引文
[1]郭陕云.关于我国海底隧道建设若干工程技术问题的思考[J].隧道建设,2007,27(7):1–5.(GUO Shanyun.Comments on some engineering and technical issues related to building subsea tunnels in China[J].Tunnel Construction,2007,27(7):1–5.(in Chinese))
[2]孙钧.海底隧道工程设计施工若干关键技术的商榷[J].岩石力学与工程学报,2006,25(8):1513–1521.(SUN Jun.Discussion on some key technical issues for design and construction of undersea tunnels[J].Chinese Journal of Rock Mechanics and Engineering,2006,25(8):1513–1521.(in Chinese))
[3]TSUJI H,SAWADA T,TAKIZAWA M.Extraordinary inundation accidents in the Seikan undersea tunnel[J].International Journal of Rock Mechanics and Mining Sciences and Geomechanics Abstracts,1996,33(1):1–14.
[4]WALLIS S.Freezing under the sea rescues Oslofjord highway tunnel[M].[S.l.]:[s.n.],1999:19–26.
[5]刘志刚,刘秀峰.TSP(隧道地震勘探)在隧道隧洞超前预报中的应用与发展[J].岩石力学与工程学报,2003,22(8):1399–1402.(LIU Zhigang,LIU Xiufeng.TSP application and development in tunnel ahead forecast[J].Chinese Journal of Rock Mechanics and Engineering,2003,22(8):1399–1402.(in Chinese))
[6]李术才,薛翊国,张庆松,等.高风险岩溶地区隧道施工地质灾害综合预报预警关键技术研究[J].岩石力学与工程学报,2008,27(7):1297–1307.(LI Shucai,XUE Yiguo,ZHANG Qingsong,et al.Key technology study on comprehensive prediction and early-warning of geological hazards during tunnel construction in high-risk karst areas[J].Chinese Journal of Rock Mechanics and Engineering,2008,27(7):1297–1307.(in Chinese))
[7]钟世航.用陆地声纳法与微分电测深结合探查岩溶、洞穴[J].物探与化探,2003,27(3):240–243.(ZHONG Shihang.The combination of landsonar and differential electrical sounding for exploration of karst and underground caves[J].Geophysical and Geochemical Exploration,2003,27(3):240–243.(in Chinese))
[8]何发亮,李苍松,陈成宗.隧道地质超前预报[M].成都:西南交通大学出版社,2006.(HE Faliang,LI Cangsong,CHEN Chengzong.Tunnel geology early-warning prediction[M].Chengdu:Southwest Jiaotong University Press,2006.(in Chinese))
[9]赵永贵,刘浩,孙宇,等.隧道地质超前预报研究进展[J].地球物理学进展,2003,18(3):460–464.(ZHAO Yonggui,LIU Hao,SUN Yu,et al.Research progress in tunnel geological early-warning prediction[J].Progress in Geophysics,2003,18(3):460–464.(in Chinese))
[10]王锦山,王力,曹志刚,等.厦门海底隧道综合超前地质预报实践[J].岩石力学与工程学报,2007,26(11):2309–2317.(WANG Jinshan,WANG Li,CAO Zhigang,et al.Practice on synthetic geological prediction ahead of construction of Xiamen subsea tunnel[J].Chinese Journal of Rock Mechanics and Engineering,2007,26(11):2309–2317.(in Chinese))
[11]琚建明.超前地质预报技术在海底隧道施工中的应用[J].铁道工程学报,2007,(7):76–93.(JU Jianming.Application of technologies of geological forecast ahead construction of subsea tunnel[J].Journal of Railway Engineering Society,2007,(7):76–93.(in Chinese))
[12]罗先钰,曾洪贤.青岛海底隧道F3断裂分析评价[J].铁道勘察,2006,(5):61–70.(LUO Xianyu,ZENG Hongxian.Analysis and evaluation on fracture F3in Qingdao subsea tunnel[J].Railway Investigation and Surveying,2006,(5):61–70.(in Chinese))
[13]李乃胜,于洪军,赵松龄,等.胶州湾自然环境与地质演化[M].北京:海洋出版社,2006.(LI Naisheng,YU Hongjun,ZHAO Songling,et al.Natural environment and geological evolvement in Kiaochow Bay[M].Beijing:China Ocean Press,2006.(in Chinese))
[14]肖书安,吴世林.复杂地质条件下的隧道地质超前探测技术[J].工程地球物理学报,2004,1(2):159–165.(XIAO Shu′an,WU Shilin.Geological prediction technique for tunnel construction under complex geological conditions[J].Chinese Journal of Engineering Geophysics,2004,1(2):159–165.(in Chinese))
[15]李大心.探地雷达方法与应用[M].北京:地质出版社,1994.(LI Daxin.Ground penetrating radar method and its application[M].Beijing:Geological Publishing House,1994.(in Chinese))
[16]李貅,郭文波.瞬变电磁法在煤田矿井涌水通道勘察中的应用[J].西安工程学院学报,2000,22(3):35–38.(LI Xiu,GUO Wenbo.Application TEM to exploration of water gushing channel way in coal field[J].Journal of Xi′an Engineering University,2000,22(3):35–38.(in Chinese))