玉树7.1级地震地质灾害发展趋势分析
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
在参与玉树7.1级地震震区地质灾害应急调查、汛期隐患排查的基础上,收集、整理前人调查与研究的成果数据,分析了震后玉树震区的地质灾害发育特征,并进一步研究了震后玉树灾区地质灾害可能的持续时间、演化趋势以及高风险区的分布区域。结果表明,震后玉树灾区地质灾害将持续10年左右,并以周期震荡式的衰减下降,最终恢复到震前水平;震后地质灾害高风险区将分布在巴塘河谷、结古镇周边山区与郭央烟宋多附近。
Based on field investigation,collection and statistics of data pre-and post-earthquake,the development characteristics of geo-hazards post-earthquake are analyzed.And then,duration,development tendency and high risk distribution areas of the geo-hazards post-earthquake are analyzed.It proved that the active duration of the geo-hazards post-earthquake will be 10a,which decline periodically and wavily to the active level of geo-hazards pre-earthquake;the high risk areas are located in valley of Batang river,the northern and southern mountains around the Jiegu town and the area near the Guoyangyansongduo village.
引文
[1]Nakamura H,T suchiya S,Inoue K,et al.Sabo against Earthquakes[C]//Kokon Shoin.Tokyo,Japan,2000:190-220.
    [2]Inoue K.The Kan to Earthquake(1923)and sediment disasters[J].The Earth Monthly,2001,23:147-154.
    [3]KoiT,Hotta N,Ishigak i N,et al.Prolonged impact of earthquake-induced landslides on sediment yield in a mountain watershed:the Tanzawa region,Japan[J].Geomorphology,2008,101:692-702.
    [4]林冠慧,张长义.巨大灾害后的脆弱性:台湾集集地震后中部地区土地利用与覆盖变迁[J].地球科学进展,2006,21(2):201-210.
    [5]Lin C W,Liu S H,Chang W S,et al.The impact of the Chi-Chi earthquake on the subsequent rain fall induced landslides in the epicentral area of central Taiwan[C]//Proceeding of international conference in commemoration of 10th anniversary of the Chi-Chi earthquake.NTUH,2009:336-338.
    [6]Lin C W,Liu S H,Lee S Y,et al.Impacts on the Chi-Chi earthquake on subsequent rain-induced landslides in central Taiwan[J].Engineering Geology,2006,86(2/3):87-101.
    [7]殷跃平,潘桂棠,刘宇平,等.汶川地震地质与滑坡灾害概论[M].北京:地质出版社,2009.
    [8]Huang R Q,Li W L.Development and Distribution of geohazards Triggered by 5#12 Wenchuan Earthquake in China[J].Science in China(Series E)-Technological Sciences,2009,52(4):810-819.
    [9]甘建军,孙海燕,黄润秋,等.汶川县映秀镇红椿沟特大型泥石流形成机制及堵江机理研究[J].灾害学,2012,27(1):5-9.
    [10]黄润秋,唐川,李勇,等.汶川地震地质灾害研究[M].北京:科学出版社,2009.
    [11]苏生瑞,李松,郝莉莉,等.汶川地震中小鱼洞大桥的变形破坏特征与机理[J].灾害学,2011,26(4):19-23.
    [12]黄润秋.汶川地震地质灾害后效应分析[J].工程地质学报,2011,19(2):145-151.
    [13]殷跃平,张永双,马寅生,等.青海玉树Ms7.1级地震地质灾害主要特征[J].工程地质学报,2010,18(3):289-296.
    [14]张永双,马寅生,胡道功,等.玉树地震地表破裂调查与灾后重建避让选址研究[J].地质学报,2010,84(5):593-605.
    [15]许冲,徐锡伟,戴福初,等.2010年4月14日玉树地震滑坡空间分布与控制变量分析[J].工程地质学报,2011,19(4):505-510.
    [16]郭小花,李小林,赵振,等.青海4·14玉树地震地质作用对地质环境影响分析[J].工程地质学报,2011,19(5):685-696.
    [17]都昌庭,李文巧,卢宁,等.2006年青海玉树地震类型和发震构造分析[J].西北地震学报,2007,29(3):271-274.
    [18]赵家绪,李玉军,张力征,等.青海玉树“4·14”地震灾区地质灾害应急排查报告[R].西宁:青海省国土资源厅,2010.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心