汶川地震中紫坪铺面板堆石坝永久应变反演分析
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
紫坪铺大坝是世界上第一个遭受强震的百米以上面板堆石坝,在"5.12"汶川地震中有明显的局部损伤。采用有限元数据平滑方法,对大坝位移监测数据进行处理,得到了坝体典型剖面的永久应变。分析了大坝在地震中沉降和堆石料剪胀变形发生的部位和原因,表明坝体最大震陷率发生在2/3坝高附近;大坝发生剪胀的范围为坝顶区域和从坝顶往下25~30 m的上下游坝坡附近;永久剪应变过大是造成面板水平施工缝错台的直接原因。
Zipingpu Concrete-Faced Rockfill Dam,which was subjected to significant local damage during "5.12" Wenchuan Earthquake,which is the first concrete-faced rockfill dam of more than one hundred meters in height encountering strong earthquake in the world.Based on the finite element data smoothing method,the permanent strain at a typical cross-section of the dam is obtained by processing the monitored displacement data.The positions of the dam settlement and rockfill dilatancy and the causes are analyzed according to the section permanent strain.The results show that the maximum settlement ratio of the dam approximately occurs at 2/3 of the dam height.The dilatancy occurs from the dam crest to 25~30 m in the upstream and downstream slope.The excessive permanent shear strain during the earthquake is the immediate cause for dislocation of the horizontal construction joints in the face slabs.
引文
[1]陈生水,霍家平,章为民.“5.12”汶川地震对紫坪铺混凝土面板坝的影响及原因分析[J].岩土工程学报,2008,30 (6):795–801.(CHEN Sheng-shui,HUO Jia-ping,ZHANG Wei-min.Influence and reason analysis of“5.12”Wenchuan earthquake on Zipingpu dam[J].Chinese Journal of Geotechnical Engineering,2008,30(6):795–801.(in Chinese))
    [2]陈生水,方绪顺,钱亚俊.高土石坝地震安全评价及抗震设计思考[J].水利水运工程学报,2011(1):17–21.(CHEN Sheng-shui,FANG Xu-shun,QIAN Ya-jun.Thoughts on safety assessment and earthquake-resistance for high earth-rock dams[J].Hydro-science and Engineering,2011(1):17–21.(in Chinese))
    [3]宋胜武,蔡德文.汶川大地震紫坪铺混凝土面板堆石坝震害现象与变形监测分析[J].岩石力学与工程学报,2009,28(4):840–849.(SONG Sheng-wu,CAI De-wen.Earthquake damage phenomena and deformation monitoring analysis for concrete faced rockfill dam at Zipingpu project during Wenchun earthquake[J].Journal of Rock Mechanics and Engineering,2009,28(4):840–849.(in Chinese))
    [4]关志诚,宋彦刚,蔡德文.紫坪铺高面板坝“5.12”震害调查与安全状态评价[J].水利水电技术,2008,39(9):36–43.(GUAN Zhi-cheng,SONG Yan-gang,CAI De-wen.Investigation and safety evaluation of Zipingpu high dam after 5.12 earthquake hazard[J].Water Resources and Hydropower Engineering Technology,2008,39(9):36–43.(in Chinese))
    [5]关志诚.紫坪铺水利枢纽工程5.12震害调查与安全状态评述[J].中国科学(E辑:技术科学),2009,39(7):1291–1303.(GUAN Zhi-cheng.The earthquake damage survey and thesafety statement review of Zipingpu dam during 5.12earthquake[J].Science in China(Series E:Technological Sciences),2009,39(7):1291–1303.(in Chinese))
    [6]GUAN Zhi-cheng.Investigation of the 5.12 Wenchuan Earthquake damages to the Zipingpu Water Control Project and an assessment of its safety state[J].Sci China Ser E-Tech Sci,2009,52(4):820–834.
