关键路径法在地震监测设施建设定额编制中的应用
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
从项目管理角度出发,介绍关键路径法在项目管理中应用的基本原则和方法,并在《地震监测设施建设标准定额体系研究》项目管理中实际应用,不仅在计划制定期间求得工期、资源、成本的优化,而且在计划的执行过程中,通过信息反馈,进行有效的监督、控制和调整,保证项目在预定期望中的目标实现,通过识别并严格执行关键路径,提高项目管理的效率,压缩项目实施进度。
From the project management point of view,the application of project management principles and methods of the critical path method(CPM) is introduced.Furthermore,the method is used practically in the project management of Seismological Monitoring Facilities Construction Standard Quota System Research.Not only obtains the optimization of project duration-resources and cost during the planning stage,but also ensures the implementation of expected goal of the project through the feedback and effective monitoring,controlling and adjustment during the executing stage.Through recognizing and implementing the key critical path strictly,it is achievable to improve the effect of project management and reduce the schedule of project.
引文
李建峰.工程定额原理[M].北京:人民交通出版社,2008:6-13.
    孙建中,杨文东,李登恒,等.地震监测设施建设定额标准体系分析研究[J].世界地震工程,2011:27(2):190-195.
    王美珍.网络计划技术在项目管理中的应用[J].石油化工技术经济,2004:20(2):26-30.
    杰克·吉多,克莱门斯著,张金成等译.成功的项目管理[M].北京:机械工业出版社,1990:227-340.
    科兹纳.项目管理:计划、进度和控制的系统方法[M].北京:电子工业出版社,2002:530-563.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心