中国大陆地区一般建设工程抗地震倒塌风险研究
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
利用ATC-63项目关于一般建设工程抗倒塌能力的不确定性推荐成果,考虑我国地震环境的差异,采用风险积分的方法在不同形状超越概率曲线的基础上耦合了结构倒塌能力的不确定性,获得了中国大陆地区对应于罕遇地震水平(50年超越概率2%)峰值加速度的倒塌概率、50年倒塌概率1%所对应的峰值加速度以及50年倒塌概率1%所对应的峰值加速度与罕遇地震水平峰值加速度的比值(文中称"风险系数")。研究认为中国大陆地区罕遇地震水平的峰值加速度大致相当于50年倒塌概率1%所对应的峰值加速度,中国大陆地区风险系数绝大部分集中在0.8~1.2之间,为了满足中国大陆地区一般建设工程具有一致的抗倒塌能力,建议利用风险系数图对罕遇地震水平的峰值加速度进行调整。我国东南沿海部分人口稠密、经济发达地区,其罕遇地震水平峰值加速度对应的50年倒塌概率为2%~5%,明显高于其他地区,应该引起足够重视。
Considering the difference of seismic environment in China,based on collapse resistant capacity uncertainty recommended by ATC-63 project,collapse probability of peak ground acceleration corresponding to rare ground motion( 50-year 2% probability of exceedance),peak ground acceleration for 50-year 1% probability of collapse and ratio( risk factor) of peak ground acceleration for 50-year 1% probability of collapse to peak ground acceleration for rare ground motion were acquired using risk integration,in which the probability distribution for the collapse resistant capacity was coupled with corresponding ground motion hazard curve for the location of the structure. Research and analysis show that peak ground acceleration for rare ground motion is roughly equivalent to peak ground acceleration for50-year 1% probability of collapse in China,and the risk factor of most parts of China is between 0. 8 and 1. 2. In order that nationwide general construction projects have consistent ability of collapse resistance, risk factor is recommended to adjust peak ground acceleration for rare ground motion. Collapse probability of peak ground acceleration corresponding to rare ground motion in some coastal areas of southeast China,which is the densely populated and economically developed areas,is about 2% ~ 5% in 50-year,and is significantly higher than that in other regions,which should be paid enough attention.
引文
[1]蔺明河,谢定义,吴先维.中国地震灾害的严峻性及其相应对策[J].西北水力发电,2006,22(3):83-86.(LIN Minghe,XIE Dingyi,WU Xianwei.The serious earthquake situation of China and its countermeasures[J].Journal of Northwest Hydroelectric Power,2006,22(3):83-86.(in Chinese))
    [2]陈顒,彭文涛,徐文立.21世纪地震灾害的一些新特点[J].地球科学进展,2004,19(3):359-363.(CHEN Yong,PENG Wentao,XU Wenli.New feature of earthquake disaster in 21st century[J].Advance in Earth Sciences,2004,19(3):359-363.(in Chinese))
    [3]高孟潭,卢寿德.关于下一代区划图编制原则与关键技术的初步探讨[J].震灾防御技术,2006,1(1):1-6.(GAO Mengtan,LU Shoude.The discussion on principles of seismic zonation of the next generation[J].Technology for Earthquake Disaster Prevention,2006,1(1):1-6.(in Chinese))
    [4]王亚勇,高孟潭,叶列平,等.基于大震和特大震下倒塌率目标的建筑抗震设计方法研究方案[J].土木建筑与环境工程,2010,32(2):291-297.(WANG Yayong,GAO Mengtan,YE Lieping,et al.Study on design method of building seismic design based on collapse rate under rare and very rare ground motion[J].Journal of Civil,Architectural&Environmental Engineering,2010,32(2):291-297.(in Chinese))
    [5]叶列平,曲哲,陆新征,等.提高建筑结构抗地震倒塌能力的设计思想与方法[J].建筑结构学报,2008,29(4):42-50.(YE Lieping,QU Zhe,LU Xinzheng,et al.Collapse prevention of building structures:a lesson from the Wenchuan earthquake[J].Journal of Building Structures,2008,29(4):42-50.(in Chinese))
    [6]胡聿贤.工程地震学[M].北京:地震出版社,2006:354.(HU Yuxian.Earthquake engineering[M].Beijing:Seismological Press,2006:354.(in Chinese))
    [7]叶列平,陆新征,赵世春,等.框架结构抗地震倒塌能力的研究[J].建筑结构学报,2009,30(6):67-76.(YE Lieping,LU Xinzheng,ZHAO Shichun,et al.Seismic collapse resistance of RC frame structures[J].Journal of Building Structures,2009,30(6):67-76.(in Chinese))
    [8]Lu Xiao,Lu Xinzheng,Zhang Wangkai,et al.Collapse simulation of a super high-rise building subjected to extremely strong earthquakes[J].Science China:Tech Science,2011,54(10):2549-2560.
