重大工程设定地震方法研究进展
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
重大工程由于自身的重要性及其破坏的严重性,其设计地震动参数的确定不能再局限于经验统计,而应由专门的地震危险性分析来确定。重点分析地震动参数和衰减关系的选取、最大贡献潜源和震级、震中距的确定、不确定性分析等方面对设定地震的影响,指出了需要进一步研究的问题,并就地震动参数的合理选取、最大贡献潜源的确定等方面提出了几点建议。
The background and characteristic of the method of scenario earthquake for critical engineering project is introduced. A summary of status of researches in the scenario earthquake including the methods of weighted average and maximum probability is presented. The analysis for selecting seismic parameter and attenuation law, determining on the dominate potential earthquake sources and the magnitude and epicentral distance, uncertainty was made. Some problems which need further investigation and advice are suggested.
引文
[1]陈厚群,郭明珠.重大工程场地设计地震动参数选择[G].中国水利水电科学研究院学术交流会议,北京,2002.
    [2]Mcguire,R.K..ProbabilisticSeismicHazardAnalysisandDesignEarthquake[J].ClosingtheLoop,Bull.Seism.Soc.Am.,1995,85(5):1275-1284.
    [3]Ishikawa,Y.andH.Kameda.ProbabilityBasedDeterminationofSpecificScenarioEarthquake[J].Proc.4thInternationalConferenceonSeismicZonation,1991,23-10.
    [4]高孟潭.潜在震源区期望震级和期望距离及其计算方法[J].地震学报,1994,16(3):346-351.
    [5]韩竹君.设定地震方法研究:[学位论文][D].北京:中国地震局地质研究所,1997.
    [6]罗奇峰.概率一致设定地震及其估计方法[J].地震工程与工程振动,1996,16(3):22-28.
    [7]Chapman,M.C..AProbabilisticApproachtoGround-MotionSelectionforEngineeringDesign[J].Bull.Seism.Soc.Am.,1995,85(3):937-942.
    [8]崔江余,杜修力.重大工程设定地震动确定[J].世界地震工程,2000,12.
    [9]李山有.重大工程结构的设计地震输入:[学位论文][D].北京:中国地震局工程力学研究所,2000.
    [10]易立新.设定地震方法及工程应用和水库诱发地震危险性评价方法研究[R].北京:中国水利水电科学研究院,2003,6.
    [11]沈建文,蔡长青.概率一致的期望地震和概率一致的保守地震[J].地震学报,1998,11.
    [12]胡聿贤.地震工程[qM].河北:河北教育出版社,2000.