一种提高重力坝抗震性能的方法
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
针对我国大坝多建于高烈度地震区、坝基中存在软弱结构面和缓倾角裂隙等现象,以某重力坝为研究对象,探讨了在大坝坝底铺设铅加球墨铸铁对坝体动力反应及动力深层抗滑稳定性的影响。计算结果表明,坝底铺设铅加球墨铸铁可有效降低坝体动力反应,提高重力坝动力深层抗滑稳定性,这为提高大坝抗震性能提供了一种新的途径。
Aimed at the phenomenon of China's dams mostly built on high intensity earthquake areas with weak structural surfaces and low-inclined cracks in the dam foundation,the influences of laying lead and nodular cast iron at the dam bottom on its dynamic responses and dynamic deep anti-slide stability were investigated by taking a gravity dam as an example.The results show that laying lead and nodular cast iron at the dam bottom can effectively reduce its dynamic responses and enhance its deep anti-slide stability.It may provide a new approach for raising the anti-seismic performance of gravity dams.
引文
[1]颜天佑,李同春,郑治,等.索风营水电站Dr2危岩体稳定安全度有限元分析[J].河海大学学报:自然科学版,2009,37(6):691-696.
    [2]陈松,陈志坚.软土地基上大型沉井基础安全监控模型[J].河海大学学报:自然科学版,2010,38(1):87-92.
    [3]周伟,常晓林,徐建强.基于分项系数法的重力坝深层抗滑稳定分析[J].岩土力学,2007,28(2):315-320.
    [4]王平,胡再强,田春亮,等.陶家沟尾矿坝三维静力和动力稳定性分析[J].水利与建筑工程学报,2010,8(1):53-55.
    [5]严祖文,杨建民.坝基地震液化特性及动力稳定性分析[J].世界地震工程,2008,24(3):140-145.
    [6]张晓燕,任旭华,邵勇.碾压混凝土重力坝陡峭建基面的动力稳定分析[J].红水河,2007,26(4):35-38.
    [7]李周顺,何江达,苏向震,等.某重力坝坝体动力结构特性及坝基动力稳定性分析[J].四川水利,2008,30(1):13-17.
    [8]周兵,金峰,王进廷.拱坝坝肩整体动力稳定性的离心模型试验[J].水利水电科技进展,2011,31(1):15-19.
    [9]姚文生,周志广,陈伟韦.鞍钢矿业公司大孤山尾矿坝动力稳定性分析[J].岩土工程界,2009,12(12):65-68.
    [10]胡婷,何力,韦先锋,等.亭子口上闸首结构静动力响应分析及深层抗滑稳定研究[J].灾害与防治工程,2010,68(1):33-37.
    [11]周星德,林小国.非线性基础隔离结构振动控制研究[J].东南大学学报:自然科学版,2007,37(6):1023-1026.
    [12]顾淦臣.土石坝地震工程[M].南京:河海大学出版社,1988.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心