    [7]孔宪京,邹德高,周扬,等.汶川地震中紫坪铺混凝土面板堆石坝震害分析[J].大连理工大学学报,2009,49(5):668–674.(KONG Xian-jing,ZOU De-gao,ZHOU Yang,et al.Earthquake damage analysis of Zipingpu concrete face rock-fill dam during Wenchuan earthquake[J].Journal of Dalian University of Technology,2009,49(5):667–674.(in Chinese)).
    [8]赵剑明,刘小生,温彦锋,等.紫坪铺大坝汶川地震震害分析及高土石坝抗震减灾研究设想[J].水力发电,2009,35(5):11–14.(ZHAO Jian-ming,LIU Xiao-sheng,WENYan-feng,et al.Analysis of earthquake damage of the Zipingpu Dam in Wenchuan Earthquake and the study proposal on the anti-earthquake and disaster reduction of high earth-rock dam[J].Water Power,2009,35(5):11–14.(in Chinese)).
    [9]赵剑明,周国斌,关志诚,等.紫坪铺“5.12”震害对面板堆石坝抗震措施的若干启示[J].水电能源科学,2012,30(1):24–27.(ZHAO Jian-ming,ZHOU Guo-bin,GUAN Zhi-cheng,et al.Inspirations for 5.12 seismic damage of Zipingpu dam for aseimic measures of CFRD[J].Water Resources and Power,2012,30(1):24–27.(in Chinese))
    [10]杨泽艳,张建民,高希章.汶川地震中紫坪铺面板坝抗震特性初步分析[J].水力发电,2009,35(7):30–33.(YANG Ze-yan,ZHANG Jian-min,GAO Xi-zhang.A primary analysis of seismic behavior and damage for Zipingpu CFRD during Wenchuan earthquake[J].Water Power,2009,35(7):30–33.(in Chinese))
    [11]WIELAND M.Conerete face rockflll dams in highly seismic regions[M]//JIA Jin-sheng.Modern Rockfill Dams-2009.Beijing:China Water Power Press,2009:791–799.
    [12]朱晟,杨鸽,周建平,等.“5·12”汶川地震紫坪铺面板堆石坝静动力初步反演研究[J].四川大学学报(工程科学版),2010,42(9):113–119.(ZHU Sheng,YANG Ge,ZHOU Jian-ping,et al.Back analysis on static and dynamic characteristics of Zipingpu CFRD under“5·12”Wenchuan Earthquake[J].Journal of Sichuan University(Engineering Science Edition),2010,42(9):113–119.(in Chinese))
    [13]孔宪京,周扬,邹德高,等.汶川地震余震记录及紫坪铺面板堆石坝余震反应研究[J].岩土工程学报,2011,33(5):673–678.(KONG Xian-jing,ZHOU Yang,ZOU De-gao,et al.Aftershock records of Wenchuan Earthquake and seismic response of Zipingpu Concrete Face Rock-fill Dam[J].Chinese Journal of Geotechnical Engineering,2011,33(5):673–678.(in Chinese))
    [14]赵剑明,刘小生,刘启旺,等.先期震动对土石坝地震永久变形的影响研究[J].世界地震工程,2011,27(1):28–33.(ZHAO Jian-ming,LIU Xiao-sheng,LIU Qi-wang,et al.Study on the effect of pre-vibration on earthquake-induced permanent deformation of an earth-rock fill dam[J].World Earthquake Engineering,2011,27(1):28–33.(in Chinese))
    [15]赵剑明,贾金生,李洪,等.考虑前期震动影响的紫坪铺面板坝震后抗震安全评价[J].水力发电学报,2012,31(1):82–87.(ZHAO Jian-ming,JIA Jin-sheng,LI Hong,et al.Assessment of the post-earthquake safety of Zipingpu CFRD considering pre-vibration effect[J].Journal of Hydroelectric Engineering,2012,31(1):82–87.(in Chinese))
    [16]孔宪京,刘福海,刘君.地震作用下面板堆石坝面板错台模型试验研究[J].岩土工程学报,2012,34(2):258–267.(KONG Xian-jing,LIU Fu-hai,LIU Jun.Shaking table model tests on face-slab dislocation of concrete faced rock-fill dams under earthquakes[J].Chinese Journal of Geotechnical Engineering,2012,34(2):258–267.(in Chinese))
    [17]章为民,陈生水.紫坪铺面板堆石坝汶川地震永久变形实测结果分析[J].水力发电,2010,36(8):51–53.(ZHANG Wei-min,CHEN Sheng-shui.Analysis on permanent deformation monitoring data of Zipingpu concrete faced rockfill dam after Wenchuan earthquake[J].Water Power,2010,36(8):51–53.(in Chinese))
    [18]潘兵,谢惠民.数字图像相关中基于位移场局部最小二乘拟合的全场应变测量[J].光学学报,2007,27(11):1980–1986.(PAN Bing,XIE Hui-min.Full-field strain measurement based on least-square fitting of local displacement for digital image correlation method[J].Acta Optica Sinica,2007,27(11):1980–1986.(in Chinese))
    [19]PAN Bing,XIE Hui-min GUO Zhi-qing,et al.Full-field strain measurement using a two dimensional Savitzky-Golay digital differentiator in digital image correlation[J].Optical Engineering,2007,46(3):1–10.
