钢吊箱围堰是高桩承台施工的最重要的施工阶段之一,为了确保其安全性,需对钢吊箱施工过程的力学性能进行全面分析。根据崇启长江大桥主墩钢吊箱的施工工艺过程,首先分析了钢吊箱施工过程需要考虑的各种计算工况,然后通过ANSYS软件建立对应的有限元模型,对钢吊箱在各种施工工况下的力学性能进行了分析,给出了在各工况下钢吊箱的受力特性。分析表明:钢吊箱整体设计合理,在各个施工工况,整体应力水平较低,结构安全可靠,抽水工况为最不利工况。该分析结果对以后钢吊箱设计与施工具有指导意义。
The construction of Steel Suspension Box Cofferdam(SSBC)is an important procedure for constructing elevated pile cap.To ensure its safety,the mechanical property of SSBC during its construction process should be analyzed completely.Based on the construction of Chongqi Yangtze River bridge primary pier SSBC,the analysis cases were presented.By the use of ANSYS finite element analysis software,the corresponding finite element model was set up in the article.The mechanical properties of SSBC in various working conditions were analyzed.The result shows that the intergral design of SSBC is reasonable,the whole stress level is low in every working condition,the structure is safe and reliable and water pumping is the worst working condition,which will do help the design and construction of SSBC in the future.
引文
[1]孙旻,徐伟.苏通大桥6号墩钢吊箱施工阶段有限元分析[J].施工技术,2005,34(1):12-14.Sun M,Xu W.The Application of finite-elementanalysis to the steel lifting caisson of the sixth pier ofsutong bridge in construction process[J].ConstructionTechnology,2005,34(1):12-14.(in Chinese)
    [2]中华人民共和国交通部.JTJ 213—98海港水文规范[S].北京:人民交通出版社,1998.Ministry of Communication of the People’s Republic ofChina.JTJ 213—98 Code of Hydrology for Sea Harbour[S].Beijing:China Communications Press,1998.(inChinese)
    [3]中华人民共和国建设部.GB 50009—2001建筑结构荷载规范[S].北京:中国建筑工业出版社,2001.Ministry of Housing and Urban-Rural Development ofthe People’s Republic of China.GB 50009—2001Load code for the design of building structures[S].Beijing:China Architecture and Building Press,2001.(in Chinese)
    [4]中华人民共和国交通部.JSJ 215—98港口工程荷载规范[S].北京:人民交通出版社,1998.Ministry of Communication of the People’s Republic ofChina.JSJ 215—98 Lode Code for HarbourEngineering[S].Beijing:China CommunicationsPress,1998.(in Chinese)
    [5]谢小松,徐伟,宋灿,等.深水高桩承台哑铃状钢吊箱在地震作用下的响应分析[J].结构工程师,2005,21(6):43-45.Xie X S,Xu W,Song C,et al.Response analysis ofelevated pile foundation dumbbell-shape steelsuspending cofferdam in deep water under seismicaction[J].Structural Engineers,2005,21(6):43-45.(in Chinese)
    [6]吴加云,徐伟,邹建文.特大型钢吊箱在波浪荷载作用下动力响应研究[J].岩土工程学报,2008,30(S):234-237.Wu J Y,Xu W,Zou J W.Dynamic property of hugesteel suspending cofferdam under wave load[J].Chinese Journal of Geotechnical Engineering,2008,30(S):234-237.(in Chinese)
    [7]骆艳斌,徐伟,宋灿.钢吊箱整体起吊时力学性能分析[J].公路交通科技,2006,23(12):95-98.Luo Y B,Xu W,Song C.Analysis on mechanicalproperty of steel suspension box during integral lifting[J].Journal of Highway and Transportation Researchand Development,2006,23(12):95-98.(in Chinese)
    [8]周玉娟,曾健,彭强.苏通长江大桥4号主墩钢吊箱设计[J].中国港湾建设,2007,150(4):17-23.Zhou Y J,Zeng J,Peng Q.Design of steel-shelled formfor main pier No.4 Sutong bridge[J].China HarbourEngineering,2007,150(4):17-23.(in Chinese)
    [9]徐伟,高吉龙.特大型钢吊箱围堰施工过程中各工况的受力特性分析[J].建筑施工,2008,30(6):487-489.Xu W,Gao J L.Mechanical analysis of suspendedsuper-huge steel box cofferdam under differentconstruction conditions[J].Building Construction,2008,30(6):487-489.(in Chinese)