成都地铁运行对成都台电磁观测的影响
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
成都地铁2号线建成后随即运营,由于成都地震台距离地铁线路的垂直距离约为25 km,了解地铁运行产生的电磁场对成都台电磁观测可能造成的影响或干扰是有意义的。根据地铁运行时间和地磁地电观测数据的对比,分析了电磁观测数据受地铁干扰的情况,从观测数据时间序列上分析地磁干扰,发现观测数据的变化与地铁交通每天的运营时间存在明显的对应关系,且对于布极方位与轨道方向一致的测道,所记录的数据受到地铁的影响最大。这些结果有助于对地磁观测资料的认识和分析,以便提取与地震有关的地磁前兆信息。
After the Chengdu metro line 2 is completed,the Chengdu metro began its operation. The distance from Chengdu Seismic Standard Station to the subway line is about 25 km. The subway system operation affects the electromagnetic observation environment of Chengdu Seismic Standard Station. In this paper,according to the metro operation schedule,we think that the electromagnetic observation data,especially the electromagnetic observation line paralleled with the subway line,are affected by the electromagnetic disturbance caused by the Chengdu Subway system. The analysis will contribute to our understanding of the observation data in order to extract the information related to earthquake precursor.
引文
[1]张安徽,杜学斌,元丽华,等.HHT方法在受城市轨道交通干扰地电场观测数据中的应用[J].地震学报,2011,33(2).
    [2]谢凡,滕云田,等.天津轨道交通对地磁观测干扰的影响研究[J].地震学报,2011,35(2).
    [3]李伟,孙春仙,王锋,等.南京地震台地电阻率异常变化分析[J].地震地磁观测与研究,2006,28(3).
    [4]席继楼,赵家骝,等.地电场观测技术研究[J].地震,2002,22(4).

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心