyclic reversed load test on new precast concrete short leg shear wall[J].Engineering Mechanics,2013,30(5):125―130.(in Chinese)
    [15]GB 50009-2001,建筑结构荷载规范[S].北京:中国建筑工业出版社,2002.GB 50009-2001,Load code for the design of building structures[S].Beijing:China Architecture and Building Press,2002.(in Chinese)
    [16]GB 50011-2002,混凝土结构设计规范[S].北京:中国建筑工业出版社,2002.GB 50011-2002,Code for design of concrete structures[S].Beijing:China Architecture and Building Press,2002.(in Chinese)
    [17]GB 50011-2001,建筑抗震设计规范[S].北京:中国建筑工业出版社,2002.GB 50011-2001,Code for seismic design of buildings[S].Beijing:China Architecture and Building Press,2002.(in Chinese)
    [18]JGJ 3-2002,高层建筑混凝土结构技术规程[S].北京:中国建筑工业出版社,2002.JGJ 3-2002,Technical specification for concrete structures of tall building[S].Beijing:China Architecture and Building Press,2002.(in Chinese)

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心