    [9]施炜,叶列平,陆新征,等.不同抗震设防RC框架结构抗倒塌能力的研究[J].工程力学,2011,28(3):41-68.(SHI Wei,YE Lieping,LU Xinzheng,et al.Study on the collapse-resistant capacity of RC frames with different seismic fortification levels[J].Engineering Mechanics,2011,28(3):41-68.(in Chinese))
    [10]汤保新,叶列平,陆新征.丙类与乙类设防RC框架结构抗地震倒塌能力对比[J].建筑结构学报,2011,32(10):30-38.(TANG Baoxin,YE Lieping,LU Xinzheng.Comparison of collapse-resistant capacities of RC frames with seismic fortification categories B and C[J].Journal of Building Structures,2011,32(10):30-38.(in Chinese))
    [11]陆新征,唐代远,叶列平,等.我国7度设防等跨RC框架抗地震倒塌能力研究[J].地震工程与工程振动,2011,31(5):13-20.(LU Xinzheng,TANG Daiyuan,YE Lieping,et al.Study on the seismic collapse resistance of RC frame structures with equal spans in zones with seismic intensityⅦ[J].Journal of Earthquake Engineering and Engineering Vibration,2011,31(5):13-20.(in Chinese))
    [12]赵宪忠,闫伸,陈以一.大跨度空间结构连续性倒塌研究方法与现状[J].建筑建构学报,2013,34(4):1-14.(ZHAO Xianzhong,YAN Shen,CHEN Yiyi.A review on progressive collapse study for Large-span space structures[J].Journal of Building Structures,2013,34(4):1-14.(in Chinese))
    [13]Vamvatsikos D,Cornell C A.Incremental dynamic analysis[J].Earthquake Engineering and Structural Dynamics,2002,31(3):491-514.
    [14]FEMA.Quantification of building seismic performance factors[R].Report No.FEMAP695.Washington DC:Applied Technology Council,Federal Emergency Management Agency,2009.
    [15]ATC-63 Recommended methodology for quantification of building system performance and response parameters:75%interim draft report[R].Redwood City,CA:Applied Technology Council,2007.
    [16]Gregory G D,Abbie B L,Curt B H,et al.Assessing building system collapse performance and associated requirements for seismic design[C]//Proceedings of the SEAOC 76th Annual Convention.Sacramento,California:Structural Engineers Association of California,2007:1-14.
    [17]高孟潭,张晓梅.关于地震动参数区划图几个重要参数的讨论[C]//中国地震区划学术讨论会文集.北京:地震出版社,1998:45-53.(GAO Mengtan,ZHANG Xiaomei.Discussion on several important parameters of seismic zonation map[C]//China Symposium on Seismic Zonation.Beijing:Seismological Press,1998:45-53.(in Chinese))
    [18]胡聿贤.有关设计地震动的几个问题[J].土木工程学报,1993,26(2):1-8.(HU Yuxian.Some problems on design earthquake motion[J].China Civil Engineering Journal,1993,26(2):1-8.(in Chinese))
    [19]FEMA.NEHRP recommended seismic provisions for new Buildings and other structures[R].Report No.FEMAP750.Washington DC:Applied Technology Council,Federal Emergency Management Agency,2009:1-388.
    [20]GB 18306—2001中国地震动参数区划图[S].北京:中国标准出版社,2001.(GB 18306—2001Seismic ground motion parameter map of China[S].Beijing:China Standard Press,2001.(in Chinese))
    [21]GB 50011—2010建筑抗震设计规范[S].北京:中国建筑工业出版社,2010.(GB 50011—2010 Code for seismic design of buildings[S].Beijing:China Architecture&Building Press,2010.(in Chinese))
    [22]高小旺,鲍霭斌.用概率方法确定抗震设防标准[J].建筑结构学报,1986,7(2):55-63.(GAO Xiaowang,BAO Aibin.Determination of anti-seismic level by probabilistic method[J].Journal of Building Structures,1986,7(2):55-63.(in Chinese))
    [23]中国地震局.《中国地震动参数区划图》(GB18306—2001)第1号修改单[B].北京:国家标准化管理委员会,2008.
    [24]Luco N.Ellingwood B R,Hamburger R O.Risktargeted approach to selecting return periods for design maps[C]//Proceedings of the 3rd ATC-35/USGS National Earthquake Ground-Motion Mapping Workshop.Redwood City,USA:Applied Technology Council,2006.
    [25]Luco N,Ellingwood B R,Hamburger R O,et al.Risktargeted versus current seismic design maps for the conterminous United States[C]//Proceedings of the SEAOC 76th Annual Convention.Sacramento,California:Structural Engineers Association of California,2007:1-13.
    [26]ASCE 43-05 Seismic design criteria for structures systems and components in nuclear facilities[S].Reston,VA:American Society of Civil Engineers,2005.
    [27]Mc Guire R K.Seismic hazard and risk analysis[M].Oakland,CA:Earthquake Engineering Research Institute,2004:221.
    [28]汪素云,俞言祥,高阿甲,等.中国分区地震动衰减关系的确定[J].中国地震,2000,16(2):99-106.(WANG Suyun,YU Yanxiang,GAO Ajia,et al.Development of attenuation relations for ground motion in China[J].Earthquake Research in China,2000,16(2):99-106.(in Chinese))
    [29]GB/T 17742—2008中国地震烈度表[S].北京:中国标准出版社,2008.(GB/T 17742—2008 The Chinese seismic intensity scale[S].Beijing:China Standard Press,2008.(in Chinese))
    [30]陈鲲,高孟潭.地震动参数区划中的不确定性分析[J].地震学报,2010,32(2):184-192.(CHEN Kun,GAO Mengtan.Analysis on the uncertainty in ground motion zoning map of China[J].Acta Seismologica Sinica,2010,32(2):184-192.(in Chinese))

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心