地震勘探技术在裴沟矿31采区的应用
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
在山区地震勘探中,由于复杂多变的岩性及地表的剧烈起伏影响地震成像的品质,本文以裴沟矿井31采区为例,首先在数据采集阶段针对不同地表条件采用不同设备成孔,保证原始数据质量;其次在资料处理阶段通过"两步"静校正方法解决山区高程及岩性变化引起的成像问题,获得高质量的处理成果。经过矿井生产的初步验证可知,所采用的技术手段正确,所取得的地质成果精度较高。
The quality of seismic imaging is great affected by the complex lithology and salient relief surface of the mountainous area.This paper takes the Peigou coal mine 31 mining area as a study example.Firstly,different equipment for boring hole in the data acquisition stage under different surface conditions is adopted to ensure the quality of the original data.Secondly,a"two step"static correction method is used to solve the imaging problem in the stage of processing data that causing by the change of altitude and lithology.Through the above measures,high quality results are obtained.Preliminary validation of the mine production shows that the method is correct,and its accuracy is good.
引文
[1]宋建国,纪聪智,刘田田.复杂近地表地震波波场特征分析[C]//刘元生.山东地球物理六十年.北京:中国海洋大学出版社,2010.
    [2]熊翥.复杂山区地震数据处理思路[M].北京:石油工业出版社,2002.
    [3]俞寿明.高分辨率地震勘探[M].北京:石油工业出版社,1994.
    [4]温建绪.小面元三维地震勘探技术在西山屯兰矿南五采区的应用[J].中国煤田地质,2008,20(6):77-79.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心