震损建筑顶撑法仿真研究
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
归纳总结汶川地震的典型受损建筑特征及采用的救援技术。应用ANSYS有限元方法计算施加顶撑荷载前、后震损建筑在地震荷载作用下的反应,数值模拟顶撑位移作用下的受损建筑。分析结果表明:施加顶撑后结构的抗连续倒塌能力显著提高;顶撑距离过大,可能拉断构件或发生剪切破坏,故顶撑位移应为可进行救援的最小位移。
The character of earthquake damaged structure and typical rescue technique in Wenchuan earthquake were summarized.Using ANSYS finite element analysis,seismic response of damaged models was analysed and the shoring displacement was numerically simulated.The results showed that shoring method can improve the progressive collapse behavior greatly;when the shoring displacement is too big,the member may be pulled off,or have shear stress damage,so the shoring displacement should be the minimum distance for rescuing.
引文
[1]刘相新,孟宪颐.ANSYS基础与应用教程[M].北京:科学出版社,2006.
    [2]高柏峰,李慧剑,苏丽芸.基于动力响应信息分区截断的塔式结构多损伤识别方法[J].中北大学学报:自然科学版,2009,30(2):179-183.
    [3]高柏峰,李慧剑,刘艳霞.格构式塔结构刚度突变处损伤识别方法[J].应用基础与工程科学学报,2009,17(2):309-317.
    [4]张雷明,刘西拉.钢筋混凝土结构倒塌分析的前沿研究[J].地震工程与工程振动,2003,23(3),47-52.
    [5]陆新征,林旭川,叶列平.地震下高层建筑连续倒塌数值模型研究[J].工程力学,2010,27(11):64-70.
    [6]宣纲,顾祥林,吕西林.强震作用下混凝土框架结构倒塌过程的数值分析[J].地震工程与工程振动,2003,23(6):24-30.
    [7]秦东,范立础.钢筋混凝土结构倒塌全过程数值模拟[J].同济大学学报,2001,29(1):80-83.
    [8]江见鲸,陆新征,叶列平.混凝土结构有限元分析[M].北京:清华大学出版社,2005.
    [9]Kaewkulchai G,Williamson E B.Beam element formulation and solution procedure for dynamic progressive collapse analysis[J].Computers&Structures,2004,82:639-651.
    [10]Lynn K M,Isobe D.Structural collapse analysis of framed struc-tures under impact loads using ASI-Gauss finite element method[J].International Journal of Impact Engineer,2007,34(9):1500-1516.
    [11]Isobe D,Tsuda M.Seismic collapse analysis of reinforced concrete framed structures using the finite element method[J].Earthquake Engineering and Structural Dynamics,2003,32(13):2027-2046.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心