    [20]SEGALMAN D J,WOYAK D B,ROWLANDS R E.Smooth spline-like finite-element differentiation of full-field experimental data over arbitrary geometry[J].Experimental Mechenics,1979,19(12):429–437.
    [21]GOLUB G H,HEATH M.WAHBA G.Generalized cross validation as a method for choosing a good ridge parameter[J].Technometrics,1979,21(2):215–223.
    [22]CRAVEN P,WAHBA G.Smoothing noisy data with spline functions:estimating the correct degree of smoothing by the method of generalized cross-validation[J].Numerische Mathematik,1979,31:377–403.
    [23]BATES D M,LINDSTROM M J,WAHBA G,et al.GCVPAK-routines for generalized cross validation[J].Communications in Statistics-Simulation and Computation,1987,16(1):263–297.
    [24]KENT J T,MOHAMMADZADEH M.Global optimization of the generalized cross-validation criterion[J].Statistics and Computing,2000,10:231–236.
    [25]刘小生,王钟宁,汪小刚,等.面板坝大型振动台模型试验与动力分析[M].北京:中国水利水电出版社,知识产权出版社,2005.(LIU Xiao-sheng,WANG Zhong-ning,WANG Xiao-gang,et al.Advancement of technology on shaking table model test and dynamic analysis of CFRD[M].Beijing:China Water Power Press,Intellectual Property Press,2005.(in Chinese))
    [26]顾淦臣,沈长松,岑威钧.土石坝地震工程[M].北京:中国水利水电出版社,2009.(GU Gan-chen,SHEN Chang-song,CEN Wei-jun.Earthquake engineering for earth-rock dams[M].Beijing:China Water Power Press,2009.(in Chinese))
    [27]中国水电工程顾问集团成都勘测设计研究院.四川省岷江紫坪铺水利枢纽混凝土面板堆石坝工程监测简报—5.12汶川8.0级地震[R].成都:中国水电工程顾问集团成都勘测设计研究院,2008.(Chengdu Hydroelectric Investigation and Design Institute,China Hydropower Engineering Consulting Group Corporation.Briefing for monitoring of CFRD dam at Zipingpu water resources project on Minjing River—Earthquake occurred on May 12,2008 in Wenchuan[R].Chengdu:Chengdu Hydroelectric Investigation and Design Institute,China Hydropower Engineering Consulting Group Corporation,2008.(in Chinese))
    [28]周国斌,赵剑明,温彦锋,等.紫坪铺混凝土面板堆石坝地震剪胀特性探讨[J].水电能源科学,2012,30(10):76–79.(ZHOU Guo-bin,ZHAO Jian-ming,WEN Yan-feng,et al.Study on seismic shear dilatanly of Zipingpu CFRD[J].Water Resource and Power,2012,30(10):76–79.(in Chinese))

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心