铁路系统地震破坏损失比研究
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
损失比是震害损失评估中一个至关重要的参数,它的取值是损失评估工作中一个十分重要的环节。尤其是大震时,大范围的房屋或各类工程结构遭到破坏,损失比取值微小的变化就会引起总损失值有较大的变动。因此,能够合理地给出损失比的取值范围对震害损失评估工作具有重要意义。针对铁路系统各组成部分的结构特点,采用适当的方法分别给出了铁路线路、挡土墙、梁式桥、拱桥、隧道、供电及通信电线路、机械设备和附属房屋建筑的损失比建议值范围,并与现行的国家标准进行了对比分析。
How to determine the value of loss ratio,which is a crucial parameter for earthquake loss assessment,is an important work in earthquake disaster loss assessment on site. Especially after large earthquakes,many kinds of engineering structures are damaged on a large-scale,so a tiny change of loss ratio will cause a big change of total loss. Therefore,it is of great significance for earthquake disaster loss assessment to give the value range of loss ratio reasonably. Aiming at the structural characteristics of each component of railway system,the appropriate methods are used to determine the proposed scope of loss ratio values of railway lines,retaining walls,girder bridges,arch bridges, tunnels, power supply and communication lines, mechanical equipments and ancillary buildings respectively. Finally,the proposed loss ratio values are compared with those of the existing national standards.
引文
[1]国家标准.地震现场工作第4部分:灾害直接损失评估(GB/T18208.3-2011)[S].北京:中国标准出版社,2012,3.GB/T 18208.4-2011 Post-earthquake Field Works-Part4:Assessment of Direct Loss[S].Beijing:China Standards Press,2011.(in Chinese)
    [2]林庆利.铁路系统震害损失评估方法研究[D].哈尔滨:中国地震局工程力学研究所,2013.LIN Qingli.Study on the Seismic Damage Loss Assessment of Railway System[D].Harbin:Institute of Engineering Mechanics,2013.(in Chinese)
    [3]应用技术委员会[美].加利福尼亚未来地震的损失估计[M].北京:地震出版社,1991:1-17.
    [4]陈洪富,孙柏涛,孙得璋.地震经济损失评估之装修破坏损失比厘定研究[J].震灾防御技术,2010,5(2):248-256.CHEN Hongfu,SUN Baitao,SUN Dezhang.Determination of building decoration loss ratio to earthquake loss assessment[J].Technology of earthquake disaster prevention,2010,5(2):248-256.(in Chinese)
    [5]高霖.供水系统水池震害损失评估[D].哈尔滨:中国地震局工程力学研所,2012.GAO Lin.Study on Evaluation of Earthquake Damage and Loss for Pools in Water Supply System[D].Harbin:Institute of Engineering Mechanics,2012.(in Chinese)
    [6]向群,贾艳红.铁路工程施工组织管理与概预算[M].北京:中国铁道出版社,2007,6:231-250.
    [7]樊原子,郭健.铁路工程概预算[M].北京:人民交通出版社,2013,3:146-152.
    [8]蒙云.桥梁加固与改造[M].重庆:重庆大学出版社,1989.
    [9]中华人民共和国国家标准.生命线工程地震破坏等级划分(GB/T24336-2009)[S].北京:中国标准出版社,2009.GB/T 24336-2009.Classification of Earthquake Damage to Lifeline Engineering[S].Beijing:China Standards Press,2009.(in Chinese)
    [10]铁道部文件.铁运[2008]96号[R].铁路路基大维修规则,2008.
    [11]铁道部文件.铁运[2006]146号[R].铁路线路修理规则,2006.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心