引文
[1]唐必锐,覃发兰,黄花香,等.四川东部高陡构造时深转换方法研究[J].天然气工业,2005,25(8):41~43.Tang B R,Qin F L,Huang H X,et al.Research on time-depth conversion method of the high-steep structures in eastSiChuan[J].Natural Gas Industry,2005,25(8):41~43.
[2]杨智仁.四川东部高陡构造的归位处理研究[J].石油地球物理勘探,1991,30(4):1~11.Yang Z R.Research on Seismic data migration method of thehigh-steep structures in east SiChuan[J].Oil GesphysicalProspecting,1991,30(4):1~11.
[3]梁顺军,梁顺彬.高陡背斜地震剖面高点偏离问题分析及其校正[J].石油地球物理勘探,2001,36(1):105~114.Liang S J,Liang S B.Analysis of height departure and its cor-rection in seismic section with high dipping anticline[J].OilGeophysical Prospecting,2001,36(1):105~114.
[4]陆基孟.地震勘探原理[M].东营:石油大学出版社,1993.Lu J M.Principle of Seismic Prospecting[M].DongYing:China University of Petroleum Press.1993.
[5]何敏,朱明,汪瑞良,等.白云深水崎岖海底区时深转换方法探讨[J].地球物理学进展,2007,22(03):966~972.He M,Zhu M,Wang R L,et al.The discussion of time-depthconversion methods in the baiyun deepwater rough seafloor ar-ea[J].Progress in Geophysics,2007,22(03):966~972.
[6]张华军,肖富森,刘定锦,等.地质构造约束层速度模型在时深转换中的应用[J].石油物探,2003,42(4):521~525.Zhang H J,Xiao F S,Liu D J,et al.Geologic structure con-strained interval velocity model and its application in time-depth conversion[J].Geophysical Prospecting for Petroleum,2003,42(4):521~525.
[7]梁顺军,彭更新,齐英敏,等.山地复杂构造地震成图方法探讨[J].石油物探,2003,42(4):529~537.Liang S J,Peng G X,Qi Y M,et al.Seismic mapping of com-plex structures in mountainous areas[J].Geophysical Prospec-ting for Petroleum,2003,42(4):529~537.
[8]Hardage B A,Simmons J L,Pendleton V M,et al.3-D seis-mic imaging and interpretation of Brushy Canyon slope and ba-sin thin-bed reservoirs,northwest Delaware Basin[J].Geo-physics,1998,63(5):1507~1519.
[9]Wang F P,Dai J C.Charles Kerans.Modeling dolomitizedcarbonate-ramp reservoirs:A case study of the Seminole SanAndres unit-Part 2,Seismic modeling,reservoir geostatistics,and reservoir simulation[J].Geophysics,1998,63(6):1876~1884.
[10]Hoffman K S,Neave J W.Horizon modeling using a three-dimensional fault restoration technique,68thAnn[J].Inter-nat.Mtg.:Soc Of Expl.Geophys.,1998,2090~2090.
[11]Chambers K T,DeBaun D R,Durlofsky L J,Taggart L J,Bernath A,Shen A Y,Legarre H A,Goggin D J.Geologicmodeling,upscaling and simulation of faulted reservoirs usingfaulted stratigraphic grids,SPE 51889.Society of PetroleumEngineers Reservoir Simulaion Symposium,Houston,1999.
[12]温声明,杨德兴,王贵重,等.层速度替换建场法在高陡构造区的应用[J].石油地球物理勘探,2006,41(3):308~312.Wen S M,Yang D X,Wang G Z.Application of interval-ve-locity-replaced field-building method in high-steep structuralregion[J].Oil Geophysical Prospecting,2006,41(3):308~312.
[13]邵雨,李学义,孔智勇,等.模型速度建场方法的应用研究[J].石油地球物理勘探,2003,38(6):675~679.Shao Y,Li X Y,Kong Z Y,et al.Study on application ofvelocity field model-building method[J].Oil GeophysicalProspecting,2003,38(6):675~679.
[14]陈业全,刘春晓,王道义.塔里木盆地中原探区速度场研究方法[J].地球物理学进展,2004,19(3):656~662.Chen Y Q,Liu C X,Wang D Y.The research method of ve-locity field in central plains prospect area of tarim basin[J].Progress in Geophysics,2004,19(3):656~662.
[15]滕佃波,汪鹏程,王赟,姚振兴.利用叠前Kirchhoff积分偏移识别小断裂与低幅度构造[J].地球物理学进展,2005,20(4):1035~1038.Teng X B,Wang P C,Wang Y,et al.The identification ofsmall faults and low-amplitude structures by utilizing prestackKirchhoff integral migration[J].Progress in Geophysics,2005,20(4):1035~1038.
[16]梁顺军,谢会文,皮学军,等.高陡构造地震勘探圈闭要素畸变分析[J],石油物探,2001,40(4):34~42.Liang S J,Xie H W,Pi X J,et al.Analysis of trap factordistortions in seismic survey in areas with steep dip structures[J].Geophysical Prospecting of Petroleum,2001,40(4):34~42.
[17]张华军,王海兰,肖富森,等.基于反射层的变层速度模型时深转换方法[J].天然气工业,2003,23(1):36~38.Zhang H J,Wang H L,Xiao F S,et al.Time-depth Conver-sion Method in View Variable Interval Velocity Model of Re-flection Horizon[J].Natural Gas Industry,2003,23(1):36~38