引文
[1]张家明.西安地裂缝研究[M].西安:西北大学出版社,1990.(ZHANG Jia-ming.Research on ground fissures in the region of Xi’an[M].Xi’an:Northwest University Press,1990.(in Chinese))
[2]LEE C F,ZHANG J M,ZHANG Y X.Evolution and origin of the ground fissures in Xian,China[J].Engineering Geology,1996,43:45–55.
[3]李永善.西安地裂缝及渭河盆地活断层研究[M].北京:地震出版社,1992.(LI Yong-shan.Research on ground fissures in xi’an region and active faults in Weihe basin[M].Beijing:Seismic Press,1992.(in Chinese))
[4]王景明.地裂缝及其灾害的理论分析与应用[M].西安:陕西科学技术出版社,2000.(WANG Jing-ming.Theory of ground fissures hazards and its application[M].Xi’an:Shaanxi Science and Technology Press,2000.(in Chinese))
[5]彭建兵.渭河盆地活动断裂与地质灾害[M].西安:西北大学出版社,1992.(PENG Jian-bing.Active faults and geological hazards in Weihe basin[M].Xi’an:Northwest University Press,1992.(in Chinese))
[6]武强,陈佩佩.地裂缝灾害研究现状与展望[J].中国地质灾害与防治学报,2003,14(1):22–27.(WU Qiang,CHEN Pei-pei.Research on state of art and prospect of earth fissures[J].Chinese Journal of Geological Hazard and Control,2003,14(1):22–27.(in Chinese))
[7]王庆良,刘玉海,陈志新,等.抽水引起的含水层水平应变—地裂缝活动新机理[J].工程地质学报,2002,10(1):46–50.(WANG Qing-liang,LIU Yu-hai,CHEN Zhi-xin,et al.Horizontal strain of aquifer induced by ground water pumping—a new mechanism for ground fissure movement[J].Journal of Engineeing Geology,2002,10(1):46–50.(in Chinese))
[8]师亚琴.跨西安地裂缝建设一般建筑物的可能性探讨[J].灾害学,2001,16(2):76–81.(SHI Ya-qin.Discussion on possibility to construct ordinary buildings across ground fissures in Xi’an[J].Journal of Catastrophology,2001,16(2):76–81.(in Chinese))
[9]DBJ61—6—2006,J10821—2006西安地裂缝场地勘察与工程设计规程[S].2006.(DBJ61—6—2006,J10821—2006 Specification for site investigation and engineering design on Xi’an ground fractures[S].2006.(in Chinese))
[10]毛应生,柳丽英,王德信,等.西安市地裂对市政构筑物的破坏机理与对策的探讨[J].城市道桥与防洪,2002(2):1–6.(MAO Ying-sheng,LIU Li-ying,WANG De-xin,et al.Approach to mechanism and countermeasure of municipal structures destroyed by ground cracking in Xi’an City[J].Urban Roads Bridges&Flood Control,2002(2):1–6.(in Chinese))
[11]范文,邓龙胜,彭建兵,等.地铁隧道穿越地裂缝带的物理模型试验研究[J].岩石力学与工程学报,2008,27(9):1917–1923.(FAN Wen,DENG Long-sheng,PENG Jian-bing,et al.Study on the physical model experiment of subway tunnel crossing the ground fisure belt[J].Chinese Journal of Rock Mechanics and Engineering,2008,27(9):1917–1923.(in Chinese))
[12]黄强兵,彭建兵,门玉明,等.地裂缝对地铁明挖整体式衬砌隧道影响机制的模型试验研究[J].岩石力学与工程学报,2008,27(11):2324–2331.(HUANG Qiang-bing,PENG Jian-bing,MEN Yu-ming,et al.Model test study on effect of ground fissure on open-cut metro tunnel with integral lining[J].Chinese Journal of Rock Mechanics and Engineering,2008,27(11):2324–2331.(in Chinese))
[13]邓亚虹,彭建兵,范文,等.地裂缝活动环境下盾构隧道双层衬砌性状分析[J].岩石力学与工程学报,2008,27(增2):3861–3867.(DENG Ya-hong,PENG Jian-bing,FAN Wen,et al.Analysis of double-layer liner’s behaviors of shield tunnel under the environment of moving ground-fissures[J].Chinese Journal of Rock Mechanics and Engineering,2008,27(S2)3861–3867.(in Chinese))
[14]彭建兵,范文,黄强兵.西安市城市快速轨道交通二号线穿过地裂缝带的结构措施专题研究[R].西安:长安大学,铁道第一勘察设计院,2006.(PENG Jian-bing,FAN Wen,HUANG Qiang-bing.Special research on structural measurements of Xi’an urban express track traffic No.2 going through ground fissures[R].Xi’an:Chang’an University,China Railway First Survey and Design Institute,2006.(in Chinese))
[15]黄强兵,彭建兵,范文,等.西安地铁二号线沿线地裂缝未来位错量估算及工程分级[J].工程地质学报,2007,15(4):469–474.(HUANG Qiang-bing,PENG Jian-bing,FAN Wen,et al.Estimation of the maximum displacement of ground fissures along Xi’an Metro Line 2 and its engineering classification[J].Journal of Engineering Geology,2007,15(4):469–474.(in Chinese))
[16]STIRBYS Anthony F,RADWANSKI Z Richard,et al.Los Angeles metro rail project-geologic and geotechnical design and construction constraints[J].Engineering Geology,1999,51:203–224.
[17]SHAHIDI A R,VAFAEIAN M.Analysis of longitudinal profile of the tunnels in active faulted zone and designing the flexible lining(for Koohrang-Ⅲtunne l)[J].Tunnelling and Underground Space Technology,2005,20:213–221.
[18]陕西大地地震工程勘察中心.西安地裂缝与轨道交通#2线防裂防渗研究[R].西安:陕西大地地震工程勘察中心,2006.(Shaan Xi Geodetic Seismic Survey Center.Research on crack-control and antiseep measures of Xi’an Metro Line 2 going through the ground fissures[R].Xi’an:Shaanxi Geodectic Seismic Survey Center 2006.(in Chinese))
[19]樊红卫.西安地铁一号线通过地裂缝对策研究[C]//中国交通运输协会城市轨道交通专业委员会首届中青年专家论文集,北京:2002:105–109.(FAN Hong-wei.Study on the countermeasure for the Xi’an Metro Line 1 to transverse ground fissure[C]//The First Young Experts’Proceedings of Urban Track Transportation Professional Committee of China Transport Association,Beijing,2002:105–109.(in Chinese))
[20]杨育僧.西安地铁二号线区间隧道通过地裂缝带方案探讨[J].都市快轨交通,2006,19(3):67–69.(YANG Yu-seng.A scheme for the transit tunnels of Xi’an Metro Line 2 to pass through ground fissures[J].Urban Rapid Rail Transit,2006,19(3):67–69.(in Chinese)).
[21]张雪松,邓景纹,董云德.上海地铁车站结构防水措施评述[J].土木工程学报,2000,33(5):107–110.(ZHANG Xue-song,DENG Jing-wen,DONG Yun-de.The evaluation of water-proofing work for Shanghai Metro stations[J].China Civil Engineering Journal,2000,33(5):107–110.(in Chinese))
[22]高树东.深圳地铁一期工程混凝土结构自防水措施研究[J].现代隧道技术,2002,39(1):24–28.(GAO Shu-dong.Study on self-waterproofing for concrete structure of phase I project,Shenzhen Metro[J].Modern Tunnelling Technology,2002,39(1):24–28.(in Chinese))