摘要
超小净距隧道钻爆法施工过程中,爆破产生的地震波不可避免地对先行隧道衬砌结构产生损伤,会危及其安全和稳定性。南京地铁隧道二号线工程实践,最小净距仅0.309 m,远小于隧道设计规范规定值,进行CRD工法的爆破全过程系统现场试验,分析先行洞衬砌在不同爆破方式作用下的振动波传播及分布规律,结果表明:上台阶爆破时先行洞迎爆侧衬砌产生的振速较大,但切向和水平相差不大,应将上台阶的爆破作为爆破控制的重点,选择合理的掏槽形式和掏槽位置,可以为后续爆破创造足够好的临空面;下台阶爆破对先行洞产生的振速较小,一般不会大于10 cm/s;上下台阶同时爆破作业产生的振速最大,超过爆破安全规程规定值20 cm/s,因此小净距隧道禁止上下台阶同时爆破。
In the case of super-small-distance tunnels,due to the tunnel with small clear space,seismic wave generated must damage tunnel lining inevitably and influence its safety and stability.Combined with No 2 line of Nanjing metro with small clear space,its clear space is 0.309 m which is much less than the prescribed value of "Code for Design of Tunnel".The monitoring of blasting vibration was carried out systematically for the completed construction blasting process of CRD method.The in-situ monitoring of blasting vibration was carried out.The propagation and distribution of vibration waves were analyzed of existing tunnel lining with different blasting methods.The meaning conclusions were presented.It shows that lining vibration velocity of existing adjacent tunnel is higher when upper bench blasting method is adopted,but it is just about for tangential and horizontal level.So attention of monitored blasting is focused on upper bench.Rational cut-hole patterns and position are selected for better blasting face of subsequent blasting.Lining vibration velocity of existing adjacent tunnel decrease when lower bench blasting method is adopted,which is less than 10cm/s generally.Lining vibration velocity of existing adjacent tunnel is highest when upper and lower bench blasting synchronously method is adopted,which is more than 20 cm/s about the prescribed value of "Safety Regulations for Blasting",so upper and lower bench blasting synchronously is prohibited for closely-spaced running tunnels.
引文
[1]中华人民共和国交通部.JTG D70-2004,公路隧道设计规范[S].北京:人民交通出版社,2004.Ministry of Transport of the Peoples Republic of China.JTG D70-2004,Code for design of road tunnels[S].Beijing:China Communications Press,2004.
    [2]彭立敏,雷明锋,施成华,等.等维灰数递补技术在隧道地表沉降预测中的研究与应用[J].铁道科学与工程学报,2008,5(2):52-56.PENG Li-min,LEI Ming-feng,SHI Cheng-hua,et al.Research and application of the same dimension gray re-currence technique for surface settlement prediction intunnel[J].Journal of Railway Science and Engineering,2008,5(2):52-56.
    [3]龚建伍,夏才初,郑志东,等.鹤上三车道小净距隧道爆破振动测试与分析[J].岩石力学与工程学报,2007,26(9):1882-1887.GONG Jian-wu,XIA Cai-chu,ZHENG Zhi-dong,et al.Measurement and analysis of blasting vibration in Heshangthree-lane tunnels with small clear space[J].ChineseJournal of Rock Mechanics and Engineering,2007,26(9):1882-1887.
    [4]李俊光,黄鑫,杨小礼.城市隧道下穿电缆隧道时的数值计算分析及变形沉降预测[J].铁道科学与工程学报,2008,5(1):68-71.LI Jun-guang,HUANG Xin,YANG Xiao-li.Numericalsimulation and settlement prediction of subway locatingunder cable tunnels[J].Journal of Railway Science andEngineering,2008,5(1):68-71.
    [5]齐景岳,刘正雄,张儒林,等.隧道爆破现代技术[M].北京:中国铁道出版社,1995.QI Jing-yue,LIU Zheng-xiong,ZHANG Ru-lin,et al.Modern technology for tunnel blasting[M].Beijing:Chi-nese Railway Press,1995.
    [6]李海波,蒋会军,赵坚,等.动荷载作用下岩体工程安全的几个问题[J].岩石力学与工程学报,2003,22(11):1887-1891.LI Hai-bo,JIANG Hui-jun,ZHAO Jian,et al.Someproblems about safety analysis of rock engineering underdynamic load[J].Chinese Journal of Rock Mechanicsand Engineering,2003,22(11):1887-1891.
    [7]雷金山,阳军生,王安正,等.压力分散型锚索锚固段受力特性分析[J].铁道科学与工程学报,2010,7(3):60-64.LEI Jin-shan,YANG Jun-sheng,WANG An-zheng,et al.Mechanical analysis on anchoring segment of pressure-dispersive cable[J].Journal of Railway Science and En-gineering,2010,7(3):60-64.
    [8]尚守平,余俊,王海东,等.爆破模拟地震研究[J].铁道科学与工程学报,2007,4(1):24-27.SHANG Shou-ping,YU Jun,WANG Hai-dong,et al.Study on blasting vibration simulating earthquake[J].Journal of Railway Science and Engineering,2007,4(1):24-27.
    [9]Mandal S K,Singh MM.Evaluating extent and causes ofoverbreak in tunnels[J].Tunnelling and UndergroundSpace Technology,2009,24(1):22-36.
    [10]曹孝君,张继春,吕和林.隧道掘进爆破引起地表振动的数值模拟与现场监测分析[J].中国公路学报,2007,20(2):87-91.CAO Xiao-jun,ZHANG Ji-chun,L He-lin.Numericalsimulation and field monitoring analysis on surface vibra-tion resulted from tunnel driving blasting[J].ChinaJournal of Highway and Transport,2007,20(2):87-91.